18B50002_0002.pdf

PDF 140 KB Posted

Attached to
Consolidated Construction Project Federal contract opportunity
Solicitation number
W912LN-18-B-5002
Issued by
Department of the Army Vermont Army National Guard

About this file

Amendment 0002 - Response to question received 17 Aug 18

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Construction Project, newest first.
File Type Posted
W912LN18C5003.pdf PDF
OF_1419A_18B5002_02.pdf PDF
OF_1419_18B5002_01.pdf PDF
Bid_Abstract_-_Consolidated_Construction_Project.xlsx XLSX spreadsheet
18B5002_0003.pdf PDF
UFC_3-190-06_Protective_Coatings_and_Paints.pdf PDF
DSC05262.jpg JPG image
DSC05260.jpg JPG image
18B5002_0001.pdf PDF
DSC05263.jpg JPG image
B325 L.jpg JPG image
B325 M.jpg JPG image
Repaint_MUNS_doors.zip ZIP file
2018 Base Pavement Repairs-Main Gate.pdf PDF
2018 Base Pavement Repairs-Overall Plan.pdf PDF
EFSO.zip ZIP file
B325 D.jpg JPG image
B326 Left.jpg JPG image
B325 P.jpg JPG image
CURZ 182311 PROJECT MANUAL 2018 Base Pavement Repairs.pdf PDF
B321 Door.jpg JPG image
C-1 VTANG Site Plan.pdf PDF
B325 E.jpg JPG image
B325 F.jpg JPG image
C-2 Project Site Plan.pdf PDF
B326 Center.jpg JPG image
B325 N.jpg JPG image
B326 Right.jpg JPG image
B325 H.jpg JPG image
C1 POL EFSO LOCATION & ELECTRICAL DISTRIBUTION SITE PLAN.pdf PDF
SOW Repaint MUNS doors.pdf PDF
2018 Base Pavement Repairs-North.pdf PDF
EFSO SOW.pdf PDF
2018 Base Pavement Repairs-MSA.pdf PDF
B322 Door.jpg JPG image
B325 A.jpg JPG image
B325 T.jpg JPG image
B325 C.jpg JPG image
B321, B322,B323 Latch Shop Drawings.jpg JPG image
B325 J.jpg JPG image
18B5002_4_AUG_18.pdf PDF
B325 B.jpg JPG image
B325 G.jpg JPG image
B325 K.jpg JPG image
B323 Door.jpg JPG image
B325 R.jpg JPG image
B325 U.jpg JPG image
B325 S.jpg JPG image
2018 Base Pavement Repairs-Center.pdf PDF
2018 Base Pavement Repairs-South.pdf PDF
Show all 50

Consolidated Construction Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. This amendment is issued to incorporate a response to a question received 17 Aug 18.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LN18B5002

X 9B. DATED (SEE ITEM 11)

22-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2018

CODE

158 FW/MSC (F9P3MC)

158 CONTRACT ADMINISTRATOR - WAWF FA6451

45 NCO DRIVE, SUITE A

BURLINGTON VT 05403-5873

W912LN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912LN18B5002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUBJECT: Question - Consolidated Construction Project:

COMMENTS

Comment: CURZ182301 – I do not find the Paint Spec in the available information. Do you have a special one or do we supply a recommended paint system to you?

Reply: UFC 3-190-06, Appendix A, Military Handbook 1110 Protective Coatings and Paints section

4.4.3 lists recommendations for steel coatings. Provide a coating system as stated in the section, or a system that provides equivalent protection. See attached for UFC reference.

(End of Summary of Changes)

File details come from the government source that posted it.