102113.19 FL - Plastic Toilet Compartments.pdf
PDF 88 KB Posted
- Attached to
- Barracks Restoration Project #3 Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0006
- Issued by
- Department of the Army National Guard
About this file
This document provides details for a federal construction contract opportunity to renovate barracks buildings at Camp Atterbury in Indiana. The solicitation will require renovations including selective demolition, installation of a geothermal well system, facility controls, a fire suppression system, and mechanical, electrical and plumbing work. Interested offerors must register in SAM and attend the pre-bid conference on August 3rd, with questions due by July 31st. The bid opening is scheduled for August 28th. The contract is set aside for small businesses under NAICS code 236220 with a size standard of $39.5M. The magnitude is between $1-5M, and the period of performance is 240 days after notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Signed Project 3.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Solicitation Amendment 3 W912L920B00060006.pdf | ||
| Solicitation Amendment 2 W912L920B00060002.pdf | ||
| Questions and Answers.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP3.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| 007APNDXBCDREPORT4Jul2020.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP3 - 2020.0820.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-3.pdf | ||
| Phase 2 Addendum No 01 BP3.pdf | ||
| eCMRAMemo.pdf | ||
| Solicitation Amendment 1 W912L9-20-B-0006.pdf | ||
| Solicitation Project 3 W912L9-20-B-0006.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLASTIC TOILET COMPARTMENTS 102113.19 - 1
Camp Atterbury JMTC DLZ Project No. 1963-1020-90
BOQ and Barracks Renovation State of Indiana Project 2020-008
SECTION 102113.19 - PLASTIC TOILET COMPARTMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Solid-plastic toilet compartments configured as toilet enclosures and shower enclosures.
1.3 ACTION SUBMITTALS
A. Product Data:
1. Solid-plastic toilet compartments:
a. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for toilet compartments.
B. Shop Drawings: For solid-plastic toilet compartments.
1. Include plans, elevations, sections, details, and attachment details.
2. Show locations of cutouts for compartment-mounted toilet accessories.
3. Show locations of centerlines of toilet fixtures.
4. Show locations of floor drains.
C. Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors for each type of toilet compartment material indicated.
1. Include Samples of hardware and accessories involving material and color selection.
D. Samples for Verification: Actual sample of finished products for each type of toilet compartment indicated.
1. Size: Manufacturers? standard size.
2. Include each type of hardware and accessory.
PLASTIC TOILET COMPARTMENTS 102113.19 - 2
Camp Atterbury JMTC DLZ Project No. 1963-1020-90
BOQ and Barracks Renovation State of Indiana Project 2020-008
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For toilet compartments.
1.5 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of toilet fixtures, walls, columns, ceilings, and other construction contiguous with toilet compartments by field measurements, and coordinate before fabrication.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with applicable provisions in the U.S. Department of Justice
"2010 ADA Standards for Accessible Design" and ICC A117.1 for toilet compartments designated as accessible.
2.2 SOLID-PLASTIC TOILET AND SHOWER COMPARTMENTS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Accurate Partitions Corp., an ASI Group Company.
2. AJW Architectural Products.
3. Global Partitions Corp., an ASI Group Company.
4. Scranton Products.
B. Toilet and Shower-Enclosure Style: Overhead braced.
C. Door, Panel, and Pilaster Construction: Solid, high-density polyethylene (HDPE) panel material, not less than 1 inch thick, seamless, with eased edges, and with homogenous color and pattern throughout thickness of material.
1. Color and Pattern: One color and pattern in each room as selected by Architect from manufacturer's full range.
D. Pilaster Shoes and Sleeves (Caps): Manufacturer's standard design; polymer or stainless steel.
1. Polymer Color and Pattern: Matching pilaster.
E. Brackets (Fittings):
1. Full-Height (Continuous) Type: Manufacturer's standard design; polymer or extruded aluminum.
a. Polymer Color and Pattern: Matching panel.
