Solicitation Amendment 1 W912L9-20-B-0006.pdf
PDF 136 KB Posted
- Attached to
- Barracks Restoration Project #3 Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0006
- Issued by
- Department of the Army National Guard
About this file
This document provides details for a federal construction contract opportunity with the Department of the Army National Guard. The solicitation seeks a contractor to provide renovation services for Barracks Project 3 at Camp Atterbury in Indiana, including selective demolition, installation of a geo-thermal well system and facility controls, construction of a mechanical room addition, and completion of interior and exterior finishes. The contract value is estimated between $1-5 million. The North American Industry Classification for this requirement is 236220 with a small business size standard of $39.5 million. The pre-bid conference will be held on August 3rd and bids are due by August 28th. The contract period of performance is 240 days. This opportunity is 100% set aside for small businesses. Interested parties must register in SAM before accessing the solicitation on beta.SAM.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Signed Project 3.pdf | ||
| Solicitation Amendment 3 W912L920B00060006.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Solicitation Amendment 2 W912L920B00060002.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Project 3 W912L9-20-B-0006.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP3.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| 007APNDXBCDREPORT4Jul2020.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP3 - 2020.0820.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-3.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments.pdf | ||
| Phase 2 Addendum No 01 BP3.pdf | ||
| eCMRAMemo.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011466825
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) post site visit/pre-proposal conference minutes w ith questions and answ ers to FBO; 2) post list of attendees to site visit/pre-proposal conference to FBO; 3) replace original draw ings to incorporate bathroom fixtures; 4 ;) correct liquidated damages charges per day. Corrected charges are $606.95 per day. 5) Replace AF66 and Statement of Work w ith correctly named files for posting on FBO.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L920B0006
X 9B. DATED (SEE ITEM 11)
06-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2020
CODE
USPFO FOR INDIANA-CAMP ATTERBURY
BLDG 244 EGGLESTON RD
EDINBURGH IN 46124
W912L9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912L920B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $606.95 for each calendar day of delay until the work is completed or accepted. There is also a one-time charge of $153.00 for legal services that will apply.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
(End of Summary of Changes)