EXHIBITE.doc

DOC document 15 KB Posted

Attached to
Northern California MATOC Federal contract opportunity
Solicitation number
W912LA-10-R-0004
Issued by
Department of the Army California Army National Guard

About this file

Exhibit E

View the file

Other files for this federal contract opportunity

Other files attached to Northern California MATOC, newest first.
File Type Posted
Questions and Answers V.doc DOC document
Questions and Answers IV.doc DOC document
EXHIBITC.doc DOC document
Amendment 1.pdf PDF
EXHIBITA.doc DOC document
Questions and Answers III.doc DOC document
Northern California MATOC Pre-Proposal Conference.ppt PPT presentation
Pre-Proposal Conference Sign-In Sheet.pdf PDF
Questions and Answers II.doc DOC document
EXHIBITA.doc DOC document
Questions and Answers.doc DOC document
EXHIBITA.doc DOC document
EXHIBITC.doc DOC document
PrototypicalProjectPlans-Part1.pdf PDF
PrototypicalProjectSpecifications.pdf PDF
EXHIBITB.doc DOC document
W912LA-10-R-0004.pdf PDF
EXHIBITG.doc DOC document
PrototypicalProjectPlans-Part2.pdf PDF
EXHIBITF.doc DOC document
EXHIBITE-1.doc DOC document
EXHIBITD.doc DOC document
Sources Sought Information Request Form.pdf PDF
Sources Sought Information Request Form.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC RFP W912LA-10-R-0004

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, PROPOSAL FORM

Date: May 14, 2010

PROJECT TITLE AND NO.: Construct/Repair Fire Main and Hydrants, Fresno Yosemite International ANG, PN #HAYW062287

PROJECT DESCRIPTION: Construct fire water system addition.

MAGNITUDE OF PROJECT: Between $100,000 and $250,000

PERFORMANCE PERIOD: 120 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

LIQUIDATED DAMAGES: ( X) YES or ( ) NO- reference Contract Clause 52.211-12.

CONSTRUCTION: (X ) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.

WAGE DETERMINATION: Currently, General Decision Number CA100029 Modification No. 0 dated 3/12/10 is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

Item Number Description Lump Sum Amount

0001 Construct Fire Water Addition $________________

Option 0001 Water Line/Hydrant $________________

________________________________________________________________
SIGNATURE:COMPANY NAME
Name and title of person authorized to signOffer Date

File details come from the government source that posted it. Updated .