181109_-_Mechanical_B3_Set.pdf
PDF 1 MB Posted
- Attached to
- Corrosion Control Equipment Federal contract opportunity
- Solicitation number
- W912JV-19-Q-7011
About this file
Mechanical Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Orientation.pdf | ||
| Q&A__2.docx | DOCX document | |
| SOW_Corrosion_Control_Equipment_2019_rev4.docx | DOCX document | |
| Kingsley_B3_Architectural_2_of_2.pdf | ||
| 181109_-_Electrical_B3_Set.pdf | ||
| Kingsley_B3_Plumbing_-_Stamped.pdf | ||
| SOW_Corrosion_Control_Equipment_2019_rev4.docx | DOCX document | |
| Kingsley_B3_Architectural_1_of_2.pdf | ||
| Questions_and_answers.docx | DOCX document | |
| SOW_Corrosion_Control_Equipment_2019_rev3.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FS
LS
PS
TS
PG
PA
PITCH
AV
MV
S
CO
CO2
NO2
RS
SP
H
TS
T
T
S
PIPE TURNED TOWARD
PIPE TURNED AWAY
PIPE TURNED AWAY
FLEXIBLE CONNECTOR
UNION
FLANGES
REDUCER (CONCENTRIC)
REDUCER (ECCENTRIC)
PIPE CAP/CLEAN OUT
FLUID FLOW DIRECTION
PIPE GUIDE
PIPE ANCHOR
PIPE PITCH DIRECTION
NEW CONNECTION TO EXISTING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW TO BE INSTALLED
AUTOMATIC CONTROL VALVE (2-WAY)
AUTOMATIC CONTROL VALVE (3-WAY)
BACKFLOW PREVENTION VALVE
THROTTLING VALVE
BALANCING VALVE
FLOW MEASUREMENT STATION
RELIEF VALVE
AIR VENT (AUTO)
AIR VENT (MANUAL)
VACUUM BREAKER
PRESSURE GAUGE
TEMPERATURE GAUGE
WATER HAMMER ARRESTOR
ISOLATION/SHUT-OFF/MANUAL VALVE
GLOBE VALVE
BUTTERFLY VALVE
GATE VALVE
GLOBE ANGLE VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
PRESSURE REGULATING VALVE
SOLENOID VALVE ONE-WAY (ELECTRIC)
STRAINER
PIPE TURNED TOWARD
GAUGE CONNECTION
PIPE PLUG
BALL VALVE
FLOW SENSOR
LEVEL SENSOR
PRESSURE SENSOR
TEMPERATURE SENSOR
FILTER
CHECK VALVE
PIPING SYMBOLS
EQUIPMENT DRAIN VALVE
STRAINER WITH BLOW OFF VALVE
AND NIPPLE
SRV
MPCR
MPS
LPCR
LPS
HPCR
HPS
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
LIQUID PETROLEUM
LOW PRESSURE STEAM
LP
LOW PRESSURE CONDENSATE RETURN
REFRIGERANT SUCTION
MEDIUM PRESSURE CONDENSATE RETURN
STEAM RELIEF VENT
REFRIGERANT LIQUID
PUMPED CONDENSATE RETURN
NATURAL GAS
VACUUMVAC
RS
RL
G
PCR
GLYCOL WATER RETURN
GLYCOL WATER SUPPLY
HIGH PRESSURE CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
ICE WATER RETURN
ICE WATER SUPPLY
HOT WATER SUPPLY
HOT WATER RETURN
COOLING TOWER WATER SUPPLY
CONDENSATE DRAIN
COOLING TOWER WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HWS
IWS
HWR
IWR
GWR
GWS
CD
CWR
CWS
CTS
CHWS
CTR
CHWR
MECHANICAL PIPING:
CHEMICAL FEED
BOILER BOTTOM BLOW DOWN
BOILER SURFACE BLOW DOWN
COMPRESSED AIR
BOILER FEED WATER
CF
BBD
BSD
BFW
A
REFRIGERANT HOT GASRHG
(FIRST FIGURE IS SIDE SHOWN)
TEMPERATURE SENSOR
RECTANGLE DUCT SIZE
SUPPLY DUCT TURNED TOWARD
FIRE DAMPER WITH ACCESS
DOOR
VOLUME DAMPER
CARBON MONOXIDE (CO) SENSOR
STATIC PRESSURE SENSOR
HUMIDISTAT
NITROGEN DIOXIDE (NO2) SENSOR
SMOKE DETECTOR
DUCT (FLEXIBLE ROUND)
ROOM SENSOR
TRANSITION (SQUARE-TO-ROUND)
MOTOR OPERATED DAMPER
AIR OUTLET/INLET TYPE
ROUND DUCT (RIGID)
EXHAUST
BACKDRAFT DAMPER
FLEXIBLE CONNECTION
(CFM)
TURNING VANES
SUPPLY DUCT TURNED AWAY
AD
MOD
FD
BDD
12x12
SUPPLY OR OUTDOOR AIR
DOOR GRILLE
AIRFLOW (SUPPLY/OUTSIDE AIR)
HVAC SYMBOLS:
RETURN OR TRANSFER
AIRFLOW (RETURN/EXHAUST)
DG
A
CARBON DIOXIDE (CO2) SENSOR
THERMOSTAT
INSULATED BASE THERMOSTAT
3/4" DOOR UNDERCUT
DCO
12ø
12/12ø OVAL DUCT
SWITCH
CEILING MOUNTED ACCESS PANELAP
S/I SNOW/ICE SENSOR
SC FAN SPEED CONTROLLER
FD
FIRE DAMPER IN VERTICAL
DUCT
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :0
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-001
NOTES, SYMBOLS
AND ABBREVIATIONS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
DEMO DEMOLISH IN INCH RA RETURN AIR
DDH DESICCANT DEHUMIDIFIER IH INTAKE HOOD PVC POLYVINYL CHLORIDE
DDC DIRECT DIGITAL CONTROL IE INVERT ELEVATION PTHP PACKAGED TERMINAL HEAT PUMP
DCVA DOUBLE CHECK VALVE ASSEMBLY BPD ID INSIDE DIAMETER PTAC PACKAGED TERMINAL AIR CONDITIONER
DBA DECIBELS, BAND A HZ HERTZ PSIG PSI GAGE
DAC DOOR AIR CURTAIN HX HEAT EXCHANGER PSID PSI DIFFERENTIAL
CUH CABINET UNIT HEATER HUM HUMIDIFIER PSIA PSI ABSOLUTE
CU COPPER HR HOSE REEL PSI POUNDS PER SQUARE INCH
CTW CLOSE TO WALL HP HORSEPOWER PRV PRESSURE REDUCING VALVE
CTCLM CLOSE TO COLUMN HP HEAT PUMP PROP PROPELLER WF WATER FILTER
CTCLG CLOSE TO CEILING HE FLUID HEAT EXCHANGER PPH POUND PER HOUR W WATTS OR WIDTH CT COOLING TOWER HDB HYDROSTATIC DESIGN BASIS PH PHASE VRF VARIABLE REFRIGERANT FLOW
CRP CONDENSATE RETURN PUMP HC HEATING COIL PG PROPYLENE GLYCOL VLV VALVE
CRAC COMPUTER ROOM AIR CONDITIONING UNIT H HEIGHT PD PRESSURE DROP/DIFFERENTIAL VFD VARIABLE FREQUENCY DRIVE COR CONTRACTING OFFICER'S REPRESENTATIVE GS GALVANIZED STEEL P HYDRONIC PUMP VER VEHICLE EXHAUST REEL
COMP COMPRESSOR GPM GALLONS PER MINUTE P PRESSURE VA VENT AIR
CI CAST IRON GAL GALLON OFOI OWNER FURNISHED, OWNER INSTALLED V VOLTS
CH CHILLER FTWC FEET WATER COLUMN PRESSURE OED OPEN ENDED DUCT UV ULTRAVIOLET
CFM CUBIC FEET PER MINUTE FTC FINNED TUBE CONVECTOR OD OUTSIDE DIAMETER UNO UNLESS NOTED OTHERWISE
CD CEILING DIFFUSER FT FLASH TANK OA OUTSIDE AIR UH UNIT HEATER
CC COOLING COIL FT FEET NPSHR NPSH REQUIRED UGD UNDERGROUND
CAF COMPRESSED AIR FILTER FPM FEET PER MINUTE NPSHA NPSH AVAILABLE UFC UNIFIED FACILITIES CRITERIA
CA COMBUSTION AIR FM FLOW METER NPSH NET POSITIVE SUCTION HEAD TYP TYPICAL
C CONVECTOR FLA FULL LOAD AMPS NOM NOMINAL TONR TONS COOLING
