Consolidated Construction Project addendum 0003 is hereby added.
View the file
Other files for this federal contract opportunity
Show all 50
Consolidated Construction Project has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment is issued to incorporate responses to questions received. No additional questions w ill be answ ered until aw ard is made.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LN18B5002
X 9B. DATED (SEE ITEM 11)
22-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2018
CODE
158 FW/MSC (F9P3MC)
158 CONTRACT ADMINISTRATOR - WAWF FA6451
45 NCO DRIVE, SUITE A
BURLINGTON VT 05403-5873
W912LN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912LN18B5002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUBJECT: Questions - Consolidated Construction Project:
COMMENTS
Comment: CURZ182301 – Please clarify the specific door hardware required for Bid Option #1 under "Repaint Munitions (MUNS) Doors".
Reply: VTANG archived records contain record drawings B321, B322, B323 Latch Shop Drawings attached to Statement of Work. Model called out in drawing is Adhaco Two-Point Vertical Slam Type Latch, Type H-110.
Comment: Is a clearer drawing file available for the original munitions doors design drawing?
Reply: No. Only scanned as builts are available as attached to Statement of Work.
Comment: Do the inactive doors for doors B321, B322 and B323 get new latching hardware also under the "Repainting Munitions Doors" option #1? If so, please provide a specification.
Reply: VTANG archived records contain record drawings B321, B322, B323 Latch Shop Drawings attached to Statement of Work. Model called out in drawing is Adhaco Two-Point Vertical Slam Type Latch, Type H-110.
Comment: Is the new door latching hardware for doors B321, B322 and B323 surface mounted or concealed?
Reply: Installation of hardware is a interior surface mount. See as-built drawings and photos attached to the original statement of work.
Comment: The window for painting outside is fairly short after September. Is there any flexibility on the completion of painting the bunker doors after the 180 day period?
Reply: The contractor can request a pause in the 180 day period project duration if weather conditions are not favorable to executing the munitions door repainting work. The 180 day period will continue when favorable weather conditions return.
Comment: I was looking through the statement of work for the 2018 POL EFSO repair and on page 5 Part 4 it is calling for EMT conduit. EMT cannot be run underground and is not for explosion proof areas. Can you get clarification as to whether this should be IMC or RMC conduit?
Reply: Use RMC conduit where EMT is called out. Comply with all applicable federal and state codes for explosion proof enclosures and conduits where necessary.
W912LN18B5002
Comment: It is assumed that when we are doing the crack sealing work that the parking lots being sealed will be free from cars and that the cracking sealing crew will work a continuous work day in one location from 7am to 3:30pm and that there will be minimal traffic control required for this work to take place.
Reply: Correct, the contractor shall notify CE work control at lease 48 hours in advance of any work to be performed for crack sealing in order to coordinate vehicles being moved.
Comment: It is assumed that when we are doing the crack sealing work that the parking lots being sealed will be free from cars and that the cracking sealing crew will work a continuous work day in one location from 7am to 3:30pm and that there will be minimal traffic control required for this work to take place.
Reply: Correct, the contractor shall notify CE work control at lease 48 hours in advance of any work to be performed for crack sealing in order to coordinate vehicles being moved.
Comment: Under the summary of the work for crack sealing and line stripping it says we have 60 days from the notice to proceed to complete this work but the solicitation states we have 180 days to complete the work. Please clarify.
Reply: The crack sealing and line striping is to be executed within 60 days from the notice to proceed.
(End of Summary of Changes)