W912JF-17-R-0002-0003_Solicitation_Amendment_Conforming_Copy.pdf
PDF 581 KB Posted
- Solicitation number
- W912JF-17-R-0002
About this file
Conforming Copy of Solicitation of Amendment #3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912JF-17-R-0002-0003_Solicitation_Amendment.pdf | ||
| Addendum_2_-_08_41_13.pdf | ||
| Addendum_2_MILCON_SCIF.docx | DOCX document | |
| Addendum_2_-_12_22_00.pdf | ||
| Addendum_2_-_10_22_19.pdf | ||
| Questions_and_Answers_May_4_2017.xlsx | XLSX spreadsheet | |
| Addendum_2_-_08_33_23.pdf | ||
| Addendum_2_-_14_24_00.pdf | ||
| Addendum__MILCON_SCIF.docx | DOCX document | |
| Amendment_2_-_May_4_2017.pdf | ||
| Addendum_2_-_32_31_13.pdf | ||
| Addendum_2_-_10_51_55.pdf | ||
| Addendum_2_Electrical_Lighting_Plan_EL101.pdf | ||
| Addendum_2_Structural_Sheet_S102.pdf | ||
| Addendum_2_-_07_60_00.pdf | ||
| W912JF-17-R-0002-0001_Solicitation_Amendment.pdf | ||
| Addendum_1_MILCON_SCIF.docx | DOCX document | |
| SCIF_Site_visit_sign_in_sheet.pdf | ||
| EXHIBIT_A_-_Past_Performance_Relevancy_Questionnaire.doc | DOC document | |
| EXHIBIT_C_Past_Performance.doc | DOC document | |
| W912JF-17-R-0002_Solicitation.pdf | ||
| EXHIBIT_B_Subcontractor_Consent_Form.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912JF-17-R-0002-0003
F6Q6CE6146AW02
Distributed Communications Ground System (DGS), Remote Piloted Aircraft (RPA), Targeting Intelligence Production Squadron (IS), Sensitive Compartmentalized Information Facility (SCIF) Project Number: HKRZ129076(A)
This procurement is being solicited as a 100% Small Business Set Aside. The Size Standard under NAICS 236220 is $36.5M average annual revenue for the past three years. Project magnitude is betw een $10M and $25M. Persons intending on submitting a proposal should attend the Pre-Proposal Conference on April 13, 2017 at 9:00 am Central Time. See Section 00100 for specif ic registration information and details. In accordance w ith FAR Clause 52.228-1, Bid Guarantee, a bid bond is required w ith the proposal. The solicitation and all information related to the subject project w ill be posted at w w w .fbo.gov .
EDWARD L. PORTER 501-212--4401
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
28-Mar-2017
(RFP)
(IFB)
X
CALL:
NDAA Construct DGS RPA IS SCIF
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________16 May 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USP&FO FOR ARKANSAS
ATTN:EDWARD PORTER
DPFO-PC
NORTH LITTLE ROCK AR 72199-9600
W912JF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
HKRZ129076
8. ADDRESS OFFER TO (If Other Than Item 7)
501-212-4419FAX:TEL: 501-212-4401 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912JF-17-R-0002
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Construct SCIF Facility
FFP
Project Number: HKRZ129076(A) Contractor to provide all construction, equipment, labor, tools, materials and transportation to construct a new, 40,000 SF, Consolidated Mission Facility at the Fort Smith Municipal Airport in Fort Smith, Arkansas. The new facility will combine the operational missions of the Remote Piloted Aircraft Operations Center (RPA), Distributed Communications Ground System (DGS), and Targeting Intelligence Production Squadron (IS) the consolidated 3 missions will operate in a Sensitive Compartmentalized Information Facility (SCIF). The facility will be utilized for both operational missions and training activities for all three operations.
The facility has been designed to Department of Defense (DoD), Air Force, and base design standards. The project consists of, but is not limited to, site work, carpentry, electrical, mechanical, HVAC, plumbing, masonry, roofing, painting, and concrete work., in accordance with project specifications and plans.