BZ BRONZE FE FUME EXTRACTOR NO NORMALLY OPEN TH THREADED
BW BUTTWELD FD FIRE DAMPER NIC NOT IN CONTRACT TG TRANSFER GRILLE
BTU BRITISH THERMAL UNIT FCU FAN COIL UNIT NH NO-HUB TEMP TEMPERATURE
BSB BRANCH SELECTOR BOX FC FLUID COOLER NG NATURAL GAS TDS TOTAL DISSOLVED SOLIDS BS BLACK (MILD) STEEL FAF FORCED AIR FURNACE NFPA NATIONAL FIRE PROTECTION ASSOCIATION TDH TOTAL DEVELOPED HEAD
BRZ BRONZE F AIR FILTER NC NORMALLY CLOSED TCP TEMPERATURE CONTROL PANEL
BRS BRASS °F FAHRENHEIT NA NOT APPLICABLE TA TRANSFER AIR
BPD BACKFLOW PREVENTION DEVICE EWT ENTERING WATER TEMPERATURE MTL MATERIAL SW SOCKET WELD BI BACKWARD INCLINED ETR EXISTING TO REMAIN MSS MANUFACTURERS STANDARDIZATION SOCIETY SV SOLVENT WELD BHP BRAKE HORSEPOWER ET EXPANSION TANK MOD MOTOR OPERATED CONTROL DAMPER STL STEEL BDD BACKDRAFT DAMPER EOM END OF MAIN MOCP MINIMUM OVER CURRENT PROTECTION STD STANDARD
BC BOOSTER COIL ELEC ELECTRIC MMBH MILLION BTU PER HOUR ST STEAM TRAP
B BOILER EL ELEVATION MIN MINIMUM SS STAINLESS STEEL
AT AIR TERMINAL EJ EXPANSION JOINT MFR MANUFACTURER SRV SAFETY RELIEF VALVE
AS AIR SEPARATOR EHC ELECTRIC HEATING COIL MCC MOTOR CONTROL CENTER SR SUPPLY REGISTER
APPROX APPROXIMATELY EG EXHAUST GRILLE MCA MINIMUM CIRCUIT AMPACITY SQ SQUARE
AP ACCESS PANEL EG ETHYLENE GLYCOL MC MECHANICAL COUPLING SPEC SPECIFICATIONS
ANG AIR NATIONAL GUARD EFT ENTERING FLUID TEMPERATURE MBH THOUSAND BTU PER HOUR SP STATIC PRESSURE
AL ALUMINUM EFF EFFICIENCY MAWP MAXIMUM ALLOWABLE WORKING PRESSURE SMLS SEAMLESS
AHU AIR HANDLING UNIT EF EXHAUST FAN MAU MAKE-UP AIR UNIT SG SUPPLY GRILLE
AHJ AUTHORITY HAVING JURISDICTION EDH ELECTRIC DUCT HEATER MADP MAXIMUM ALLOWABLE DIFFERENTIAL PRESSURE SF STEAM FILTER AHE AIR-TO-AIR HEAT EXCHANGER EBH ELECTRIC BASEBOARD HEATER LWT LEAVING WATER TEMPERATURE SD SOLDER AFMS AIR FLOW MEASURING STATION EAT ENTERING AIR TEMPERATURE LPG LIQUIFIED PETROLEUM GAS SD SLOT DIFFUSER AFF ABOVE FINISHED FLOOR EA EXHAUST AIR LFT LEAVING FLUID TEMPERATURE SCH SCHEDULE
AF AIR FOIL E EXISTING LD LINEAR DIFFUSER SCFM STANDARD CFM
AD COMPRESSED AIR DRYER DWG DRAWING LB POUNDS SAD SOUND ATTENUATING DEVICE
AD ACCESS DOOR DN DOWN LAT LEAVING AIR TEMPERATURE SA SUPPLY AIR
ACV AUTOMATIC CONTROL VALVE DISCH DISCHARGE L LOUVER RTU ROOF TOP UNIT
ACU AIR CONDITIONING UNIT DIM DIMENSION L LENGTH RTD RESISTIVE THERMAL DEVICE
ACCU AIR COOLED CONDENSING UNIT DIA DIAMETER KH KITCHEN HOOD RPM REVOLUTIONS PER MINUTE
ACC AIR COOLED CONDENSER DH DEHUMIDIFIER IR INFRARED HEATER RH RELIEF HOOD
AC AIR COMPRESSOR DFD DIVISION OF FACILITIES DEVELOPMENT INWC INCHES WATER COLUMN PRESSURE RG RETURN GRILLE A AMPS DFD DEPARTMENT OF DEFENSE INHG INCHES MERCURY PRESSURE RCP RADIANT CEILING PANEL
ABBREVIATIONS
12. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES ON ALL EQUIPMENT.
11. COORDINATE POWER REQUIREMENTS FOR ALL POWER TO MECHANICAL EQUIPMENT INCLUDING CONTROL SYSTEM WITH ELECTRICAL CONTRACTOR AND INSURE ALL COSTS ASSOCIATED WITH SUCH ARE INCLUDED IN THE PROJECT BID COST. PROVIDE ELECTRICAL POWER, TRANFORMERS, RELAYS, ETC. AS NECESSARY
TO ALL HVAC AND MECHANICAL CONTROLS.
10. MAINTAIN 3'-0" CLEAR HORIZONTALLY IN FRONT OF ALL ELECTRICAL EQUIPMENT.
9. SEQUENCE OF WORK AND/OR PLACE OF COMMENCEMENT OF WORK SHALL BE APPROVED PRIOR TO WORK BEING STARTED. SCHEDULED SHUTDOWNS SHALL BE CLOSELY COORDINATED WITH EXISTING OPERATIONS.
8. VERIFY ALL EQUIPMENT LOCATIONS AND PIPE AND DUCT ROUTING WITH OWNER PRIOR TO INSTALLATION.
7. TEMPORARILY PATCH ALL ROOF OPENINGS WATERTIGHT UNTIL FINAL CLOSURE CAN BE MADE.
6. ALL NEW AND EXISTING ROOFING SYSTEMS SHALL BE PROTECTED FROM DAMAGE DURING CONSTRUCTION
ACTIVITIES.
5. ACCURATE AND LEGIBLE AS-BUILT DRAWING MARKUPS SHALL BE MAINTAINED AT THE JOB SITE, AND BE
SUBMITTED PRIOR TO FINAL PAYMENT FOR THE CREATION OF FINAL RECORD DRAWINGS.
4. ANY AND ALL INFORMATION SHOWN ON THESE DRAWINGS WITH RESPECT TO EXISTING STRUCTURES, UTILITIES, AND MECHANICAL SYSTEMS, IS AS EXACT AS COULD BE SECURED. THE INFORMATION IS NOT
WARRANTED NOR GUARANTEED ACCURATE, FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
PROCEEDING WITH WORK.
3. ELEVATION OF PIPING AND DUCTWORK INDICATED ON THESE DRAWINGS ARE TO BE USED AS GUIDELINES TO ASSIST WITH INSTALLATIONS. MINOR CHANGES TO THESE ELEVATIONS MAY BE NECESSARY TO ELIMINATE UNFORESEEN INTERFERENCES. ANY CHANGE IN ELEVATION SHALL BE APPROVED PRIOR TO
CHANGE.
2. THESE DRAWINGS ARE DESIGN DRAWINGS AND ARE DIAGRAMMATIC, THEY MAY NOT SHOW ALL PHYSICAL ARRANGEMENTS, OFFSETS, BENDS, OR ELBOWS WHICH MAY BE REQUIRED FOR PROPER INSTALLATION OF VARIOUS MATERIALS, EQUIPMENT, PIPING AND DUCTWORK SYSTEMS IN ALLOTTED SPACES. EXAMINE THESE AND OTHER AVAILABLE DRAWINGS TO DETERMINE SPACE LIMITATIONS AND INTERFERENCES. MAKE ANY MINOR CHANGES IN LOCATIONS OF EQUIPMENT, PIPING, AND DUCTWORK FROM THAT SHOWN ON DRAWINGS AND FOR ALL PHYSICAL DETAILS REQUIRED FOR INSTALLATION. COST FOR ADAPTING WORK TO JOB SITE
CONDITIONS SHALL NOT BE CONSIDERED AS BASIS OF AN EXTRA COST TO CONTRACT.
1. ABBREVIATIONS AND SYMBOLS INDICATED HERE AND NOT USED IN THE CONTRACT DOCUMENTS DO NOT APPLY TO THIS PROJECT. ADDITIONAL ABBREVIATIONS MAY BE INDICATED IN THE CONTRACT DOCUMENTS.
GENERAL NOTES:
11/09/18 B-3 FINAL
UP
T
T
T
T
T
T
T
T
TS
T
T
T
TRAINING
/ BREAK
ROOM
X-RAY
VAULT
ROOM
BEAD
BOOTH
ROOM
PAINT
MIXING
ROOM /
HAZ-MAT
STOR
FILM
PROC
ROOM
X-RAY CR
FILM
VIEWING
ROOM
INSPECTION
BAY
103-1
EQUIPMENT
ROOM
JAN
OFFICE
OFFICE
HALLWAY
VEST.
