W912JM-16-R-0003-0006_Solicitation_Amendment.pdf

PDF 29 KB Posted

Attached to
Construct Air National Guard C-130 Squadron Operations Facility Federal contract opportunity
Solicitation number
W912JM16R0003
Issued by
Department of the Army Georgia Army National Guard

About this file

W912JM-16-R-0003-0006 Solicitation Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Construct Air National Guard C-130 Squadron Operations Facility, newest first.
File Type Posted
W912JM-16-R-0003-0007_Solicitation_Amendment.pdf PDF
Specifications_Table_of_Contents_and_Appendices_Page_1_(R1)_-_26_May_2016.pdf PDF
Specification_Section_01_45_00.00_10_Quality_Control_(R1)_-__26_May_2016.pdf PDF
Specification_Section_01_33_00_10_Submittal_Procedures_(R1)_-__26_May_2016.pdf PDF
Specification_Section_01_32_01.00_10_Project_Schedule_(R2)_-__26_May_2016.pdf PDF
J A_Brand_Name_Redacted.pdf PDF
W912JM-16-R-0003-0005_Solicitation_Amendment.pdf PDF
W912JM-16-R-0003-0004_Solicitation_Amendment.pdf PDF
Questions_and_Answers_-_25_May_2016.pdf PDF
Questions_and_Answers_-_20_May_2016.pdf PDF
W912JM-16-R-0003-0003_Solicitation_Amendment.pdf PDF
Civil_Plan_Sheet_C-102_REV1.pdf PDF
Questions_and_Answers_-_19_May_2016.pdf PDF
W912JM-16-R-0003-0002_Solicitation_Amendment.pdf PDF
Civil_Plan_Sheet_C-103_REV1.pdf PDF
Specification_Section_01_32_01.00_10_Project_Schedule_(R1)_-__16_May_2016.pdf PDF
Civil_Plan_Sheet_C-101_REV1.pdf PDF
Pre-Proposal_Conference_PPT_Presentation_3MAY2016.pdf PDF
Report_of_Asbestos_and_Lead-Based_Paint_Survey.pdf PDF
Pre-Proposal_Conference_Attendees_3MAY2016.pdf PDF
W912JM-16-R-0003-0001_Solicitation_Amendment.pdf PDF
Exhibits_A_-_D.docx DOCX document
W912JM-16-R-0003_Solicitation.pdf PDF
Synopsis_C-130_Squadron_Operations_Facility.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPFO-GA-P&C, ATTN: MICHELLE MEADORS

1000 HALSEY AVE, BLDG 447

MARIETTA GA 30060-5099

F8W3CE6053AW02 XDQU949500

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide the follow ing:

1. Revised Specification Section 01 32 01.00 10 Project Schedule (R2) - 26 May 2016

2. Revised Specification Section 01 33 00 10 Submittal Procedures (R1) - 26 May 2016

3. Revised Specification Section 01 45 00.00 10 Quality Control (R1) - 26 May 2016

4. Revised Solicitation Section 00010 Statement of Work, added paragraph 4

Refer to fbo.gov for attachments.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JM-16-R-0003

X 9B. DATED (SEE ITEM 11)

29-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-May-2016

CODE

USPFO-GA-P&C (W912JM)

1000 HALSEY AVE. BLDG 447

MARIETTA GA 30060

W912JM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912JM

FACILITY CODECODE

EMAIL:TEL:

W912JM-16-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

TABLE OF CONTENTS

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 / SF 1442 BACK

SECTION 00010 - BIDDING SCHEDULE AND NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00110 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS

SECTION 00120 - EVALUATION FACTORS FOR AWARD

SECTION 00600 - REPRESENTATIONS AND CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

SECTION 01000 - DIVISION 1, GENERAL REQUIREMENTS THRU DIVISION 2 - 33, TECHNICAL

REQUIREMENTS

ATTACHMENT 1 - PLANS

ATTACHMENT 2 - WAGE DETERMINATION

ATTACHMENT 3 - SOLICITATION QUESTIONS AND ANSWERS DOCUMENT

EXHIBIT A- PERFORMANCE RELEVANCY QUESTIONNAIRE

EXHIBIT B- SUBCONTRACTOR INFORMATION AND CONSENT FORM

EXHIBIT C- REFERENCE QUESTIONNAIRE PACKAGE

EXHIBIT D- OPTION INFORMATION FORM

SECTION 00010 BIDDING SCHEDULE AND NOTES

BIDDING SCHEDULE

BIDDING SCHEDULE

PROJECT TITLE: C-130 Squad Ops Facility

PROJECT NUMBER: XDQU949500

ITEM DESCRIPTION UNIT OF

MEASURE

QUANTITY UNIT

PRICE

TOTAL

PRICE

1 C-130 Squadron Operations Facility - Construction Provide all personnel, material, equipment, tools, and incidental items required for the removal and construction of squadron operations facility in accordance with construction documents (drawings/plans and specifications).

Job 1

2 OPTION 1 - Manually Operated Vehicle Barriers & Removable/Lockable Pipe Bollards

3 OPTION 2 - Grassroad Pavers, Concrete wheel stops, and pavement markings

(30,000 SF)

4 OPTION 3 - Additional Sidewalk (6' x 640 LF) with lighted path bollards

5 OPTION 4 - Masonry Screenwall Dumpster Enclosure

6 OPTION 5 - Upgrade Interior Flooring/Wall Finishes throughout Facilit;

7 OPTION 6 - Upgrade Facility Thermal Envelope

8 OPTION 7 - Upgrade Exterior Finishes Job 1 9 OPTION 8 - Solar Tube

Skylights/Corridor Daylighting

10 OPTION 9 - Electrical - Additional Exterior Lighting

11 OPTION 10 - Electrical - Upgrade Exterior Lighting

NOTES

1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.

2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.

4. CLINS 0002 through CLIN 0011 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within the time period provided in the awardee’s accepted proposal.

STATEMENT OF WORK

1. General. The Georgia National Guard located at the 165th Airlift Wing, Savannah/Hilton Head International

Airport, Savannah, Georgia and the USPFO for Georgia intends to to award a single, firm fixed-price construction contract. The project consists of a new C-130 Squadron Operations facility for the 165th Airlift Wing at Savannah/Hilton Head IAP, GA.

2. Description of Project. Contractor shall construct a 24,600 SF Air National Guard C-130 Squadron Operations facility adjacent to active aircraft parking apron utilizing conventional design and construction methods to include standing seam metal roof, reinforced block masonry, and slab on grade foundation with grade beams.

Scope includes substantial site work involving pavements, electrical, telecommunications, storm drain, gas, water, and sanitary sewer improvements. Scope also includes demolition of existing buildings involving asbestos and lead abatement.

3. Requirements. Contractor shall provide all personnel, material, equipment, tools, and incidental items required for this project in accordance with the following construction documents:

i. Specifications – Type B-3 Final Construction Document Submittal for C-130 Squadron Operations Facility dated February 1, 2016; Pond Project No. 1130050

ii. Drawings/Plans – B-3 (Final) Submittal for C-130 Squadron Operations Facility dated February 1, 2016; Pond Project No. 1130050

4. Government Retained Property. Government will retain both of the two newer split system air conditioners and one new Package Terminal Air Condition (PTAC) from building 1914. The Government will mark the equipment with signage. The Contractor shall carefully disconnect and set-aside two air handlers and their matching condenser units along with one PTAC for Government pick-up.

END OF SECTION 00010