FOB: Destination
PURCHASE REQUEST NUMBER: F6Q6CE6146AW02
SIGNAL CODE: A
NET AMT
0002 1 Job OPTION Demountable Partition
FFP
Replace Hard Walls with Demountable Partition. Ref Section 01 11 00 Summary of Work Section 1.6 additive bid items.
FOB: Destination
0003 1 Job OPTION W2 Windows
FFP
W2 Windows on South Side of Building. Ref Section 01 11 00 Summary of Work Section 1.6 additive bid items.
0004 1 Job OPTION Cell Phone Cubbies
FFP
Description: Power Cell Phone Cubbies. Ref Section 01 11 00 Summary of Work Section 1.6 additive bid items.
0005 1 Job OPTION Install Pervious Concrete
FFP
Fire Truck Access Lanes, Sidewalks, and Mechanical Yard Improvements
0006 1 Job OPTION Folding Partitions
FFP
Description: Replace Hard Walls with Folding Partitions. Ref Section 01 11 00 Summary of Work Section 1.6 additive bid items.
0007 1 Job OPTION Concrete Entry * See Note Below*
FFP
**Disregard** Do Not Bid
NOTES
SECTION 00010
SECTION 00010 Solicitation Contract Form
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - PRICING SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
SECTION 10000 - GENERAL REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project No. HKRZ129076 dated March 25, 2016 ATTACHMENT 2- SOLICITATION QUESTIONS AND ANSWERS DOCUMENT to be inserted at award
EXHIBIT A- Performance Relevancy Questionnaire EXHIBIT B- Subcontractor Information and ConsentForm EXHIBIT C- Reference Questionnaire package
SECTION 00010 NOTES
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
4. Line items 0002 through 0007 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section 00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within 120 days.
5. Submit pricing for base SCIF Facility on CLIN 0001 (page 3). Submit pricing for each option (CLINs 0002- 0007) on their respective spaces. (pages 3-6).
6. Complete the Itemized Bid Schedule below to aid the Government's evaluation of pricing. In the event of a discrepancy in prices between the CLINs and the Itemized Bid Schedule, the individual CLIN pricng shall prevail.
Itemized Bid Schedule
Project Description
NDAA Construct DGS, RPA, IS Arkansas Air National Guard
Location Fort Smith Arkansas
Project Number HKRZ129076
Item No REFERENCE Item Description Est. Qty. Units Total Price
1 DIV 01 Specs General Requirements 1 LS
2 DIV 01 Specs Commissioning 1 LS
3 Drawings and Spec Substructure to include foundations, column footings, slab on grade, Elevator Pit, raised slabs, and concrete and earthwork required to perform these tasks.
1 LS
4 Drawings and Spec Superstructure to include Structural Steel, Floor Decks and slabs, Mezzanine, Roof Deck, Fire Proofing, and Trusses
1 LS
5 Drawings and Spec Interior and Exterior Stairs to include metal pan stairs, concrete, exterior metal stairs, and Mezzanine stairs.
1 LS
6 Drawings and Spec Exterior Closure to include Exterior walls, Brick veneer, metal wall panels, metal studs, insulation and vapor barrier, 1 LS
7 Drawings and Spec Exterior entrances and openings to include Windows, doors and hardware, storefront, louvers and screens.
1 LS
8 Drawings and Spec Roofing to include Standing Seam Metal Roof, Insulation and Fill, Flashing, Trim, Soffit, Gutters and Downspouts.
1 LS
9 DIV 09 Specs Raised Access Flooring 1 LS
10 Drawings and Spec Interior Construction to include interior partitions, doors, door hardware, casework, Finishes, Specialties, Furnishings
1 LS
10 DIV 14 Elevator 1 LS
11 DIV 21 Fire Suppression 1 LS
12 DIV 21 Clean Agent Fire Suppression 1 LS
13 DIV 22 Plumbing 1 LS
14 DIV 23 HVAC 1 LS
15 DIV 26 Electrical 1 LS
16 DIV 27 Communications 1 LS
17 DIV 28 Safety and Security 1 LS
18 DIV 31 Earthwork 1 LS
19 DIV 32 Exterior Improvements 1 LS
20 DIV 33 SITE Utilities Electrical including demolition
1 LS
21 DIV 33 Site Utilities Water, Sewer, Gas, Storm Drain including demolition
1 LS
22 DIV 33 Site Telecommunications Outside Plant including demolition
1 LS
Total (Base)
OPTION BID ITEMS Est. Qty. Units Total Price
Option‐001 Replace Hard Walls with Demountable Partitions Wall Type 7A
1 LS
Option‐002 Add W2 Windows 1 LS
Option‐003 Add Power Circuits to Entrance Cubbies 1 LS
Option‐004 Install Pervious Concrete in Fire Truck Access Lane, Sidewalks, and Mechanical Yard
1 LS
Option‐005 Replace hard walls with folding partitions in 1st floor conference rooms.