WOMEN'S
AIR LOCK
FIRE
PROTECTION
ROOM
PAINT
BOOTH-1
125-1
PPE
CLEAN
ROOM/
CIRCULAT.
MEN'S
LAUNDRY
ROOM
WOMEN'S
LOCKER
ROOM
MEN'S
LOCKER
ROOM
VEST.
STENCIL
ROOM
OIL
ANALYSIS
ROOM
HANGAR
EF-1
20x20 EA
20x20 SA x1 x1
14x1214x12
16x1216x12
CD-1CD-1CD-1
CD-2CD-2CD-2
CD-2CD-2CD-2
14x1014x1012x812x8 18x1218x12
AT-6
x1 x1
CD-3CD-3CD-3
CD-3CD-3CD-3
CD-3CD-3CD-3
CD-1CD-1CD-1
RG-1RG-1RG-1
CD-2CD-2CD-2
CD-2CD-2CD-2
RG-1RG-1RG-1
CD-1CD-1CD-1
RG-1RG-1RG-1
CD-2CD-2CD-290
RG-1RG-1RG-1
CD-3CD-3CD-3 AT-4
RG-1RG-1RG-1
RG-1RG-1RG-1
CD-1CD-1CD-1
CD-1CD-1CD-1
RG-1RG-1RG-1
CD-1CD-1CD-1
AT-3
x1 x1
14x1014x10 x1 x1 ø ø
AT-5
10x1010x10
IR-2
IR-4IR-3
IR-1
SG-2SG-2SG-2
EG-3EG-3EG-3
AC-2
7.102 7.103
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
G
H
K
7.108
7.107
7.106
7.104
RG-1RG-1RG-1
RG-1RG-1RG-1
EG-2EG-2EG-2
EG-1EG-1EG-1
EG-2EG-2EG-2
EG-1EG-1EG-1
EG-2EG-2EG-2
7.100
12x1212x12 x6 x6
8x68x6
6x66x6
8x68x6
6x66x6 ø ø
CD-1CD-1CD-1
x1 x1
18x818x8
CD-1CD-1CD-1
RG-6RG-6RG-6
RG-6RG-6RG-6
8ø8ø
6ø6ø x2 x2
10x1010x10 x8
R A x2 x2 x1 R
A
18x2418x2418x2418x24
8x88x8
AT-7
20x20 SA DUCT TO
MECHANICAL MEZZANINE
16x14 RA DUCT UP
TO MECHANICAL
MEZZANINE
RG-7RG-7RG-7
RG-7RG-7RG-7
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
AT-2
x1 x1
AT-1
8x88x8
6ø6ø
6ø6ø
6ø6ø x2 x2
UP
12x18 EA
UP
EG-1EG-1EG-1
6x66x6
8x68x6
18x16 SA DUCT
TO MECHANICAL
MEZZANINE
DF-1 DF-2 DF-3
DF-4 DF-5 DF-6
M-401
M-401
42x18 RA DUCT
TO EQUIPMENT
ROOM 201
RG-5RG-5RG-5
SG-1SG-1SG-1
7.116
6x66x6
AT-8
18x14 EA UP THRU
FLOOR TO EF-4
L-2L-2L-2
D-11
36x24 OED
WITH WIRE
MESH SCREEN
10ø10ø
SG-2SG-2SG-2
SG-2SG-2SG-2
SG-2SG-2SG-2
EG-3EG-3EG-3
EG-3EG-3EG-3
EG-3EG-3EG-3
7.122
7.122
7.119
7.119
7.119
EF-3
7.124
7.125
7.127
7.128
7.128 ø ø8 ø ø ø ø
12ø12ø 12ø12ø
12ø12ø 12ø12ø
12ø12ø12ø12ø
6x66x6
6x66x6
8x88x8
8x88x8
8ø8ø ø ø1 ø ø
8ø8ø 8ø8ø x1 x1 x6 x6 x2 x2 x2 S
A ø ø ø ø ø ø ø ø
10x810x8 x6 x6
10ø10ø
10ø10ø
10ø10ø
10ø10ø
12x1212x12 x1 x1
10ø10ø
10ø10ø
7.1247.124
7.124
IR-3 & IR-4
IR-1 & IR-2
7.126
7.126
7.130
7.130 x1 x1
24x1824x18
30x1830x18
DCO
7.131
20x36 SA DUCT UP
TO FLOOR ABOVE
7.132425
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-4CD-4CD-4
OPEN ENDED
FAN INLET WITH
WIRE MESH
SCREEN
TG-2TG-2TG-2TG-2TG-2TG-2 TG-2TG-2TG-2
TG-2TG-2TG-2
18x14 OED
WITH WIRE
MESH SCREEN
D-12
SC
CONTROLS FOR DF FANS
8x8 EA
TG-2TG-2TG-2 TG-2TG-2TG-2
$ 7.120
CD-1CD-1CD-1
x1 x1
6ø6ø
CU-2
CU-1
HP-3
HP-1
CUH-2
CUH-1
7.116
HP-2
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :0
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-101
FIRST FLOOR HVAC
PLAN
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
KEYED NOTES
7.100 4" DIA. DRYER VENT FROM BELOW THROUGH ROOF. TERMINATE WITH VENT
CAP.
7.102 OFOI BLAST BOOTH WITH DEDICATED VENTILATION SYSTEM.
7.103 OFOI PAINT BOOTH WITH DEDICATED VENTILATION SYSTEM.
7.104 4" DIA. EXHAUST DUCTS FROM OIL SAMPLING MACHINE UP THROUGH ROOF.
TERMINATE WITH VENT CAP.
7.106 EF-1 MOUNTED OUTSIDE BUILDING ON CONCRETE PAD. PAD LENGTH AND
WIDTH SHALL EXCEED EQUIPMENT SIZE BY 4" ALL AROUND. REFER TO
STRUCTURAL DRAWINGS.
7.107 RUN 20x20 SA DUCT AT 20 FT. AFF. RUN 16x16 SA BRANCH DUCTS DOWN
WITH SUPPLY GRILLES AT 8FT. AFF DISCHARGING DOWNWARD.
7.108 RUN 20x20 EA DUCT AT 20 FT. AFF. RUN 16x16 EA BRANCH DUCTS DOWN
WITH EXHAUST GRILLES AT 8 FT. AFF.
7.116 PROVIDE LEAD SHIELDING AS SHOWN ON DETAIL 9, SHEET M-502.
7.119 PROVIDE CABLE-OPERATED BALANCING DAMPER. MOUNT ALL CABLE
OPERATORS AT CEILING ACCESS PANEL.
7.120 REMOTE VENTILATION KILL SWITCH LOCATION.
7.122 SUPPORT DUCTWORK IN HANGAR FROM CEILING, COLUMNS, OR GIRTS. DO
NOT ATTACH DUCTWORK SUPPORTS TO LEAD-LINED WALL.
7.124 4" DIAMETER RADIANT HEATER VENT UP THROUGH ROOF. TERMINATE WITH
ROOF CAP.
7.125 10x10 HAZMAT ROOM EXHAUST UP THROUGH ROOF TO GOOSENECK.
7.126 MOUNT TEMPERATURE SENSOR, CONDUIT, AND CONTROL WIRING ON
COLUMN. DO NOT PENETRATE LEAD-LINED WALL WITH ANY SUPPORTS OR
FASTENERS.
7.127 INSTALL TEMPERATURE SENSOR FOR AT-8 IN RETURN DUCT AS SHOWN.
7.128 REFER TO PLUMBING DRAWINGS FOR NATURAL GAS CONNECTION.
7.130 4" INDIVIDUAL COMBUSTION AIR INTAKE VENT AT EACH INFRARED HEATER
CONNECTING TO 6" COMMON UP THROUGH ROOF TERMINATING WITH RAIN
CAP. REFER TO DETAIL 8, M-502.
7.131 EXHAUST DUCTWORK FROM EACH INLET GRILLE TO ERU-1 SHALL BE OF
ALUMINUM CONSTRUCTION.
7.132 EXHAUST DUCTWORK FROM EACH INLET GRILLE TO 12x12 CONNECTION
SHALL BE OF ALUMINUM CONSTRUCTION.
7. THERMOSTATS SHALL BE MOUNTED AT A HEIGHT OF 46" AFF TO ENSURE
TOP AND BOTTOM OF THERMOSTAT FALLS ONTO CMU COURSE.
6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR
DIFFUSERS UNLESS NOTED OTHERWISE IN SPECIFICATIONS. FLEXIBLE
DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER AND SHALL NOT
EXCEED 5 FEET IN LENGTH.
5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS
NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.
3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND
BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK.
LOCATE BALANCE DAMPER AS CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.
2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY
LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT
SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.
