RFI_Log_MED-GIB_Responses_posted_23DEC2015.xls

XLS spreadsheet 106 KB Posted

Attached to
Construction of the Dispensary/Health Clinic and General Instruction Building (MED/GIB) in Sea Girt, NJ
Solicitation number
W912KN-15-R-0002
Issued by

About this file

Pre-proposal RFI Log Q and A's posted 23DEC2015. **A 2nd SITE VISIT IS BEING OFFERED ON THURSDAY 7 JAN 2015 at 10 00. SEE RFI MG-008 RESPONSE COLUMN FOR INFO**

View the file

Other files

File Type Posted
15-R-0002_Amendment_0004.pdf PDF
RFI_Log_MED-GIB_as_of_9_FEB_w_Responses_thru_RFI_066.pdf PDF
15-R-0002_Amendment_0003.pdf PDF
15-R-0002_Amendment_0002.pdf PDF
RFI_Log_MED-GIB_as_of_27JAN16_w_Responses_thru_RFI_064.pdf PDF
RFI_MG-064_w_Response-27_Jan_2016_Attachment__1.pdf PDF
RFI_Log_MED-GIB_as_of_14JAN16_w_Responses_thru_RFI_063.pdf PDF
RFI_MG-057_w_Response-14_Jan_2016_Attachment__1.pdf PDF
RFI_Log_MED-GIB_as_of_12JAN16.pdf PDF
RFI_Log_MED-GIB_as_of_8JAN.pdf PDF
15-R-0002_Amendment_00001.pdf PDF
Pre-proposal_2nd_site_visit_sign-in.pdf PDF
Pre-proposal_2nd_Site_Visit_Minutes.pdf PDF
RFI_Log_MED-GIB_as_of_8JAN_(430pm).pdf PDF
Whitman_Report_-_Asbestos_Env'l_Insp_Activities_at_Sea_Girt.pdf PDF
RFI_Log_MED-GIB_as_of_8JAN.pdf PDF
RFI_Log_MED-GIB_as_of_4JAN.pdf PDF
RFI_Log_MED-GIB_Responses_as_of_30-Dec-2015.pdf PDF
RFI_MG-002_w_Response_Attachment__1.pdf PDF
RFI_MG-004_w_Response_Attachment__1.pdf PDF
RFI_MG-005 _006 _ _007_Response_Attachment__1.pdf PDF
RFI_MG-023_ _-024_w_Responses_Attachment__1.pdf PDF
RFI_Log_MED-GIB_(22DEC15).pdf PDF
RFI_Template.doc DOC document
MED-GIB_Pre-proposal_Conference_Minutes.pdf PDF
MED-GIB_pre-proposal_conf_slides.pdf PDF
MED-GIB_Preproposal_sign-in_sheet.pdf PDF
NJARNG_H_Sandy_Sea_Girt_MED-GIB_Issued_for_Construction_Drawings_30-Sept-2014_31-Aug-2015.pdf PDF
Exhibit_C-template.doc DOC document
EXHIBIT_A.pdf PDF
NJARNG_H_Sandy_Sea_Girt_MED-GIB_Issued_for_Construction_Specs1of2_30-Sept-2014_31-Aug-2015.pdf PDF
NJARNG_H_Sandy_Sea_Girt_MED-GIB_Issued_for_Construction_Specs2of2_30-Sept-2014_31-Aug-2015.pdf PDF
EXHIBIT_C.pdf PDF
EXHIBIT_B.pdf PDF
EXHIBIT_D.pdf PDF
15-R-0002_PD2_1442_MEDGIB_solicitation.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOG

USPFO for New Jersey
Project Name:MED/GIB
Project No.340126 / 340128
RFP No.W912KN-15-R-0002
Date Issued:1 DEC 2015
RFI NO MG-DATE RECEIVEDSPEC SECTIONDESCRIPTIONDATE TO ENG./OWNERDATE FROM ENG./OWNERDATE TO CONTRACTORCOMMENTSTURN AROUND
00112/4/15Use alt evals (PPQ, CPARs) in lieu of Exhibit C's12/4/1512/4/2015 (jdm)pre-bid mtgYes, alts are authorized0
00212/14/1531 23 19Spec Section 31 23 19 para 1.6A references Geo-Technical Report, which is missing from the bid documents posted on FBO.
Please provided Geo-Technical Report for bidding purposes.12/15/2015 (jacobs)12/21/1512/21/15The attached is the Geotechnical Investigation Report that was completed in