1 LS
Total (Options)
End of Section 00010
SYNOPSIS OF PROJECT
Synopsis of Project: 188th Wing, Fort Smith AR. HKRZ129076 MILCON SCIF The project includes new construction of a Consolidated Mission Facility for the 188th Wing of the Arkansas Air National Guard. The new facility will combine the operational missions of the Remote Piloted Aircraft Operations Center (RPA), Distributed Communications Ground System (DGS), and Targeting Intelligence Production Squadron (IS) the consolidated 3 missions will operate in a Sensitive Compartmentalized Information Facility (SCIF). The facility will be utilized for both operational missions and training activities for all three operations. The new facility will include site work, utilities, and construction of a two story, 40,000 sf. building. The facility will be designed to Department of Defense (DoD), Air Force, and base design standards. The construction activities are required to meet
Federal Aviation Administration criteria for work around and near an active airport. The multiple spaces of the building on the first floor will include a controlled access security entrance, operations room, closed offices, open area cubicles, server room and conference rooms for classified information. Interior stairs and an elevator are included for interior circulation along with restrooms and communication closets. The second floor spaces include a break room, closed offices, open area cubicles, training rooms and conference rooms. Interior stairs and an elevator are included for interior circulation along with restrooms and communication closets. Exterior stairs are provided for emergency egress from the second floor. Portions of the finished interior spaces will utilize a raised access floor which will provide space for communications and data cabling. Air handling units are utilized to deliver air through the raised accessUnderfloor Air Distribution System (UFAD). Metal studs and dry wall are the primary construction of the interior walls. All spaces are required to meet SCIF criteria for Sound Transmission Class (STC) and Noise Isolation Class (NIC). The utility spaces for mechanical, plumbing, and electrical rooms are located on the east end of the building with exterior entrances only. The project site is located on the Air National Guard Base located at the Fort Smith Municipal Airport in Fort Smith Arkansas.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government 0007 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 28-JUN-2019 1 F6Q6CE 188TH CIVIL ENGINEERING
4850 LEIGH AVENUE
FORT SMITH AR 72903-6096
479-573-5309
F6Q6CE
0002 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
0003 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
0004 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
0005 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
0006 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
0007 28-JUN-2019 1 (SAME AS PREVIOUS LOCATION)
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS AND CONDITIONS
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal W912JF-17-R-0002 for Project No. HKRZ129076 at Fort Smith, Arkansas. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1. A pre-proposal conference will be conducted on April 13, 2017 at 9:00 am Central for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at 188th Civil Engineering, Building #450 at the Air National Guard Facilities, Fort Smith, Arkansas.
Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Ms Laura English at laura.j.english.civ@mail.mil
Visitor’s Name Firm Representing (Prime or Sub)
2.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site. Any person trying to enter the base with an outstanding warrant for arrest will be held and turned over to local law enforcement authorities.
2.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to the Federal Business Opportunities (FBO) website.. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the
A-E or Engineering personnel directly. Doing so will only delay the response to your question.
Subject Line: Reference No. W912JF-17-R-0002 Email: laura.j.english.civ@mail.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION:
Date of Proposal Inquiry:
From: ______________________________
Company Name: ___________________________
Phone Number: ____________________________
Email address: _____________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (www.FedBizOpps.gov or www.fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:
1) Marketing Partner Identification Number (MPIN)
2) DUNS Number and CAGE Code
3) Telephone Number
4) Email address
Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/?s=getstart. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)
3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to:
www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at www.fbo.gov.