1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET
SIZE UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS
GREATER THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT
SIZE LARGER (MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO
WITHIN 3 FEET OF BOX BEFORE REDUCING TO BOX INLET SIZE.
GENERAL HVAC NOTES:
1/8" = 1'-0"1
FIRST FLOOR HVAC PLAN
DN
T
T S
S
S
T
EQUIPMENT
ROOM
ELEC.-1
202-1
ELEC.-2
202-2
M-402
AHU-1
40x2640x26 x2
O A x8 O
A
AHU-2
MAU-1
L-1L-1L-1
4ø EA
UH-2
UH-1
AC-1AC-3
ERU-1
EF-2
7.112 x1 E
A
18x1818x18
7 8 9
G
K
16x1216x12 16x1216x12 x1 x1
7.111
7.113
7.100 x1 S
A
16x12 RA DUCT
TO FIRST FLOOR
20x20 SA DUCT
TO HANGER
18x18 MIN OA
8x8 EA
DN
HVAC CONTROL PANEL
7.1157.115 x1
M
IN
O
A
20x36 SA DUCT DOWN
TO FIRST FLOOR
M-402
12x18 EA DUCT DOWN
TO FIRST FLOOR
7.109 x2
S
A
42x18 RA DUCT DOWN
TO FIRST FLOOR
42x36 EA DUCT UP
TO ROOF
x1 E
A
EF-4
x1 x1
18x14 EA DOWN
TO FIRST FLOOR
7.117
D-1
D-2
18x16 SA DUCT
TO FIRST FLOOR
7.129
D-5 (TOP)
D-6 (MIDDLE)
D-7 (BOTTOM)
D-4
D-8
D-10D-9 x8 x8 x2
O A x1 E
A x1 x1
2000 CFM
7.115
1000 CFM1000 CFM
7.114
AD
FD
FD
FD
AD
FD AD
FD
AD
7.133
FD
ET-1GF-1
P-2
AS-1
CHEMICAL POT FEEDER
P-1
B-1
B-2
7.114
AD
UH-2
EF-2 UH-1
26x26 RA
AFMS-1
AFMS-2
AFMS-3
AFMS-4
D-3
AD
AD
x2
0 S A
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-102
EQUIPMENT ROOM
HVAC PLAN
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
KEYED NOTES
7.100 4" DIA. DRYER VENT FROM BELOW THROUGH ROOF. TERMINATE WITH VENT
CAP.
7.109 42x18 RA UP FROM FIRST FLOOR. 32x18 ECONOMIZER RELIEF UP THROUGH
ROOF TO GOOSENECK.
7.111 16x18 VENTILATION AIR INTAKE WITH MOTORIZED DAMPER FOR MECH
ROOM (BOTTOM OF 3 STACKED DUCTS).
7.112 18x18 ERU-1 EXHAUST UP THROUGH ROOF TO GOOSENECK.
7.113 20x18 MECH ROOM EXHAUST UP THROUGH ROOF TO GOOSENECK.
7.114 4" DIAMETER COMBUSTION AIR AND VENT UP THROUGH ROOF TO
GOOSENECK.
7.115 OPEN-ENDED DUCT WITH WIRE-MESH SCREEN.
7.117 18x14 FIRE PROTECTION ROOM EXHAUST UP THROUGH ROOF TO
GOOSNECK.
7.129 24" DEEP INTAKE PLENUM, SAME DIMENSION AS LOUVER. PARTITION
INTERIOR OF PLENUM AS SHOWN ON DETAIL 7, SHEET M-501.
7.133 ROUTE DUCT IN FIRE-RATED, LEAD-LINED SHAFT. REFER TO
ARCHITECTURAL DRAWINGS.
1/4" = 1'-0"1
EQUIPMENT ROOM HVAC PLAN
11/09/18 B-3 FINAL
7. THERMOSTATS SHALL BE MOUNTED AT A HEIGHT OF 46" AFF TO ENSURE
TOP AND BOTTOM OF THERMOSTAT FALLS ONTO CMU COURSE.
6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR
DIFFUSERS UNLESS NOTED OTHERWISE IN SPECIFICATIONS. FLEXIBLE
DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER AND SHALL NOT
EXCEED 5 FEET IN LENGTH.
5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS
NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.
3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND
BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK.
LOCATE BALANCE DAMPER AS CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.
2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY
LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT
SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.
1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET
SIZE UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS
GREATER THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT
SIZE LARGER (MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO
WITHIN 3 FEET OF BOX BEFORE REDUCING TO BOX INLET SIZE.
GENERAL HVAC NOTES:
K
G
E
D
B
3 4 5 6 7 8
4" LAUNDRY
EXHAUST
4" COMBUSTION AIR AND EXHAUST
18x18 EA GOOSENECK
18x20 EA GOOSENECK
42x36 EA GOOSENECK
14x18 EA GOOSENECK
7.123
7.1237.1237.123
10x10 EA GOOSENECK
7.104
7.1247.130
7.1307.124
7.124
7.124
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-103
ROOF HVAC PLAN
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
11/09/18 B-3 FINAL
1/8" = 1'-0"1
ROOF HVAC PLAN
7. THERMOSTATS SHALL BE MOUNTED AT A HEIGHT OF 46" AFF TO ENSURE
TOP AND BOTTOM OF THERMOSTAT FALLS ONTO CMU COURSE.
6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR
DIFFUSERS UNLESS NOTED OTHERWISE IN SPECIFICATIONS. FLEXIBLE
DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER AND SHALL NOT
EXCEED 5 FEET IN LENGTH.
5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS
NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.
3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND
BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK.
LOCATE BALANCE DAMPER AS CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.
2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY
LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT
SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.
1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET
SIZE UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS
GREATER THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT
SIZE LARGER (MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO
WITHIN 3 FEET OF BOX BEFORE REDUCING TO BOX INLET SIZE.
GENERAL HVAC NOTES:
KEYED NOTES
7.104 4" DIA. EXHAUST DUCTS FROM OIL SAMPLING MACHINE UP THROUGH ROOF.
TERMINATE WITH VENT CAP.
7.123 PAINT ALL GOOSENECK DUCT TERMINATIONS TO MATCH ROOF.
7.124 4" DIAMETER RADIANT HEATER VENT UP THROUGH ROOF. TERMINATE WITH
ROOF CAP.
7.130 4" INDIVIDUAL COMBUSTION AIR INTAKE VENT AT EACH INFRARED HEATER
CONNECTING TO 6" COMMON UP THROUGH ROOF TERMINATING WITH RAIN
CAP. REFER TO DETAIL 8, M-502.
UP
TS
TRAINING
/ BREAK
ROOM
X-RAY
VAULT
ROOM
BEAD
BOOTH
ROOM
PAINT
MIXING
ROOM /
HAZ-MAT
STOR
FILM
PROC
ROOM
X-RAY CR
FILM
VIEWING
ROOM
INSPECTION
BAY
103-1
EQUIPMENT
ROOM
JAN
OFFICE
OFFICE
HALLWAY
VEST.
WOMEN'S
AIR LOCK
FIRE
PROTECTION
ROOM
PAINT
BOOTH-1
125-1
PPE
CLEAN
ROOM/
CIRCULAT.
MEN'S
LAUNDRY
ROOM
WOMEN'S
LOCKER
ROOM
MEN'S
LOCKER
ROOM
VEST.
STENCIL
ROOM
OIL
ANALYSIS
ROOM
HANGAR
CU-1
CU-2
HP-1
HP-3
AC-2
HP-2
AT-3
AT-7
AT-4
AT-5
AT-6
1" HWS
1" HWR
/2
H W
R
/2
H
W S
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
G
H
K
8.100
CUH-1
CUH-2
HOT WATER PIPING
UP TO MECHANICAL
MEZZANINE
HOT WATER PIPING
UP TO MECHANICAL
MEZZANINE
REFRIGERANT PIPING
UP TO MECHANICAL
MEZZANINE
RZ-1 CONTROL PANEL AND P-3
S/I
AT-8
AT-2
AT-1
8.101
1" 1"
8.107
8.106
8.110
R L
R S
M-402
8.104
(TYP OF 4 PIPING SETS)
8.104
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-131
FIRST FLOOR PIPING
PLAN
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
KEYED NOTES
8.100 UNDERSLAB SNOW MELT SYSTEM WITH 1 LOOP, 3.3 GPM. AREA: 282 SF,
TUBE TYPE: 1" PEX, TUBE SPACING: 9" OC.
8.101 RACK REFRIGERANT PIPING VERTICALLY ALONG EXTERIOR WALL ABOVE
DOORWAY AND DOWN ALONG WALL TO UNITS. PIPING TO BE SIZED BY
RESPECTIVE EQUIPMENT MANUFACTURERS. PAINT JACKETING TO MATCH
ADJACENT SURFACE.
8.104 RL AND RS PIPING SIZES AS REQUIRED BY EACH CONDENSING UNIT / HEAT
PUMP MANUFACTURER. PAINT JACKETING TO MATCH ADJACENT SURFACE.
