From: Brun, Darin L SMSgt USAF 184 IW (USA) To: Brunkow, Jarrod A Capt USAF NG KSANG (USA) Cc: Phillips, William M (Bill) CIV NG KSARNG (USA); Weber, Joseph W CIV USARMY (USA) Subject: FW: [Non-DoD Source] BID RFI W912JC-19-B-4000 Date: Friday, May 17, 2019 11:01:55 AM
From: Mike Maas <Mike.Maas@sennecompany.com> Sent: Friday, May 17, 2019 10:18 AM To: Brun, Darin L SMSgt USAF 184 IW (USA) <darin.l.brun.mil@mail.mil>; Phillips, William M (Bill) CIV NG KSARNG (USA) <william.m.phillips44.civ@mail.mil> Subject: BID RFI W912JC-19-B-4000 (senne)
5/17/2019
From: Mike Maas, Senne & Company
Address: 2001 NW Highway 24, Topeka KS 66618
Phone 785-235-1015 Fax 785-235-0256
Email mike.maas@sennecompany.com < Caution-mailto:mike.maas@sennecompany.com >
Bid Inquiry:
1. The Trane model number for the 3rd floor HVAC unit appears to be incomplete. Please provide a complete model number required.
Answer: Trane model number is UCCA08CO
2. Is Trane the only acceptable manufacturer or are equivalents acceptable?
Answer: Trane was specified as the design solution, any alternates to this specification must meet or exceed the capacity, size, performance and warranty ratings of this unit.
3. Are the existing floor markings in the corridor required to be repainted upon completion of the epoxy?
Answer: Yes, contractor shall repaint the floor markings as well.
4. Is the existing rubber base at the corridor to be removed and replaced with new rubber base?
Answer: Yes, the contractor shall replace all affected rubber base with new.
5. Is the inside of the new wall at the Sheetmetal Shop tool room to be covered with sheetmetal or other sheathing?
Answer: Yes, painted sheet metal is acceptable to cover framing members for this door.
6. Are any new exposed conduits to be painted to match the existing wall?
Answer: Yes, all exposed conduits will be painted to match wall color.
Thanks, Mike Maas,LEED AP Senior Project Manager ***please note all progress billings should be sent to billing@sennecompany.com mailto:darin.l.brun.mil@mail.mil mailto:jarrod.a.brunkow.mil@mail.mil mailto:william.m.phillips44.civ@mail.mil mailto:joseph.w.weber6.civ@mail.mil mailto:mike.maas@sennecompany.com mailto:billing@sennecompany.com