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at: Purchasing and Contracting, Building 7100, Camp Joseph T. Robinson, North Little Rock, Arkansas..
5.2. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.3. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined above in paragraph 2.4 for entry. Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
6. WAGE DETERMINATION
6.1. The Construction Wage Rate Requirements formerly known as Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination at time of issuance of solicitation is AR170134 Rev 0, dated 01/06/2017, for Sebastian County, Arkansas.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes.
If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404- 5(c)(4) will apply.
6.2. Applicable wage rates can be found at http://wdol.gov/dba.aspx.
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hook up fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors shall take this into consideration when computing their offers. (FAR Clause 52.236-14, Availability and Use of Utility Services.) OR It has been determined that all reasonable amounts of (insert), where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)
11. EXCEPTIONS
If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
12. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
13. BRAND NAME REQUIREMENTS
IAW Plan Sheet T-101C, Alarm System to be Advantor Systems Inc.
IAW Section 23 of the specifications, Direct Digital Control (DDC) for HVAC System will Siemens Building Technologies Apogee system.
IAW ANG ETL 1-1-1, Fire Alarm Panel to be Monaco.
IAW Section 8 71 00 and ANG ETL 1-1-1 All locks shall be Sargent Locks.
SECTION 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. PROPOSAL PREPARATION INSTRUCTIONS
1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition.
1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
2. PROPOSAL CONTENT
2.1. Prospective offerors shall submit the following volumes in two separate packages:
2.1.1. Submit Volume 1, Price proposal, pro forma documents, in original and (3) three hard copies, in accordance with instructions contained herein.
Volume 2, Part 1 – Technical Capability Proposal, in original, (3) hard copies and one CD.
Subfactor 1 – Experience and Capability (limit resumes to 2 pages each) Subfactor 2- Construction Schedule and Commissioning Approach/timeline (schedule no page limit;
narrative – no more than 5 pages) Subfactor 3 – Safety Activities Subfactor 4 – Quality Control Subfactor 5 – LEED ( limit resumes to 2 pages each)
Volume 2, Part 2 – Past/Present Performance Information
2.1.2. Although the assessment of Past Performance as a specific evaluation factor is separate and distinct from the Determination of Responsibility required by FAR Part 9, Past Performance information obtained herein will be used during the Government’s responsibility determination. In addition contractors shall submit a single copy of the following information in a sealed envelope with their name on the outside. This information is sought pursuant to FAR 9.105-1 and will be opened and utilized only if the contractor is selected for award.
Information will be used in determining the contractor responsible in accordance with FAR Part 9. If an award is not being offered the envelope will be filed unopened with the original proposal.
2.1.3. Documentation of adequate financial resources: Provide letters of reference from financial institution(s) concerning credit worthiness and from bonding companies indicating capability to bond to, at a minimum, the price proposed.
2.1.4. Offerors are cautioned to carefully review the proposal requirements for these Volumes and ensure a complete proposal is submitted.
2.2. PROPOSAL DUE DATE SCHEDULE
2.2.1. The entire proposal (Volumes 1 and 2 and the CD copy (Vol 2 only) are due by the date and time set for the receipt of proposals shown in Block 13 of the SF 1442. Past performance references should provide questionnaire responses to the Contracting Officer not later than the closing date.
2.3. After compiling all required information, submit original and specified number of copies to the following office:
USP&FO for Arkansas Purchasing and Contracting Office Attn: Eddie Porter, Contracting Officer Box 003, Building 7100 Camp Joseph T. Robinson North Little rock, AR 72199-9600
Mark the front of the envelope/box with the following: “PROPOSAL No. W912JF-17-R-0002, DO NOT OPEN--- Competitive Acquisition”.
2.4. PROPOSAL FORMAT
2.4.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.
2.4.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
2.4.3. Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.
2.4.4. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10 min.). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided. Where page limits exist a page is defined as one single side of a page. Double sided pages count as 2 pages. Unless otherwise stated, tabs, indexes and dividers do not count in the page count.
2.4.5. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.
2.4.6. Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.
2.4.7. Electronic Copy: Provide one (1) electronic copy of all of the Volume 2 proposal information. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat. (“Read Only” files are acceptable).
