007APNDXBCDREPORT4Jul2020.pdf
PDF 95 KB Posted
- Attached to
- Barracks Restoration Project #3 Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0006
- Issued by
- Department of the Army National Guard
About this file
This document provides details on an upcoming federal contract opportunity for barracks restoration services. The U.S. Property and Fiscal Office for Indiana intends to issue a solicitation to award a firm fixed-price contract for renovation of Barracks Project 3, including interior and exterior alterations, mechanical, electrical and plumbing work, selective demolition, installation of a geo-thermal well system, facility controls, fire suppression system, and site work. The project scope will be verified through statements of work, specifications, and construction drawings. The contract duration is 240 days with a magnitude between $1 million to $5 million. The North American Industry Classification code is 236220 and the size standard is $39.5 million. The solicitation is anticipated to be released on July 27, 2020, with a pre-bid conference on August 3, 2020 and bid opening on August 28, 2020. The solicitation and additional details will be available through the System for Award Management website. This opportunity is set aside 100% for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Signed Project 3.pdf | ||
| Solicitation Amendment 3 W912L920B00060006.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Solicitation Amendment 2 W912L920B00060002.pdf | ||
| Questions and Answers.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP3.pdf | ||
| Solicitation Project 3 W912L9-20-B-0006.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments.pdf | ||
| Phase 2 Addendum No 01 BP3.pdf | ||
| eCMRAMemo.pdf | ||
| Solicitation Amendment 1 W912L9-20-B-0006.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP3 - 2020.0820.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-3.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME and NUMBER
PAY APP NUMBER
LOCATION
DATE
DEBRIS
DIVERTED DIVERTED
FROM FROM
QUANTITY TONS LBS YARDS LANDFILL QUANTITY TONS LBS YARDS LANDFILL
(#) () () () (Y or N) (#) () () () (Y or N)
ABC‐Asphalt OD/I/M ‐ Insulation
ABC‐Brick OD/I/M ‐ OTHER (C&D Other)
ABC‐Concrete OD/I/M ‐ Paper
ABC‐OTHER (C&D Masonry/Asphalt) OD/I/M ‐ Plastic
ABC‐Stone OD/I/M ‐ Siding
Land‐Crushed Stone/Base Recycled C&D Debris
Land‐OTHER (C&D Land Clearing) Wood ‐ Finished
Land‐Soil, Lead‐Tainted, Non‐Hazardous Wood ‐ OTHER (C&D Wood)
Land‐Soil, Petroleum‐Tainted Wood ‐ Structural
Land‐Soil, Subsoil Wood ‐ Treated
Land‐Soil, Top
Land‐Vegetation/Timber (Tree Trunks & Limbs)
Metal‐Aluminum
Metal‐Copper
Metal‐Mixed Metal
Metal‐OTHER (C&D Metal) OTHER:
Metal ‐ Steel OTHER:
OD/I/M ‐ Ceiling Tile OTHER:
OD/I/M ‐ Composition Roof OTHER:
OD/I/M ‐ Doors/Windows/Stairs/Cabinets OTHER:
OD/I/M ‐ Glass OTHER:
OD/I/M ‐ Gypsum/Plaster OTHER:
Project Manager
Construction & Demolition Debris Report PROJECT: 2020‐008, Barracks Phase 2 APPENDIX B
File details come from the government source that posted it. Updated .