8.106 MOUNT UNIT ON CONCRETE PAD. PAD DIMENSIONS SHALL BE EQUAL TO
THE UNIT DIMENSIONS PLUS 4" ON ALL SIDES. REFER TO STRUCTURAL
DRAWINGS FOR CONSTRUCTION OF PAD.
8.107 INSTALL ZONE VALVE AND PUMP ON STRUT ASSEMBLY MOUNTED TO
FLOOR. DO NOT FASTEN TO LEAD-LINED WALL.
8.110 PROTECT HOT WATER AND REFRIGERANT PIPE PENETRATIONS OF
LEAD-LINED WALL IN ACCORDANCE WITH DETAIL 14, DRAWING M-511.
6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND
ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL
AIR VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS,
AND ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.
5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM
UP OR HORIZONTAL.
4. INSTALL PIPING FREE OF SAGS AND BENDS.
3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS
IS JOINED.
2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH
TAKE-OFFS UP TO ONE-HALF THE DIAMETER OF THE MAIN.
1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4" UNLESS NOTED
OTHERWISE.
GENERAL PIPING NOTES:
1/8" = 1'-0"1
FIRST FLOOR PIPING PLAN
DN
P
IT
C H
P
IT
C H
PITCH
PITCH
M-402
MAU-1
UH-2
2" HWS
2" HWR
1 1/2"
UH-1
AC-3 AC-1
AHU-1
AHU-2
7 8 9
G
K
3" HWS
HOT WATER PIPING
DOWN TO FIRST FLOOR
HOT WATER PIPING TO HANGER
DOOR SNOWMELT SYSTEM
REFRIGERATION PIPING
DOWN TO OUTDOOR UNITS
M-402
B-1
/4
C
D
8.104
8.104 8.104
8.103
/4
C
D
3" HW DECOUPLER
AS-1
ET-1
CHEMICAL POT FEEDER
GF-1
1" 1"
1 1/4" 1 1/4"
/2 "1
/2
1 1/2"
1 1/2"
H W
R
H W
S
H W
R
1 1/2"
8.108
3/4" CD
3"
3"
3"
8.109 8.109
8.109
3/4" CD
/4
H
W S
/4
H
W R
DP 8.102
3"
3"
3"
3"
B-2
P-1
P-2
H W
R 3
H W
S
8.111
1" 1" 8.113
EQUIPMENT
ROOM
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-132
EQUIPMENT ROOM
PIPING PLAN
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
1/4" = 1'-0"1
EQUIPMENT ROOM PIPING PLAN
11/09/18 B-3 FINAL
6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND
ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL
AIR VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS,
AND ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.
5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM
UP OR HORIZONTAL.
4. INSTALL PIPING FREE OF SAGS AND BENDS.
3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS
IS JOINED.
2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH
TAKE-OFFS UP TO ONE-HALF THE DIAMETER OF THE MAIN.
1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4" UNLESS NOTED
OTHERWISE.
GENERAL PIPING NOTES:
KEYED NOTES
8.102 LOCATION OF DIFFERENTIAL PRESSURE SENSOR.
8.103 BOILER EMERGENCY POWER-OFF SWITCH.
8.104 RL AND RS PIPING SIZES AS REQUIRED BY EACH CONDENSING UNIT / HEAT
PUMP MANUFACTURER. PAINT JACKETING TO MATCH ADJACENT SURFACE.
8.108 REFER TO PLUMBING DRAWINGS FOR NATURAL GAS PIPING CONNECTION.
8.109 RUN CONDENSATE DRAIN PIPE TO FLOOR DRAIN. REFER TO PLUMBING
DRAWINGS FOR LOCATION.
8.111 HOT WATER SYSTEM BYPASS VALVE FOR MINIMUM FLOW.
8.113 REFER TO DETAIL 5, M-511 FOR PIPING TO CHEMICAL POT FEEDER.
G E D B
IR-2 IR-4
DF-2
DF-5
1" HWR
1" HWS
x1 x1
20x20 EA
R S
R L
SG-2SG-2SG-2
x1 x1
EG-3EG-3EG-3
20x20 EA
TO EF-1
20x20 SA DUCT
TO MECHANICAL
MEZZANINE
20x20 SA 20x2020x20 x2 x2 ø
E A ø
E A
7.124 7.124
7.130 7.130
7.122
7.107
7.108
7.122
7.133
HANGAR
CD-4CD-4CD-4
CD-4CD-4CD-4
CD-1CD-1CD-1
RG-1RG-1RG-1
24x18 RA
6ø6ø ø ø x3 S
A
8ø8ø
AT-3
18x2418x24
RG-7RG-7RG-7
1" HWR
3/4" HWR
3/4" HWS
AT-2
ø ø
22x2222x22
12x1012x10
24x1824x18
18x2018x20
24x1824x18
12ø12ø
8x8 SA 8x88x8
1" HWS
8x88x8
INSPECTION
BAY
103-1
FILM
PROC
ROOM
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-401
ENLARGED PLANS
AND SECTIONS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
11/09/18 B-3 FINAL
1/4" = 1'-0"2
HANGER SECTION - LOOKING EAST
1/4" = 1'-0"1
INSPECTION BAY SECTION - LOOKING NORTH
7. THERMOSTATS SHALL BE MOUNTED AT A HEIGHT OF 46" AFF TO ENSURE
TOP AND BOTTOM OF THERMOSTAT FALLS ONTO CMU COURSE.
6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR
DIFFUSERS UNLESS NOTED OTHERWISE IN SPECIFICATIONS. FLEXIBLE
DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER AND SHALL NOT
EXCEED 5 FEET IN LENGTH.
5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS
NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.
3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND
BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK.
LOCATE BALANCE DAMPER AS CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.
2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY
LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT
SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.
1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET
SIZE UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS
GREATER THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT
SIZE LARGER (MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO
WITHIN 3 FEET OF BOX BEFORE REDUCING TO BOX INLET SIZE.
GENERAL HVAC NOTES:
6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND
ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL
AIR VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS,
AND ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.
5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM
UP OR HORIZONTAL.
4. INSTALL PIPING FREE OF SAGS AND BENDS.
3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS
IS JOINED.
2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH
TAKE-OFFS UP TO ONE-HALF THE DIAMETER OF THE MAIN.
1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4" UNLESS NOTED
OTHERWISE.
GENERAL PIPING NOTES:
KEYED NOTES
7.107 RUN 20x20 SA DUCT AT 20 FT. AFF. RUN 16x16 SA BRANCH DUCTS DOWN
WITH SUPPLY GRILLES AT 8FT. AFF DISCHARGING DOWNWARD.
7.108 RUN 20x20 EA DUCT AT 20 FT. AFF. RUN 16x16 EA BRANCH DUCTS DOWN
WITH EXHAUST GRILLES AT 8 FT. AFF.
7.122 SUPPORT DUCTWORK IN HANGAR FROM CEILING, COLUMNS, OR GIRTS. DO
NOT ATTACH DUCTWORK SUPPORTS TO LEAD-LINED WALL.
7.124 4" DIAMETER RADIANT HEATER VENT UP THROUGH ROOF. TERMINATE WITH
ROOF CAP.
7.130 4" INDIVIDUAL COMBUSTION AIR INTAKE VENT AT EACH INFRARED HEATER
CONNECTING TO 6" COMMON UP THROUGH ROOF TERMINATING WITH RAIN
CAP. REFER TO DETAIL 8, M-502.
7.133 ROUTE DUCT IN FIRE-RATED, LEAD-LINED SHAFT. REFER TO
ARCHITECTURAL DRAWINGS.
M-402
D-10
D-9
8x8 EA
ERU-1
AHU-2
AHU-1
26x40 OA x4 E
A
18x18 EA
12x16 RA x1 S
A
18x12 EA DUCT DOWN
TO FIRST FLOOR
14x16 RA DUCT DOWN
TO FIRST FLOOR
x M
IN
O
A
3/4" CD TO
FLOOR DRAIN
3/4" CD TO
FLOOR DRAIN
1 1/4"
R L
/4
C
D
1"
20x18 EA FOR
MECH ROOM
20x8 OA
R S
20x20 OA
TO MAU-1
18x1818x18
RS
RS
x1 x1 x1 x1
FDFD
AD
18x42 RA DUCT DOWN
TO FIRST FLOOR
AD
AFMS-2
EQUIPMENT
ROOM
KG
M-402
MAU-1 AHU-2 ERU-1
L-1L-1L-1
20x20 OA 26x40 OA
18x18 EA
16x18 SA
18x18 MIN OA
R L
R S
H W
S
H W
R
3/4" CD TO
FLOOR DRAIN
20x20 SA
UH-2
1 1/2"
3/4" CD TO
FLOOR DRAIN
2" HWR
/2
/2
2" HWS
D-1
16x12 RA x3 x3
18x16 SA
SG-3SG-3SG-3
D-5
D-7
8x20 OA x1 x1
7.129
FD
AFMS-4
EQUIPMENT
ROOM
8.101
REFRIGERANT PIPING
UP TO EQUIPMENT ROOM
HP-1 HP-3 CU-2 CU-1
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-402
ENLARGED PLANS
AND SECTIONS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
11/09/18 B-3 FINAL
1/4" = 1'-0"1
EQUIPMENT ROOM SECTION - LOOKING NORTH
1/4" = 1'-0"2
EQUIPMENT ROOM SECTION - LOOKING WEST
7. THERMOSTATS SHALL BE MOUNTED AT A HEIGHT OF 46" AFF TO ENSURE
TOP AND BOTTOM OF THERMOSTAT FALLS ONTO CMU COURSE.