2.4.10. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.
2.5. PROPOSAL VOLUME CONTENTS: Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award.
2.5.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS
2.5.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation. The Government is not, and does not intend on, requesting certified cost or pricing data. Offerors may be required during the evaluation process to provided sufficient price/cost information that will enable the Government to perform a meaningful evaluation.
2.5.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, and email addresses. Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.
2.5.1.3. Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442.
An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR
4.102. One copy of the SF 1442 is required to have an original signature.
2.5.1.4. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered.
2.5.1.5. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. Return the entire Section 00600 with your proposal. All other required representations and certifications are to be completed on line in the System for Award Management (SAM) www.sam.gov.
2.5.1.6. All potential offerors are required to register in the System for Award Management. See FAR Provision 52.204-7 System for Award Management.
2.5.1.7. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
2.5.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL
2.5.2.1. Volume 2 Part 1 is comprised of five (5) subfactors. Subfactor 1 Experience and Capability; Subfactor 2 Safety Activities; Subfactor 3 Construction Schedule; Subfactor 4 Quality Control and Subfactor 5, LEED® Experience and Capability United States Green Building Council (USGBC) LEED® standards
2.5.2.1.1. Government acknowledges that the technical proposal will involve discussion of some of the same projects/contracts discussed in the Past Performance volume. While Past Performance examines how an offeror performed in the past, so as to determine the probability of success on future projects, this subfactor examines the offeror’s experience with complex multidiscipline project management and execution and how the offeror demonstrates an understanding of the contract’s requirements taking this experience into consideration. The Government intends to use Exhibit A Part 1 information in the evaluation of experience for Subfactor 1. A reiteration of the information provided in Exhibit A is neither required nor desired. Offeror should reference this information by providing a short summation of their relevant experience to meet the submission requirements of this subfactor
2.5.2.2. Subfactor 1 Experience and Capability. Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity. Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Site Superintendent(s), Quality Assurance Manager (on site), Site engineering personnel. Refer to Specification Section 01000, paragraph 36, for the minimum qualification requirements for key personnel. Discuss any previous projects that are similar to this project in terms of scope, size and complexity. Specifically discuss their experience in the construction of a secure facility. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered.
2.5.2.3. Subfactor 2: Construction Schedule and commissioning approach/timeline is obtained for the purposes of evaluating an offerors understanding of the requirements of the schedule and commissioning. The Schedule itself is not subject to page limits; however any provided narrative to the schedule submission is limited to 5 pages , excluding tabs, and indexes.
2.5.2.3.1. Provide Construction Schedules using a critical path a (Critical Path Method (CPM)) scheduling approach considering a Notice to Proceed date of June 1, 2017 for the schedule. The Construction Schedule is an integrated and networked multi-layered schedule of program/project tasks. It identifies project events, accomplishment, and criteria and the expected dates of each. These dates are based on the calendar dates provided as the starting point and the logical flow of dates provided by calculating the addition of duration of all tasks using typical schedule networking tools. Each major task will be directly traceable to the requirements of the project. The NTP date for the schedule is for the purpose of evaluation only.
2.5.2.4. Subfactor 3 Safety Activities. The proposal narrative concerning proposed safety program, includes an adequate discussion of:
Training and documentation.
Proposal demonstrates familiarity with, and/ or plans to adhere to, OSHA standards, USACE EM 385-1-1 (Safety Manual) and standard State OSHA safety requirements, if applicable. (Note: The proposed Safety Plan (if provided) will not be evaluated).
There is an adequate discussion of steps taken to promote safety during construction during the past three
(3) years.
2.5.2.5. Subfactor 4: Quality Control. The proposal narrative demonstrates that the quality control staff, with lines of authority, is adequate to meet the contract’s requirements. The proposed Quality Control answers should provide a detailed explanation of how quality issues are dealt with on various types of construction projects and as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. (Note: A Quality Control Plan is not required with this proposal).
2.5.2.6. Subfactor 5: Discuss company experience with building to United States Green Building Council (USGBC) LEED® standards. Indicate any previous projects that achieved USGBC LEED® certification, any level of recognition. Additionally, indicate the key construction personnel and demonstrate they have experience and required qualifications in assigned roles with building to USGBC LEED® standards. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered.
