Addendum MILCON SCIF HKRZ129076

SHEET T-101B

Contractor responsible to furnish and install new manhole 111A 20' distance from the building per note 2 on sheet T-101B.

Contractor responsible to furnish and install new manhole 120A 20' distance from building perimeter per note 10 on sheet T-101B.

SHEET C-103

Revise Note 2 to read 2. PROVIDE NEW DUCTBANK FROM NEW MANHOLES TO BUILDING 108. DUCTBANK SHALL CONSIST OF FOUR (4) 4” PVC CONDUITS WITH 3-3”CELL MESH FABRIC INNERDUCT TO BUILDING 108. CONTRACTOR MUST PROVIDE NEW MANHOLES 111a AND 120a AND DUCTBANK FROM MANHOLES TO EXISITNG BASE COMMUNICATIONS MANHOLES 111 AND 120. SEE NOTES 1 AND 9 ON SHEET T-101B FOR DUCTBANK TO MANHOLES 111 AND 120.

Sheet T-602 Revise note 2 to read 2. "New Manhole MH120A to be furnished and installed by contractor" from sheet T-602

Delete Note 6 "New duct segment furnished and installed by allied projects. This contractor to coordinate installation with allied projects contractor." From sheet T-602

Delete Sheet Keynote 9 "Optical Turnstiles" from Sheet A-101. The turnstile located in the Entry Room 100 is deleted from this project.

Delete Section 28 13 10 Optical Turnstiles from Specifications. The turnstile located in Entry Room 100 is deleted from this project.

Advantor is the sole source for the IDS security system (noted in the plans for this project). The IDS infrastructure and IDS System are a part of this project. IDS infrastructure plans are included in the existing project plans. Contact the ANG representative at Advantor (Sole Source) for the cost of the required IDS System.

File details come from the government source that posted it. Updated .