6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR
DIFFUSERS UNLESS NOTED OTHERWISE IN SPECIFICATIONS. FLEXIBLE
DUCT SIZE SHALL BE SAME AS NECK SIZE OF DIFFUSER AND SHALL NOT
EXCEED 5 FEET IN LENGTH.
5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH
ARCHITECTURAL REFLECTED CEILING PLAN.
4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS
NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.
3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND
BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK.
LOCATE BALANCE DAMPER AS CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.
2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY
LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT
SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.
1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET
SIZE UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS
GREATER THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT
SIZE LARGER (MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO
WITHIN 3 FEET OF BOX BEFORE REDUCING TO BOX INLET SIZE.
GENERAL HVAC NOTES:
6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND
ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL
AIR VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS,
AND ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.
5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM
UP OR HORIZONTAL.
4. INSTALL PIPING FREE OF SAGS AND BENDS.
3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS
IS JOINED.
2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH
TAKE-OFFS UP TO ONE-HALF THE DIAMETER OF THE MAIN.
1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4" UNLESS NOTED
OTHERWISE.
GENERAL PIPING NOTES:
KEYED NOTES
7.129 24" DEEP INTAKE PLENUM, SAME DIMENSION AS LOUVER. PARTITION
INTERIOR OF PLENUM AS SHOWN ON DETAIL 7, SHEET M-501.
8.101 RACK REFRIGERANT PIPING VERTICALLY ALONG EXTERIOR WALL ABOVE
DOORWAY AND DOWN ALONG WALL TO UNITS. PIPING TO BE SIZED BY
RESPECTIVE EQUIPMENT MANUFACTURERS. PAINT JACKETING TO MATCH
ADJACENT SURFACE.
1/8" = 1'-0"3
REFRIGERATION PIPING RACK - LOOKING WEST
S
AIR COOLED CONDENSING
UNIT
W.P. DISCONNECT BY
SWITCH GEAR SUPPLIER
CONCRETE PAD
(REFER TO STRUCTURAL AND CIVIL
DRAWINGS)
LOW VOLT
HIGH VOLT
REFRIGERATION LINE
CONNECTION
NOTE:
1. CONCRETE PAD SHALL BE 4" LARGER
THAN CONDENSING UNIT FOOTPRINT IN
EACH DIRECTION AND A MINIMUM 4" THICK.
CAULK ALL AROUND
DUCT WORK
INSULATION
JACKET
BANDING
FULL LENGTH
PIANO HINGE
FRAME - SAME
MATERIAL AS DUCT
GASKET ALL AROUND
PERIMETER
1" MIN. HIGH-DENSITY
FIBERGLASS INSUL.
DOVETAILS
BANDING
SASH CAM AND LATCH
DOOR - SAME MATERIAL
AS DUCT
3/8"3/8"
3"
MAX
3"
MAX
SUPPLY FAN
DX COIL
ACCESS SECTION HOT WATER COIL
4" THICK HOUSEKEEPING PAD
(SEE STRUCTURAL DRAWINGS
FOR TYPE AND SIZE)
MIXING SECTION
TYPE PF-1 PRE-FILTERS
TYPE FF-1 FINAL FILTERS
NOTE:
1. DX COIL SECTION AND ACCESS SECTION IMMEDIATELY
DOWNSTREAM FOR AHU-1 AND AHU-2 ONLY.
ACCESS SECTION
FLEXIBLE DUCT
COLLAR
METAL CLAMP
VOLUME DAMPER
45º BRANCH DUCT TAKE-OFF
SUPPLY DUCTWORK
DUCT INSULATION
/1
MAX. SAG = 1/2" PER
FOOT OF LENGTH
4 19/32"
METAL CLAMP
METAL DUCT ELBOW,
LONG RADIUS, DIE STAMPED
SAME SIZE AS DIFFUSER
INLET CONNECTION
DIFFUSER
CEILING
MAX. LENGTH NOT TO EXCEED 5'-0"
WALL
PROVIDE ANGLES AT
TOP AND SIDES
DAMPER WHERE SPECIFIED
SEE DRAWINGS FOR DUCT
SIZE, SEE SPECIFICATION
FOR INSUL. REQUIREMENTS
ACCESS DOOR
(MIN 10"x10")
INSECT SCREEN TO
BE REMOVABLE OR HINGED
AT TOP
CAULK EDGE
FOR AIR TIGHTNESS.
WATERPROOF
CAULKING
ALL AROUND
LOUVER AS
SCHEDULED
CONNECTION
TYP FOR TOP
AND SIDES
KEYED NOTES:
USE PVC COATED METALLIC DUCT FOR BOTTOM OF OUTSIDE
AIR INTAKE DUCT FROM LOUVER TO THIS POINT.
SLOPE BOTTOM OF PLENUM
TO DRAIN THROUGH LOUVER
DUCT
DUCT MOUNTED SMOKE DETECTOR
(PROVIDED AND INSTALLED BY
CONTROLS CONTRACTOR)
FIRE ALARM PANEL AND WIRING
(BY FIRE PROTECTION CONTRACTOR)
9'-4"
3'-2" 2'-0" 4'-2"
40x26
20x20
20x8
18x18
16x18
24" DEEP PLENUM.
FULL DIMENSIONS OF
LOUVER
SHEET METAL PARTITION
IN LOUVER PLENUM (TYP)
DUCT CONNECTION
(TYP)
VENT CAP
STORM COLLAR
ADJUSTABLE ROOF FLASHING
ROOF
DURAVENT TYPE PVP VENTING OR EQUAL
1" MINIMUM CLEARANCE -
USE ATTIC INSULATION
SHIELD (FIELD SUPPLIED)
FIRE STOP SPACER
HEATER
#8 SHEET METAL SCREWS
SINGLE-WALL ELBOW OR
ALTERNATE TEE FITTING
SINGLE-WALL VENT PIPE
VENT ADAPTER
1" MINIMUM
CLEARANCE
3'-0" MIN.
NOTE:
INSTALL FIRE DAMPER ACCORDING TO MANUFACTURERS WRITTEN INSTRUCTIONS.
2" MAX
ACCESS DOOR 18"x18"
OR 2" LESS THAN DUCT
SIZE ALL AROUND
(SEE DETAIL)
LINTEL
FIRE DAMPER
DUCTWORK
-SEE PLANS AND SPECIFICATIONS
FOR SIZE AND MATERIAL
MOUNTING ANGLE (TYP)
SLEEVE
RATED WALL
ROOF INTAKE CAP
6" PIPE
ROOF
AIR INLET CONNECTION
(FLEXIBLE BOOT AND
BAND CLAMPS ARE
RECOMMENDED)
BURNER
CONTROL
BOX
BURNER
CONTROL
BOX
4" INTAKE PIPE 4" INTAKE PIPE
36" MINIMUM
AIR INLET CONNECTION
(FLEXIBLE BOOT AND
BAND CLAMPS ARE
RECOMMENDED)
STORM COLLAR
ADJUSTABLE ROOF FLASHING
ACCESS DOOR 18"x18"
OR 2" SMALLER THAN
DUCT SIZE ALL AROUND
(SEE DETAIL)
FIRE DAMPER
11/32"
2" MAX.
FINISHED FLOOR
(RATED)
SLEEVE
MOUNTING ANGLE (TYP)
DUCTWORK
-SEE PLANS AND SPECIFICATIONS
FOR SIZE AND MATERIAL
NOTE:
INSTALL FIRE DAMPER ACCORDING TO MANUFACTURERS WRITEN INSTRUCTIONS.
SUPPLY AIR
FACTORY INSTALLED REHEAT COIL
DUCT ACCESS DOORS. REFER TO
SPECIFICATION SECTION 23 00 00 -
AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS FOR
REQUIREMENTS.
PROVIDE A MINIMUM OF 3'-0" OF
STRAIGHT DUCT UPSTREAM OF
INLET FLOW SENSOR FOR INLET
SIZES 12" DIAMETER AND BELOW.