2.5.3. VOLUME 2, PART 2 OFFEROR PAST/PRESENT PERFORMANCE INFORMATION
2.5.3.1. Volume 2 Part 2 is obtained for the purpose of evaluating Past/Present Performance. Past/Present Performance includes current/on-going performance that is complete to 70% or greater. Volume 2 includes the offeror’s Performance Relevancy Questionnaire, Exhibit A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past/present performance the offeror includes. Offerors are cautioned to complete all the questions on the Exhibit A Parts 1 and Part 2. Detailed instructions are included in Exhibit A.
2.5.3.2. Offerors shall use the Reference Package, Exhibit C, to obtain references from past and present clients.
2.5.3.3. Past/Present Performance, which includes current on-going (present) performance that is complete to 70% or greater will be evaluated using the evaluation criteria set forth in Section 00120 of the solicitation. If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit As and obtain Exhibit C references. The Government may contact these references and may consider this information as well as information obtained from any other sources when evaluating the offeror's past/present performance.
2.5.3.4. Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1. Prepare not more than 5 of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted.
2.5.3.5. Use the Exhibit A format to provide information that demonstrates a history of performance on contracts that are similar in scope, complexity, and cost magnitude to this project’s plans and specifications. Explain what aspects of the contract you find relevant to the proposed effort and identify how each contract ranks, in terms of relevancy, with respect to the other contracts addressed in proposal.
2.5.3.6. Offerors should consider the currency and relevancy of the past/present performance information to be considered, the performance must have been completed during the past five (5) years. The period begins five (5) years prior to the solicitation release date and includes current performance. Performance that is more current may have greater impact than older performance.
2.5.3.7. In determining relevancy to the solicitation requirement, offerors should consider the similarity of construction methods employed, size, scope, cost magnitude, location, client type (e.g. federal government) and complexity of work performed to those required for the proposed effort. Location should also be considered.
2.5.3.8. Offerors are encouraged to include with their proposal information any problems encountered on the identified contracts and the offeror's correction actions.
2.5.3.9. Offerors lacking relevant present/past performance experience may submit information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement if such information is relevant to this acquisition. Such information shall, as a minimum, include:
Name(s) of Predecessor Company/Subcontractor and/or Key Personnel Complete Address Telephone, Fax Number and email address Brief synopsis of the experience- A resume may be submitted for "Key Personnel" Describe relevancy to this project
2.5.3.10 Provide three (3) references, for each Predecessor Company, Subcontractor or Key Personnel. Clearly identify the contractor/individual for whom the reference information concerns.
2.5.3.10.1. Each proposed subcontractor/Teaming Partner must also complete an Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form”, to be considered.
2.5.3.11. Past Performance References – REQUIRED – A “Final” Performance Evaluation (Construction) (also referred to as CCASS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. OR Offerors shall prepare and submit to prior client(s) of all the projects listed on your Exhibit A submission a Reference Package (Exhibit C) (Detailed instructions are included in Exhibit C Package). This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance, and the Past Performance Questionnaire for use in evaluating Past Performance. Inform references that completed Performance Questionnaire should be returned to the Contracting Officer via email at: edward.l.porter.civ@mail.mil to arrive later than the closing date for receipt of proposals. Offeror must not review the Past Performance Questionnaire prior to submission. They are to be submitted by the client/evaluator directly to the Contracting Officer. Offeror's should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner.
2.5.3.12. In assessing past performance, the Government may also consider the past/present performance of the offeror’s key personnel, Project Manager, Quality Control Manager and Site Superintendent, as it relates to previous projects. In the event the intended key personnel for this solicitation’s project do not have demonstrated past performance in the project(s) submitted in the Exhibit A’s, the Government reserves to obtain reference information additional information is required.
2.5.3.12.1. Each key person without prior past performance history demonstrated on the submitted Exhibit A shall provide a summary of experience or a resume. In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” or Letter of Intent, is also required or the information will not be considered. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.
2.5.3.13. Offerors are advised that the Government may use all data provided by the offeror in this volume and data obtained from any other sources, to include, but not limited to, data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate.