W912JF-17-R-0002-0003_Solicitation_Amendment.pdf
PDF 103 KB Posted
- Solicitation number
- W912JF-17-R-0002
About this file
Amendment #3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912JF-17-R-0002-0003_Solicitation_Amendment_Conforming_Copy.pdf | ||
| Addendum_2_-_08_41_13.pdf | ||
| Addendum_2_MILCON_SCIF.docx | DOCX document | |
| Addendum_2_-_12_22_00.pdf | ||
| Addendum_2_-_10_22_19.pdf | ||
| Questions_and_Answers_May_4_2017.xlsx | XLSX spreadsheet | |
| Addendum_2_-_08_33_23.pdf | ||
| Addendum_2_-_14_24_00.pdf | ||
| Addendum__MILCON_SCIF.docx | DOCX document | |
| Amendment_2_-_May_4_2017.pdf | ||
| Addendum_2_-_32_31_13.pdf | ||
| Addendum_2_-_10_51_55.pdf | ||
| Addendum_2_Electrical_Lighting_Plan_EL101.pdf | ||
| Addendum_2_Structural_Sheet_S102.pdf | ||
| Addendum_2_-_07_60_00.pdf | ||
| W912JF-17-R-0002-0001_Solicitation_Amendment.pdf | ||
| Addendum_1_MILCON_SCIF.docx | DOCX document | |
| SCIF_Site_visit_sign_in_sheet.pdf | ||
| EXHIBIT_A_-_Past_Performance_Relevancy_Questionnaire.doc | DOC document | |
| EXHIBIT_C_Past_Performance.doc | DOC document | |
| W912JF-17-R-0002_Solicitation.pdf | ||
| EXHIBIT_B_Subcontractor_Consent_Form.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F6Q6CE6146AW02 HKRZ129076
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this amendment is to correct the option line item schedule to match the itemized bid schedule in section 00010. The requirement for the Unit Seal at the entrance has been removed.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JF-17-R-0002
X 9B. DATED (SEE ITEM 11)
28-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-May-2017
CODE
USP&FO FOR ARKANSAS
DPFO-PC
NORTH LITTLE ROCK AR 72199-9600
W912JF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912JF-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0002
This CLIN has been renumbered to CLIN 0006.
CLIN 0003
This CLIN has been renumbered to CLIN 0007.
The CLIN description has changed from Concrete Entry to Concrete Entry * See Note Below*.
The CLIN extended description has changed from:
Finish Unit Seal in Stained Concrete Entry. Ref Section 01 1100 Summary of Work Section 1.6 additive bid items.
To:
**Disregard** Do Not Bid.
CLIN 0005
The CLIN description has changed from Mat Inset to Install Pervious Concrete.
The CLIN extended description has changed from:
Walk off Mat Inset. Ref Section 01 11 00Summary of Work Section 1.6 additive bid items.
To:
Fire Truck Access Lanes, Sidewalks, and Mechanical Yard Improvements.
CLIN 0006
This CLIN has been renumbered to CLIN 0002.
CLIN 0007
This CLIN has been renumbered to CLIN 0003.
The following have been modified:
NOTES
SECTION 00010
SECTION 00010 Solicitation Contract Form
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - PRICING SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
SECTION 10000 - GENERAL REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project No. HKRZ129076 dated March 25, 2016 ATTACHMENT 2- SOLICITATION QUESTIONS AND ANSWERS DOCUMENT to be inserted at award
EXHIBIT A- Performance Relevancy Questionnaire EXHIBIT B- Subcontractor Information and ConsentForm EXHIBIT C- Reference Questionnaire package
SECTION 00010 NOTES
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
4. Line items 0002 through 0007 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within 120 days.
5. Submit pricing for base SCIF Facility on CLIN 0001 (page 3). Submit pricing for each option (CLINs 0002- 0007) on their respective spaces. (pages 3-6).
6. Complete the Itemized Bid Schedule below to aid the Government's evaluation of pricing. In the event of a discrepancy in prices between the CLINs and the Itemized Bid Schedule, the individual CLIN pricng shall prevail.
Itemized Bid Schedule
Project Description
NDAA Construct DGS, RPA, IS Arkansas Air National Guard
Location Fort Smith Arkansas
Project Number HKRZ129076
Item No REFERENCE Item Description Est. Qty. Units Total Price
1 DIV 01 Specs General Requirements 1 LS
2 DIV 01 Specs Commissioning 1 LS
3 Drawings and Spec Substructure to include foundations, column footings, slab on grade, Elevator Pit, raised slabs, and concrete and earthwork required to perform these tasks.
1 LS
4 Drawings and Spec Superstructure to include Structural Steel, Floor Decks and slabs, Mezzanine, Roof Deck, Fire Proofing, and Trusses
1 LS
5 Drawings and Spec Interior and Exterior Stairs to include metal pan stairs, concrete, exterior metal stairs, and Mezzanine stairs.
1 LS
6 Drawings and Spec Exterior Closure to include Exterior walls, Brick veneer, metal wall panels, metal studs, insulation and vapor barrier, 1 LS
7 Drawings and Spec Exterior entrances and openings to include Windows, doors and hardware, storefront, louvers and screens.
1 LS
8 Drawings and Spec Roofing to include Standing Seam Metal Roof, Insulation and Fill, Flashing, Trim, Soffit, Gutters and Downspouts.
1 LS
9 DIV 09 Specs Raised Access Flooring 1 LS
10 Drawings and Spec Interior Construction to include interior partitions, doors, door hardware, casework, Finishes, Specialties, Furnishings
1 LS
10 DIV 14 Elevator 1 LS
11 DIV 21 Fire Suppression 1 LS
12 DIV 21 Clean Agent Fire Suppression 1 LS
13 DIV 22 Plumbing 1 LS
14 DIV 23 HVAC 1 LS
15 DIV 26 Electrical 1 LS
16 DIV 27 Communications 1 LS
17 DIV 28 Safety and Security 1 LS
18 DIV 31 Earthwork 1 LS
19 DIV 32 Exterior Improvements 1 LS
20 DIV 33 SITE Utilities Electrical including demolition
1 LS
21 DIV 33 Site Utilities Water, Sewer, Gas, Storm Drain including demolition
1 LS
22 DIV 33 Site Telecommunications Outside Plant including demolition
1 LS
Total (Base)
OPTION BID ITEMS Est. Qty. Units Total Price
Option‐001 Replace Hard Walls with Demountable Partitions Wall Type 7A
1 LS
Option‐002 Add W2 Windows 1 LS
Option‐003 Add Power Circuits to Entrance Cubbies 1 LS
Option‐004 Install Pervious Concrete in Fire Truck Access Lane, Sidewalks, and Mechanical Yard
1 LS
Option‐005 Replace hard walls with folding partitions in 1st floor conference rooms.
1 LS
Total (Options)
End of Section 00010
(End of Summary of Changes)
File details come from the government source that posted it. Updated .