May-2014 for the NJARNG Sea Girt Superstorm Sandy Disaster Response projects shall be considered Non-Binding Supplemental Information Only for the Contractor's use. The Contract Plans and Specifications have taken into consideration the discussions and recommendations in the report and as such the Contract Plans and Specifications govern as construction requirements. The Contractor is required to verify all existing conditions necessary for proper installation, construction, and operation of all elements indicted in, and in

accordance with the Contract documents. Refer to PDF attachment to this RFI response.7
00312/14/15PPQs auth'd? Email ok vs regular mail?12/15/2015 (jdm)pre-bid mtgYes (see RFI MG-001), and yes0
00412/15/15Door schedule remarks 6 and 10 imply that the six doors having those remarks should be automated; however, when looking at the corresponding hardware sets manual closers are listed and the description ofoperation does not indicate automate usage. Please clarify which doors are being automated and provide a listing of hardwarethat will be included on the doors automated along with a descriptive mode of operation.12/15/2015 (jacobs)12/21/1512/21/151. Doors with Remarks 6 and 10 (on Door Schedule) are to be power assisted

opening doors.

2. Hardware Schedule, Section 3.7 of SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE has been revised. Refer to PDF Attachment (MG-004 Atch - Door Hdw) for Revised Section 3.7.

3. Refer to Section 08 71 13 - Automatic Door Operators for information on power door operators for specified doors.6
00512/17/15CG 501Drawing CG-501Under sequence of construction Note # 4 States Demolish Existing Building #64 and #64T. However, Bid Schedule Items #0002 & 0008 call for Buildings 41,55 & 59. Please clarify.12/18/2015 (jacobs)12/21/1512/21/15Please reference sheets C-101 through C-103 (and Additive Bid Items per Spec Section 01 23 00) for buildings to be demolished under this MED/GIB project. All references to Building #64 & #64T shall be removed from the SEQUENCE OF CONSTRUCTION notes on sheet CG-501 and revised as follows per PDF attachment to this RFI response.4
00612/17/15CG 501Note #10 States Demolish Existing Building # 36 & #65. However, Bid Schedule Items #0002 & 0008 call for Buildings 41,55 & 59. Please clarify.12/18/2015 (jacobs)12/21/1512/21/15Please reference sheets C-101 through C-103 (and Additive Bid Items per Spec Section 01 23 00) for buildings to be demolished under this MED/GIB project. All references to Building #36 & #65 shall be removed from the SEQUENCE OF CONSTRUCTION notes on sheet CG-501 and revised as follows per PDF attachment to this RFI response.4
00712/17/15After today's site visit there was much confusion as to which buildings were being demolished. We were escorted to Bldg #64 (Medical Facility) but were unable to access building. Please confirm which buildings are to be demolished.12/18/2015 (jacobs)12/21/1512/21/15Please reference sheets C-101 through C-103 (and Additive Bid Items per Spec Section 01 23 00) for buildings to be demolished under this MED/GIB project. All references to Building #64 shall be removed from the SEQUENCE OF CONSTRUCTION notes on sheet CG-501 and revised as follows per PDF attachment to this RFI response.4
00812/17/15We would also like to request an additional site visit to access buildings for bidding purposes.12/18/2015 (nr)12/23/15THURSDAY, JANUARY 7, 2016 at 10:00. Contractors meet in dining hall, Bldg 11 at the NGTC, Sea Girt (same as pre-proposal conference site.)6
00912/17/15Please provide any hazardous / environmental reports if available, for bidding purposes.12/18/2015 (jacobs)(BY NJARNG)-42355
01012/21/15Drawing CU-101 indicates 8" sanitary for the new SMH 1 and 2 to the building. Drawing P-102 indicates 6". Which is correct?12/21/15 (jacobs)RESPONSE: The sanitary sewer line beyond the building footprint shall be an eight (8)-inch PVC pipe, as shown on sheet CU-101. Provide appropriate fitting to transition between a six (6)-inch and eight (8)-inch diameter piping.-42359
01112/21/15The schedule on Drawing P-60 I indicates EEW-1 eyewash/counter. Where are these to be located?12/21/15 (jacobs)RESPONSE: EEW-1 is located in Medical Exam Room M-102 as shown on Sheet P-101.-42359
01212/21/15Drawing P-601 also indicates TWV-2 emergency equipment. This item is not shown on the drawings nor the tempered water piping for same. Please advise.12/21/15 (jacobs)RESPONSE: TWV-2 shall be provided with EEW-1 located in Medical Exam Room M-102.-42359
01312/21/15Note 1 on Drawing P-102 indicates the requirement for trap primer from the sink to the floor drains. On the schedule on Drawing P-601 the ETP-1 is advised as "not used". Can we assume that each of the P-8 will have trap primer TP-1 to each floor drain? What about the men's and women's bathrooms? Do they also get TP-1 trap primers?12/21/15 (jacobs)RESPONSE: Contractor shall use TP-1 on medical exam room floor drains and restroom floor drains.-42359
01412/21/15Specification Section 22 11 13 paragraph 1lB states Utility furnished products including water meters shall be furnished to the site, etc. We assume the Utility Company will provide meters, who is the Utility Company?12/21/15 (jacobs)RESPONSE: Paragraph 1.1.B of specification 22 11 13 Facility Water Distribution Piping shall be deleted. The local utility company will not provide a water meter for this project. Contractor shall still be required to provide metering with the building in accordance with paragraph 2.14 of specification 22 11 19 Domestic Water Piping Specialties.-42359
01512/21/15Specification Section 22 11 13 paragraph 3.4F states install piping by tunneling or jacking etc. under streets or obstructions that cannot be disturbed. Are there any streets that cannot be disturbed and require jacking?12/21/15 (jacobs)RESPONSE: Installation of water line can be accomplished with open trench construction. Tunneling or jacking under streets or other obstruction will not be required for installation of the water lines.-42359
01612/21/15Drawing CG-102 Key Note 1 outfall at existing bulkhead see notes 3 & 4. Note 3 says provide tidal flap gate at new 36" outfall through bulkhead, the RCP is 24"? Drawing CUP203 shows STMH #1 goes to outfall and nothing at end of pipe? Drawing C-503 detail C-3 BMP outlet structure, where does that go?12/21/15 (jacobs)RESPONSE: Storm sewer shall outfall through existing bulkhead wall into Stockton Lake, as shown on drawing CG-102. Diameter of outfall pipe into Stockton Lake is 24 inches in diameter. Revise opening through existing bulkhead wall to 40-inches in diameter. Delete detail C3 on sheet C-503 as it is not required for this facility.-42359
01721-Dec-15We understand that this is a negotiated bid, and the documents state there is no bid bond required. Please confirm that no bid bond is required.12/21/1512/21/1512/21/15See SF1442 Block 13 B.0
01821-Dec-15The scope of work in Options 0001, 0002, 0007 and 000 are shown for Building # 41, # 55 and # 59. There is No mention about Building # 64 Existing Medical Building. Is this building part of Options. Please clarify.12/21/15RESPONSE: Reference sheets C-101 through C-103 (and Additive Bid Items per Spec Section 01 23 00) for buildings to be demolished under this MED/GIB project. All references to Building #64 & #64T are not part of this project. The SEQUENCE OF CONSTRUCTION notes shown on sheet CG-501 shall be removed and revised per PDF attachment to RFI response 0007.-42359
01921-Dec-15Provide Plan showing the location of Building # 41 and # 55. The Existing Conditions plan does not show the location of these two building.12/21/15RESPONSE: Reference sheets C-101 through C-103 (which indicate Bldgs. #41 and #55) for buildings to be demolished under this MED/GIB project.-42359
02021-Dec-15Provide details for each building, the utility disconnects/re-routing, rodent baiting and basically all items required to obtain demolition permit.21-Dec-15RESPONSE: All demolition scope information is provided within Contract Documents (Drawings, Specifications, etc). GC shall be responsible for obtaining all required permits associated with GC required demolition efforts as indicated in Contract Documents.-42359