PLASTIC TOILET COMPARTMENTS 102113.19 - 3
Camp Atterbury JMTC DLZ Project No. 1963-1020-90
BOQ and Barracks Renovation State of Indiana Project 2020-008
2.3 HARDWARE AND ACCESSORIES
A. Hardware and Accessories, Heavy Duty: Manufacturer's heavy-duty operating hardware and accessories.
1. Hinges: Manufacturer's minimum 0.062-inch-thick stainless steel continuous, cam type that swings to a closed or partially open position, allowing emergency access by lifting door. Mount with through bolts.
2. Latch and Keeper: Manufacturer's heavy-duty, surface-mounted, cast-stainless steel latch unit, designed to resist damage due to slamming, with combination rubber-faced door strike and keeper, and with provision for emergency access. Provide units that comply with regulatory requirements for accessibility at compartments designated as accessible. Mount with through bolts.
3. Coat Hook: Manufacturer's heavy-duty combination cast-stainless steel hook and rubber-tipped bumper, sized to prevent inswinging door from hitting compartment-mounted accessories. Mount with through bolts.
4. Door Bumper: Manufacturer's heavy-duty, rubber-tipped, cast-stainless steel bumper at outswinging doors. Mount with through bolts.
B. Overhead Bracing: Manufacturer's standard continuous, extruded-aluminum head rail with antigrip profile and in manufacturer's standard finish.
C. Anchorages and Fasteners: Manufacturer's standard exposed fasteners of stainless steel, finished to match the items they are securing, with theft-resistant-type heads. Provide sex-type bolts for through-bolt applications. For concealed anchors, use stainless steel, hot-dip galvanized steel, or other rust-resistant, protective-coated steel compatible with related materials.
2.4 MATERIALS
A. Aluminum Castings: ASTM B26/B26M.
B. Aluminum Extrusions: ASTM B221.
2.5 FABRICATION
A. Fabrication, General: Fabricate toilet compartment components to sizes indicated. Coordinate requirements and provide cutouts for through-partition toilet accessories where required for attachment of toilet accessories.
B. Overhead-Braced Units: Provide manufacturer's standard corrosion-resistant supports, leveling mechanism, and anchors at pilasters to suit floor conditions. Provide shoes at pilasters to conceal supports and leveling mechanism.
C. Door Size and Swings: Unless otherwise indicated, provide 24-inch-wide, inswinging doors for standard toilet compartments and 36-inch-wide, outswinging doors with a minimum 32-inch-wide, clear opening for compartments designated as accessible.
PLASTIC TOILET COMPARTMENTS 102113.19 - 4
Camp Atterbury JMTC DLZ Project No. 1963-1020-90
BOQ and Barracks Renovation State of Indiana Project 2020-008
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for fastening, support, alignment, operating clearances, and other conditions affecting performance of the Work.
1. Confirm location and adequacy of blocking and supports required for installation.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION OF PLASTIC TOILET COMPARTMENTS
A. General: Comply with manufacturer's written installation instructions. Install units rigid, straight, level, and plumb. Secure units in position with manufacturer's recommended anchoring devices.
1. Maximum Clearances:
a. Pilasters and Panels: 1/2 inch.
b. Panels and Walls: 1 inch.
2. Full-Height (Continuous) Brackets: Secure panels to walls and to pilasters with full-height brackets.
a. Locate bracket fasteners, so holes for wall anchors occur in masonry or tile joints.
b. Align brackets at pilasters with brackets at walls.
B. Overhead-Braced Units: Secure pilasters to floor and level, plumb, and tighten. Set pilasters with anchors penetrating not less than 1-3/4 inches into structural floor unless otherwise indicated in manufacturer's written instructions. Secure continuous head rail to each pilaster with no fewer than two fasteners. Hang doors to align tops of doors with tops of panels and adjust, so tops of doors are parallel with overhead brace when doors are in closed position.
3.3 ADJUSTING
A. Hardware Adjustment: Adjust and lubricate hardware according to hardware manufacturer's written instructions for proper operation. Set hinges on inswinging doors to hold doors open approximately 30 degrees from closed position when unlatched. Set hinges on outswinging doors to return doors to fully closed position.
END OF SECTION 102113.19