PROVIDE A MINIMUM OF 3X THE
INLET DIAMETER OF STRAIGHT
DUCT UPSTREAM OF THE INLET
FLOW SENSOR FOR INLET SIZES
ABOVE 12" DIAMETER.
AIR TERMINAL UNIT
WRAP THE REHEAT COIL WITH EXTERNAL
INSULATION AS INDICATED IN SPECIFICATION
SECTION 23 07 00 - THERMAL INSULATION
FOR MECHANICAL SYSTEMS.
PROVIDE AT LEAST 24" OF CLEARANCE ON
CONTROLLER SIDE OF AIR TERMINAL UNIT.
THE CLEARANCE AREA SHALL EXTEND THE
FULL LENGTH OF THE AIR TERMINAL UNIT.
REHEAT COIL
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-501
HVAC DETAILS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
NO SCALE1
SLAB MOUNTED CONDENSING UNIT
NO SCALE2
HINGED ACCESS DOOR FOR
INSULATED RECTANGULAR DUCT
NO SCALE5
INSIDE AIR HANDLING UNIT (AHU & MAU) SCHEMATIC ELEVATION
NO SCALE6
FLEXIBLE DUCT TO CEILING DIFFUSER
NO SCALE3
DUCT CONNECTION TO LOUVER
NO SCALE4
DUCT MOUNTED SMOKE
DETECTOR CONTROL DIAGRAM (TYPICAL)
11/09/18 B-3 FINAL
NO SCALE11
LOUVER L-1 PARTITION
NO SCALE10
INFRARED RADIANT HEATER VENT ROOF PENETRATION
NO SCALE8
VERTICAL FIRE DAMPER DETAIL
NO SCALE9
INFRARED RADIANT HEATER COMBUSTION AIR INTAKE PENETRATION
NO SCALE7
HORIZONTAL FIRE DAMPER DETAIL
NO SCALE12
SUPPLY AIR TERMINAL UNIT WITH REHEAT COIL
MOTOR AND GUARD FOR
BELT DRIVE UNITS IN
ACCESSIBLE POSITION
FAN HOUSING
SUPPORT BRACKETS
DUCT TRANSITION
AS REQUIRED (TYP OF 2)
FLEXIBLE DUCT
CONNECTOR (TYP)
VIBRATION ISOLATORS
-TYPICAL FOR 4
HANGER ROD - SAME
SIZE AS SUPPORT
BRACKET HOLE, ATTACH
TO BUILDING STRUCTURE
DUCTWORK - SAME SIZE AS
INDICATED ON DRAWINGS
NOTE:
1 MINIMUM FIVE (5) DUCT DIAMETERS OF
STRAIGHT DUCT - SAME SIZE AS FAN
CONNECTION.
CORROSION
RESISTANT
FLEXIBLE
CONNECTION
CORROSION
RESISTANT
EXHAUST DUCT -
SEE DWGS AND
SPEC. FOR SIZE
AND MATERIAL
FAN INLET
FAN SUPPORT FRAME
24" FAN DISCHARGE
EXTENSION, SAME DIMENSIONS
AS FAN OUTLET
WEATHER PROOF
MOTOR COVER
VIBRATION ISOLATORS
- TYP. OF 4
CONCRETE PAD
ON GRADE. REFER
TO STRUCTURAL
DRAWINGS
1/2"x1/2" BIRDSCREEN
ON OUTLET
ABOVE GRADE
LOCATE DAMPER AS FAR
FROM GRILLE AS POSSIBLE
SEAL DUCT CONNECTION
AIR TIGHT (CONNECTION MAY
BE ON TOP OF PLENUM)
SHEET METAL PLENUM.
PAINT INTERIOR OF METAL
PLENUM FLAT BLACK
RETURN/EXHAUST
GRILLE
CEILING
SCREEN
ANGLE IRON
REINFORCING
BOLTS
METAL SCREEN
FRAME
30.00°
36" MIN.
ABOVE
ROOF
R(W/2)
WATERPROOF
SEAMS AND
JOINTS (TYP)
OUTLET AREA
SHALL BE 25%
LARGER THAN
DUCT SIZE
ARCHITECTURAL
METAL ROOF MOTORIZED DAMPER
DAMPER ACTUATOR
AIRTIGHT
ACCESS DOOR EXHAUST DUCT
3/4" BALL VALVE WITH
THREADED CONNECTION
AND CAP
ONE-PIECE SHEET METAL
CURB/FLASHING (REFER
TO ARCH. DRAWINGS)
DRIP FLASHING
AROUND ENTIRE
DUCT AND CURB
R=1 1/2 W
PERMISSIBLE ELBOWS
AIR FLOW
PERMISSIBLE TRANSITIONS
AIR FLOW
R
AIR FLOW
R
R=1 1/2 W
R
AIR FLOW
R
'-0
/2 5
6 "
R 0'-0 2
15 /2 5 6
R 0'-0 2
15 /2 5 6
W
W
W
R=1 1/2 W
45° 45°
24 GAUGE SHEET METAL SLEEVE
EXTEND 1 1/2" BEYOND EACH SIDE
SEAL SLEEVE TO WALL OPENING
WITH FIRE RESISTANT SEALANT
TAPE (2" MIN. WIDTH)
FIRE RESISTANT SEALANT ON
ENDS OF DUCT INSULATION
TYPE T INSULATION
(U.S. GYPSUM THERMAFIBER BATS)
DUCT INSULATION
FIRE RATED WALL
FIRE RATED WALL
NON-RATED WALL
DUCT INSULATION
NON-RATED WALL
NOTES:
1 THIS DETAIL APPLIES ONLY FOR INSULATED DUCTS REQUIRING
CONTINUOUS INSULATION THROUGH WALL, AND DUCTS NOT REQUIRING
FIRE DAMPERS.
24 GAUGE SHEET METAL SLEEVE
EXTEND 1 1/2" BEYOND EACH SIDE
SEAL SLEEVE TO WALL OPENING
WITH SEALANT
TAPE (2" MIN. WIDTH)
DUCTWORK
DUCTWORK
DEPRESSED TO AVOID
AN OBSTRUCTION
SMOOTH RADIUS ELLS
TO AVOID AN OBSTRUCTION
LOCATE DAMPER AS
FAR FROM GRILLE AS
POSSIBLE
DIFFUSER OR GRILLE
LEAD-LINED CEILINGLEAD WRAP
DUCT OR WRAP
TO CEILING AS
SHOWN
SHEET METAL
DUCTWORK
LEAD WRAP DUCT (REFER TO
ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS)
MIN. 2" LEAD-LINING
OVERLAP AROUND
ENTIRE DUCT
PENETRATION
DUCT HEIGHT
ABOVE CEILING "H"
"W"
DUCT WIDTH "W"
("W" + "H") x 2
BOILER
EXHAUST AIR VENT
FINISHED ROOF
FINISHED ROOF
COMBUSTION AIR INTAKE
24" MAXIMUM
18" MINIMUM
36" 12"
EQUIPMENT PAD
(REFER TO STRUCTURAL DRAWINGS)
VENT CAP
REFER TO ARCHITECTURAL
DRAWINGS FOR ROOF
PENETRATION
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-502
HVAC DETAILS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
NO SCALE1
FAN DUCTED INLET/OUTLET
NO SCALE3
UTILITY FAN
NO SCALE4
RETURN/EXHAUST
GRILLE DUCT CONNECTION
NO SCALE2
GOOSENECK ROOF TERMINATION
11/09/18 B-3 FINAL
NO SCALE6
TYPICAL DUCT TRANSITIONS
NO SCALE5
DUCT PENETRATION THRU INTERIOR WALL
NO SCALE7
TYPICAL DUCT OFFSET
NO SCALE9
LEAD-LINED CEILING DUCT PENETRATION
NO SCALE8
BOILER COMBUSTION AIR AND VENTING
MV
COLD WATER FILL
FROM GLYCOL TANK
AIR SEPARATOR
REDUCER
(WHERE REQ'D)
TO
SYSTEM
PUMPS(S)
SEE PLANS
FOR PIPE SIZE
/1
12"
MIN
AV
AV
AIR CHARGED
PORT
VERTICAL BLADDER
TYPE EXPANSION
TANK
SHUT-OFF
VALVE (TYP)
PRESSURE
GAUGE
AUTOMATIC
AIR VENT
SEE PLANS
FOR PIPE SIZE
FROM PRIMARY
HEATING
EQUIPMENT
REDUCER
WHERE REQ'D
HIGH CAPACITY AIR VENT
EQUAL TO BELL & GOSSET
MODEL #107a
CONNECT
TO MAINS
HWS
HWR
AIR FLOW
SHUTOFF VALVE
BALANCING VALVE
STRAINER
CAPPED
DRAIN VALVE
ACV
UNION (TYP)
UNIT
HEATER
HANGER RODS TO
STRUCTURE
SEE DWGS FOR SIZE
VENT VALVE, LOCATE
VALVE AT MOST
ACCESSIBLE LOCATION
1/4" SOFT COPPER
TUBING
/8
6" MIN.