02121-Dec-15Provide details for each building, the Removal of all hazardous and contaminated materials, USTs, septic tanks, ASTs, transformers, draining of all hydraulic fluids and oils.12/21/15RESPONSE: All demolition scope information is provided within Contract Documents (Drawings, Specifications, etc). GC shall be responsible for verifying all existing conditions associated with GC required demolition efforts as indicated in Contract Documents.-42359
02221-Dec-15Provide survey Report if any for each building. We assume no Asbestos.12/21/15RESPONSE: All demolition scope information is provided within Contract Documents (Drawings, Specifications, etc). GC shall be responsible for verifying all existing conditions associated with GC required demolition efforts as indicated in Contract Documents.-42359
02321-Dec-15On finish schedule for wall tile they list CWT and PT 6 – how high should the ceramic wainscot be.12/21/15RESPONSE: CWT height shall be 6'-2", typical. Refer to PDF attachment to this RFI response.-42359
02421-Dec-15Also on finish schedule they call for a 3 color wall pattern but there are no elevation drawings showing the pattern – can the architect supply a sketch of the pattern if its typical.12/21/2015RESPONSE: Refer to PDF attachment to this RFI response for typical CWT layout pattern.-42359
02522-Dec-15Please provide more information on option 0001 AND 0007 for utility demo. Please provide sizes and material of existing utilities.Also please elaborate on government intentions for demolition of utilities at the beginning of the project as opposed, to the end of the project. Please clarify as this is a deduct, it is our assumption that demolition of utilities will be done at the end of project and included in the base bid.23-Dec-15-42360
0260
0270
0280
0290
0300
0310
0320
0330
0340
0350
0360
0370
0380
0390
0400
0410
0420
0430
0440
0450
0460
0470
0480
0490
0500
0510
0520
0530
0540
0550
0560
0570
0580
0590
0600
0610
0620
0630
0640
0650
0660
0670
0680
0690
0700
0710
0720
0730
0740
0750
0760
0770
0780
0790
0800
0810
0820
0830
0840
0850
0860
0870
0880
0890
0900
0910
0920
0930
0940
0950
096
0970
0980
0990
1000
1010
1020
1030
1040
1050
1060
1070
1080
1090
1100
1110
1120
1130
1140
1150
1160
1170
1180
1190
1200
1210
1220
1230
1240
1250
1260
1270
1280
1290
1300
1310
1320
1330
1340
1350
1360
1370
1380
1390
1400
1410
1420
1430
1440
1450
1460
147
1480
150
151
152
1530
1540
1510
1520
1530
1540
1550
1560
1570
1580
1590
1600
1610
1620
1630
1640
1650
1660
1670
1680
1690
1700
1710
1720
1730
1740
1750
1760
1770
1780
1790
1800
1810
1820
1830
1840
1850
1860
1870
1880
1890
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
2020
2030
2040
2050
2060
2070
2080
2090
2100
2110
2120
2130
2140
2150
2160
2170
2180
2190
2200
2210
2220
2230
2240
2250
2260
2270
2280
2290
2300
2310
2320
2330
2340
2350
2360
2370
2380
2390
2400
2410
2420
2430
2440
2450
2460
2470
2480
2490
2500
2510
2520
2530
2540
2550
2560
2570
2580
2590
2600
2610
2620
2630
2640
2650
2660
2670
2680
2690
2700
2710
2720
2730
2740
2750
2760
2770
2780
2790
2800
2810
2820
2830
2840
2850
2860
2870
2880
2890
2900
2910
2920
2930
2940
2950
2960
2970
2980
2990
3000
3010
3020
3030
3040
3050
3060
3070
3080
3090
3100
3110
3120
3130
3140
3150
3160
3170
3180
3190
3200
3210
3220
3230
3240
3250
3260
3270
3280
3290
3300
3310
3320
3330
3340
3350
3360
3370
3380
3390
3400
3410
3420
3430
3440
3450
3460
3470
3480
3490
3500
3510
3520
3530
3540
3550
3560
3570
3580
3590
3600
3610
3620
3630
3640
3650
3660
3670
3680
3690
3700
3710
3720
3730
3740
3750
3760
3770
3780
3790
3800
3810
3820
3830
3840
3850
3860
3870
3880
3890
3900
3910
3920
3930
3940
3950
3960
3970
3980
3990
4000
4010
4020
4030
4040
4050
4060
4070
4080
4090
4100
4110
4120
4130
4140
4150
4160
4170
4180
4190
4200
4210
4220
4230
4240
4250
4260
4270
4280
4290
4300
4310
4320
4330
4340
4350
4360
4370
4380
4390
4400
4410
4420
4430
4440
4450
4460
4470
4480
4490
4500
4510
4520
4530
4540
4550
4560
4570
4580
4590
4600
4610
4620
4630
4640
4650
4660
4670
4680
4690
4700
4710
4720
4730
4740
4750
4760
4770
4780
4790
4800
4810
4820
4830
4840
4850
4860
4870
4880
4890
4900
4910
4920
4930
4940
4950
4960
4970
4980
4990
5000
5010
5020
5030

&C&"Arial,Bold"&12RFI Log&"Arial,Regular"

&10MED/GIB

&RPage &P

File details come from the government source that posted it. Updated .