ALABAMA AIR NATIONAL GUARD

117TH AIR REFUELING WING (AMC)

5401 EAST LAKE BLVD BIRMINGHAM

AL 35217-3545

25 July 2018

Request for Information Questions and Answers For project BRKR 142605 Repair HVAC Base wide

Question:

Bldg. 175 Notes call for AHU-1, 2, and 5 to have duct furnaces. These units are already gas furnaces. Do we need to provide an additional duct furnace. Drawing M 1.7.

Response: Gas Furnaces add on to air handlers are required at units larger than 5 ton (AHU 1, 2, & 5)

Bldg. 190 Split system AC-1 calls for hot gas reheat for dehumidification. This is the only hot gas reheat unit like this on the project. Does hot gas reheat need to be provided?

Response: These units remain as specified

Bldg. 550 Request KLIMOR added to the approved equals. Drawing M1.9

Response: See revised drawings. KLIMOR has been added as an approved manufacturer.

Bldg. 142 Request KLIMOR added to the approved equals. Drawing M1.6

Response: See revised drawings. KLIMOR has been added as an approved manufacturer.

Bldg. 135 Unit notes require Solar Ready on the 4 split systems. Is this necessary.

Drawing M1.4

Response: See revised drawings. Solar ready requirement has been removed.

Question:

Chiller notes- Notes on drawings M1.3, M1.6, M1.9, M1.10, and M1.13 call for microchannel coils on chillers. Is microchannel required?

Response: See revised drawings. Micro Channel Requirement has been removed.

End of Memo

Question:
Response: Gas Furnaces add on to air handlers are required at units larger than 5 ton (AHU 1, 2, & 5)
Response: These units remain as specified
Response: See revised drawings. KLIMOR has been added as an approved manufacturer.
Response: See revised drawings. KLIMOR has been added as an approved manufacturer.
Response: See revised drawings. Solar ready requirement has been removed.
Response: See revised drawings. Micro Channel Requirement has been removed.

End of Memo