BRANCH OR
MAIN PIPING
COILS AND SUBCIRCUITS
MAIN PIPES
1/2"
/3
6" MIN.
IN-LINE PUMP PRESSURE GAGE
WITH COCK (TYP)
REDUCER (TYP)
-AS REQUIRED
FLEXIBLE
CONNECTOR (TYP)
STRAINER WITH BLOW OFF
VALVE AND NIPPLE
CONNECTIONS SO PUMP
CAN BE REMOVED WITHOUT
DISTURBING CONNECTED PIPING
CHECK VALVE
SHUTOFF VALVE (TYP)
BALANCING
VALVE
GLOBE VALVE
REDUCING TEE
PRESSURE GAUGE
WITH COCK
GLOBE VALVE
OR FIXED
ORIFICE PLATE
SHUTOFF
VALVE (TYP)
REDUCING TEE
3/4" CONNECTED TO SUCTION
SIDE OF SECONDARY PUMPS
SIGHT GLASS OR
FLOW INDICATOR
FUNNEL
3/4" FILL AND
VENT VALVE
PRESSURE RATED POT FEEDER
MIN CAPACITY 1/1000 OF TOTAL
SYSTEM VOLUME
UNION TYPICAL
BYPASS ON-HALF OF
MAIN PIPE SIZE
MINIMUM 3/4"
1" DRAIN VALVE
3/4" CONNECTED TO DISCHARGE
SIDE OF SECONDARY PUMPS
ZONE
HWR
HWS
SHUT OFF VALVE (TYP)
BALANCING VALVE (TYP)
MANUAL AIR VENT
PROVIDE STAINLESS
STEEL ENCLOSURE
AUTOMATIC CONTROL
VALVE
GAUGE CONNECTION
THERMOMETER
PUMP
NOTE:
1. UNLESS OTHERWISE INDICATED, SEE PLANS AND
SPECIFICATIONS FOR PIPE SIZE AND MATERIALS.
2. REFER TO INLINE PUMP DETAIL FOR ADDITIONAL PIPING
REQUIREMENTS.
TO AIR SEPARATOR
PRESSURE RELIEF
VALVE
SET AT 50 PSIG
LEVEL SWITCH
PRESSURE GAUGE
PRESSURE SWITCH
COLD WATER FILL
2" AIR GAP
COVER
GLYCOL/WATER
STORAGE TANK
STRAINER
FLEX CONNECTOR
PUMP
ANCHORS
L
P
NOTE:
UNLESS OTHERWISE INDICATED, SEE PLANS AND
SPECIFICATIONS FOR PIPE SIZE AND MATERIAL.
CHECK VALVE
HANGER ROD
SIZE AS SPECIFIED
ADJUSTABLE
CLEVIS HANGER
JACKETING
WHERE SPECIFIED
RIGID INSULATION
AS SPECIFIED
PIPE
INSULATION PROTECTION
SHIELD MATERIAL
FIRE RATED WALL
24 GAUGE SHEET METAL SLEEVE
EXTENDED 1 1/2" BEYOND EACH SIDE
SEAL SLEEVE TO WALL OPENING
WITH FIRE RESISTANT SEALANT
TAPE (2" MIN. WIDTH)
PIPE INSULATION
HOT WATER PIPE
FIRE RESISTANT SEALANT ON
ENDS OF PIPE INSULATION
TYPE "T" INSULATION
(U.S. GYPSUM THERMAFIBER BATS)
INTERIOR WALL
WALL SLEEVE, OF
SPECIFIED MATERIAL
ESCUTCHEON
WHERE SPECIFIED
PIPE INSULATION
AND JACKETING
WHERE CALLED FOR
TIGHTLY CAULK WITH
SILICONE SEALANT
FOR MIN. 2" EACH END
PIPE - MUST BE
FREE OF STRAIN
TIGHTLY PACKED
WITH FOAM - IN
PLACE INSULATION
1/2" TO 1"
CLEARANCE
ALL SIDES
1/2" TO 1"
CLEARANCE
ALL SIDES
INTERIOR
MASONRY/CONCRETE WALL
WALL SLEEVE MATERIAL
AS SPECIFIED
ESCUTCHEON MATERIAL AS
SPECIFIED
PIPE INSULATION AND
JACKETING WHERE CALLED
FOR
PIPE - MUST BE FREE
OF STRAIN
TIGHTLY PACKED WITH
FOAM-IN-PLACE
INSULATION
BALANCING VALVE
SIZE
-AS INDICATED ON PLANS
SHUTOFF VALVE (TYP)
CHECK VALVE
REDUCER (TYP)
-AS REQUIRED
PUMP
MOTOR
PUMP BED PLATE
LEVEL GROUT
HOLD DOWN BOLTS
FLEXIBLE PIPE
CONNECTOR (TYP)
3" THICK CONCRETE
EQUIPMENT PAD TO
EXTEND 6" BEYOND PUMP
BED PLATE ON ALL SIDES
PRESSURE GAGE
NOT REQUIRED WHEN SUCTION DIFFUSER
IS SCHEDULED OR SPECIFIED.
NOT REQUIRED WHEN TRIPLE-DUTY VALVE
IS SCHEDULED OR SPECIFIED.
KEYED NOTES:
STRAINER
WITH BLOW OFF
VALVE AND NIPPLE
EQUIPMENT
GAS SUPPLY
SIZE AS INDICATED
ON DRAWINGS
SHUT-OFF VALVE
SCREWED UNION
SAME SIZE AS
EQUIPMENT
CONNECTION
DIRT POCKET
PLUG OR CAP
MAX
-3'-0"
- 6
H
RADIATION ROOM X-RAY
SOURCE SIDE
LEAD SAME THICKNESS
AS IN WALL
LEAD LINED WALL (REFER TO
ARCHITECTURAL DRAWINGS)
NOTES:
1. H = OUTSIDE DIAMETER OF PIPE INSULATION
2. PROVIDE PIPE ELBOW AS CLOSE TO PENETRATION AS POSSIBLE
3X H
WRAP LEAD AROUND ENTIRE
PIPE AND INSULATION
CIRCUMFERENCE
MIN. 2" OVERLAP AROUND
ENTIRE PENETRATION
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
ISSUED
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
9600 NE Cascades Parkway, Suite 100 Portland, OR 97220 phone: 503-548-1494 meadhunt.com www.tetratech.com
711 TANK FARM ROAD, SUITE 110
SAN LUIS OBISPO, CA 93401
PHONE: (805) 542-9052 FAX: (805) 542-9254
/7 /2
:5 :1
P
M C
R e vi t L o ca l\
-1
.0
-M -C
E N
T R
A L
-2 a r.
rv t
M-511
PIPING DETAILS
O R
A N
G
K in g sl e y
F ie ld K la m a th
F a lls
O
R
C O
N S
T R
U C
T C
O R
R O
S
IO
N C
O N
T R
O L H
A N
G A
R
3142200-121252.01
AR
BGD
NOVEMBER 9, 2018
ADK
NO SCALE11
EXPANSION TANK WITH AIR SEPERATOR
NO SCALE9
HOT WATER UNIT HEATER
PIPING w/ TEMPERATURE CONTROL AND ACV
NO SCALE6
AIR VENT PIPING
NO SCALE10
IN-LINE PUMP PIPING
NO SCALE5
CHEMICAL POT FEEDER
11/09/18 B-3 FINAL
NO SCALE8
RADIANT MANIFOLD
NO SCALE7
GLYCOL-WATER MAKE-UP
NO SCALE4
CLEVIS PIPE HANGER
NO SCALE2
INSULATED PIPE
THRU FIRE RATED WALL
NO SCALE1
INTERIOR WALL PIPE SLEEVE
NO SCALE3
INTERIOR
WALL SLEEVE INSULATED PIPE
NO SCALE12
END SUCTION PUMP PIPING
NO SCALE13
EQUIPMENT GAS CONNECTION (TYP)
NO SCALE14
PIPE PENETRATION THROUGH LEAD-LINED WALL
MV
MV MV
PITCH
PITCH
MV MV
HEATER MOVEMENT
BURNER CONTROL BOX
ADAPTER
/3
ADAPTER
STAINLESS STEEL GAS
CONNECTOR, FORMED
INTO SMOOTH C-SHAPE
DRIP LEG/SEDIMENT TRAP
BALL VALVE/INLET TAP
BALL VALVE/INLET TAP
45.00°
.0
0°
REMOVABLE CAP TO
CLEAN SEDIMENT TRAP
SIDE VIEW END VIEW
1/4"2" MAX DISPACEMENT
THERMOMETER (TYP)
FLEXIBLE PIPE CONNECTOR (TYP)
MANUAL AIR VENT
UNION (TYP)
DRAIN VALVE
HEATING
COIL
GAGE CONNECTION (TYP)
SHUTOFF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.