W912JM-16-R-0003-0006_Solicitation_Amendment.pdf
PDF 29 KB Posted
- Attached to
- Construct Air National Guard C-130 Squadron Operations Facility Federal contract opportunity
- Solicitation number
- W912JM16R0003
About this file
W912JM-16-R-0003-0006 Solicitation Amendment
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USPFO-GA-P&C, ATTN: MICHELLE MEADORS
1000 HALSEY AVE, BLDG 447
MARIETTA GA 30060-5099
F8W3CE6053AW02 XDQU949500
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide the follow ing:
1. Revised Specification Section 01 32 01.00 10 Project Schedule (R2) - 26 May 2016
2. Revised Specification Section 01 33 00 10 Submittal Procedures (R1) - 26 May 2016
3. Revised Specification Section 01 45 00.00 10 Quality Control (R1) - 26 May 2016
4. Revised Solicitation Section 00010 Statement of Work, added paragraph 4
Refer to fbo.gov for attachments.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JM-16-R-0003
X 9B. DATED (SEE ITEM 11)
29-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-May-2016
CODE
USPFO-GA-P&C (W912JM)
1000 HALSEY AVE. BLDG 447
MARIETTA GA 30060
W912JM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912JM
FACILITY CODECODE
EMAIL:TEL:
W912JM-16-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
TABLE OF CONTENTS
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 / SF 1442 BACK
SECTION 00010 - BIDDING SCHEDULE AND NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00110 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS
SECTION 00120 - EVALUATION FACTORS FOR AWARD
SECTION 00600 - REPRESENTATIONS AND CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01000 - DIVISION 1, GENERAL REQUIREMENTS THRU DIVISION 2 - 33, TECHNICAL
REQUIREMENTS
ATTACHMENT 1 - PLANS
ATTACHMENT 2 - WAGE DETERMINATION
ATTACHMENT 3 - SOLICITATION QUESTIONS AND ANSWERS DOCUMENT
EXHIBIT A- PERFORMANCE RELEVANCY QUESTIONNAIRE
EXHIBIT B- SUBCONTRACTOR INFORMATION AND CONSENT FORM
EXHIBIT C- REFERENCE QUESTIONNAIRE PACKAGE
EXHIBIT D- OPTION INFORMATION FORM
SECTION 00010 BIDDING SCHEDULE AND NOTES
BIDDING SCHEDULE
BIDDING SCHEDULE
PROJECT TITLE: C-130 Squad Ops Facility
PROJECT NUMBER: XDQU949500
ITEM DESCRIPTION UNIT OF
MEASURE
QUANTITY UNIT
PRICE
TOTAL
PRICE
1 C-130 Squadron Operations Facility - Construction Provide all personnel, material, equipment, tools, and incidental items required for the removal and construction of squadron operations facility in accordance with construction documents (drawings/plans and specifications).
Job 1
2 OPTION 1 - Manually Operated Vehicle Barriers & Removable/Lockable Pipe Bollards
3 OPTION 2 - Grassroad Pavers, Concrete wheel stops, and pavement markings
(30,000 SF)
4 OPTION 3 - Additional Sidewalk (6' x 640 LF) with lighted path bollards
5 OPTION 4 - Masonry Screenwall Dumpster Enclosure
6 OPTION 5 - Upgrade Interior Flooring/Wall Finishes throughout Facilit;
7 OPTION 6 - Upgrade Facility Thermal Envelope
8 OPTION 7 - Upgrade Exterior Finishes Job 1 9 OPTION 8 - Solar Tube
Skylights/Corridor Daylighting
10 OPTION 9 - Electrical - Additional Exterior Lighting
11 OPTION 10 - Electrical - Upgrade Exterior Lighting
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
4. CLINS 0002 through CLIN 0011 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within the time period provided in the awardee’s accepted proposal.
STATEMENT OF WORK
1. General. The Georgia National Guard located at the 165th Airlift Wing, Savannah/Hilton Head International
Airport, Savannah, Georgia and the USPFO for Georgia intends to to award a single, firm fixed-price construction contract. The project consists of a new C-130 Squadron Operations facility for the 165th Airlift Wing at Savannah/Hilton Head IAP, GA.
2. Description of Project. Contractor shall construct a 24,600 SF Air National Guard C-130 Squadron Operations facility adjacent to active aircraft parking apron utilizing conventional design and construction methods to include standing seam metal roof, reinforced block masonry, and slab on grade foundation with grade beams.
Scope includes substantial site work involving pavements, electrical, telecommunications, storm drain, gas, water, and sanitary sewer improvements. Scope also includes demolition of existing buildings involving asbestos and lead abatement.
3. Requirements. Contractor shall provide all personnel, material, equipment, tools, and incidental items required for this project in accordance with the following construction documents:
i. Specifications – Type B-3 Final Construction Document Submittal for C-130 Squadron Operations Facility dated February 1, 2016; Pond Project No. 1130050
ii. Drawings/Plans – B-3 (Final) Submittal for C-130 Squadron Operations Facility dated February 1, 2016; Pond Project No. 1130050
4. Government Retained Property. Government will retain both of the two newer split system air conditioners and one new Package Terminal Air Condition (PTAC) from building 1914. The Government will mark the equipment with signage. The Contractor shall carefully disconnect and set-aside two air handlers and their matching condenser units along with one PTAC for Government pick-up.
END OF SECTION 00010