BRKR_142605_100__Drawings.pdf
PDF 40 MB Posted
- Attached to
- Repair HVAC Base-wide
- Solicitation number
- W912JA-18-B-5002
About this file
Drawings
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 11:43:33 AM
T1.0
Ti tle
S he et a nd In de x to D ra w in gs
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
1 89
Sheet Schedule
Sheet Count Sheet No. Sheet Name
44 M8.1 Sub Metering Plan - Building 139 45 M9.1 First Floor HVAC Demolition Plan - Building 141 46 M9.2 Second Floor HVAC Demolition Plan - Building 141 47 M9.3 First Floor HVAC Demolition P lan - Building 142 48 M9.4 Revised First Floor HVAC Plan - Building 141 49 M9.5 Revised Second Floor HVAC Plan - Building 141 50 M9.6 Revised First Floor HVAC Plan - Building 142 51 M10.1 Sub Metering Plan - Building 148 52 M11.1 HVAC Demolition Plan - Building 149 53 M11.2 Revised HVAC Plan - Building 149 54 M12.1 Sub Metering Plan - Building 151 55 M13.1 HVAC Demolition Plan - Building 175 56 M13.2 Revised HVAC Plan - Building 175 57 M14.1 HVAC Demolition Plan - Building 190 58 M14.2 Revised HVAC Plan - Building 190 59 M15.1 HVAC Demolition Plan - Part "A" Building 550 - Base Bid & Option #6 60 M15.2 HVAC Demolition Plan - Part "B" Building 550 - Base Bid & Option #6 61 M15.3 Revised HVAC Plan - Part "A" Buidling 550 - Base Bid 62 M15.4 Revised HVAC Plan - Part "B" Building 550 - Base Bid 63 M15.5 Hydronic Piping Plan - Building 550 - Base Bid 64 M15.6 Revised HVAC Plan Part "A" Building 550 - Bid Option #6 65 M15.7 Revised HVAC Plan Part "B" Building 550 - Bid Option #6 66 M15.8 Hydronic Piping Plan- Part "A" Building 550 - Bid Option #6 67 M15.9 Hydronic Piping Plan- Part "A" Building 550 - Bid Option #6 68 M16.1 Sub Metering Plan - Building 620 69 M17.1 HVAC Demolition Plan - Building 700/701 70 M17.2 Revised HVAC Plan - Buidling 700/701 71 M18.1 HVAC Demolition Plan - Building 710 72 M18.2 Revised HVAC Plan - Building 710 73 M19.1 HVAC Plans - Building 750 06 Plumbing 74 P1.1 Revised Condesnate Plumbing Plan - Building 141 75 P2.1 Revised Gas & Condensate Plan - Building 550 07 Electrical 76 E1.1 Symbols and Notes 77 E2.1 Building 40 Electrical Demolition Plans and Power Plans 78 E3.1 Building 125 Demolition and Power Plans 79 E4.1 Building 135 Electrical Demolition Plan 80 E4.2 Building 135 Power Plan 81 E5.1 Building 141 First and Second Floor Electrical Demolition Plans 82 E5.2 Building 141 First and Second Floor Power Plans 83 E6.1 Building 142 Electrical Demolition Plan and Power Plan 84 E7.1 Building 149 Electrical Demolition Plan and Power Plan 85 E8.1 Building 175 Electrical Demolition Plan and Power Plan 86 E9.1 Building 190 Electrical Demolition Plan and Power Plan 87 E10.1 Building 550 Electrical Demolition Plan 88 E10.2 Building 550 Power Plan 89 E11.1 Building 701, 710, & 750 Power Plans
Sheet Schedule
Sheet Count Sheet No. Sheet Name
21 M1.12 HVAC Schedules Building 550 22 M1.13 HVAC Schedules Building 700/701 23 M1.14 HVAC Schedules Building 710 and 750 24 M2.1 HVAC Details 25 M2.2 HVAC Details 26 M2.3 HVAC Details 27 M2.4 HVAC Details 28 M2.5 HVAC Details 29 M2.6 HVAC Details 30 M2.7 HVAC Details 31 M2.8 HVAC Details 32 M2.9 HVAC Details 33 M2.10 HVAC Details 34 M2.11 HVAC Details 35 M2.12 HVAC Details 36 M3.1 Sub Metering Plan - Building 30 37 M4.1 HVAC Demolition Plans - Building 40 38 M4.2 Revised HVAC Plans - Building 40 39 M5.1 HVAC Demoltion Plan - Building 125 40 M5.2 Revised HVAC Plan - Building 125 41 M6.1 HVAC Demolition Plan - Building 135 42 M6.2 Revised HVAC Plan - Building 135 43 M7.1 Sub Metering Plan - Building 138
Sheet Schedule
Sheet Count Sheet No. Sheet Name
00 Title 1 T1.0 Title Sheet and Index to Drawings 04 Architectural 2 A1.0 Site Reference Plan 3 A1.1 Building 550 Demolition Plan 4 A2.1 Building 550 New Floor Plan 5 A8.1 Building 141 - Ground Floor - Reflected Ceiling Demolition Plan 6 A8.2 Building 141 New Reflected Ceiling Plan 7 A8.3 Building 141 - Second Floor - Demolition Reflected Ceiling Plan 8 A8.4 Building 141 - Second Floor - New Reflected Ceiling Plan 9 A8.5 Building 142 Reflected Ceiling Plan/Building 175 Louver Details 05 Mechanical 10 M1.1 HVAC Legend and Notes 11 M1.2 HVAC Schedules Building 40 12 M1.3 HVAC Schedules Building 125 13 M1.4 HVAC Schedules Building 135 14 M1.5 HVAC Schedules Building 141 15 M1.6 HVAC Schedules Building 142 and 149 16 M1.7 HVAC Schedules Building 175 17 M1.8 HVAC Schedules Building 190 18 M1.9 HVAC Schedules Building 190 19 M1.10 HVAC Schedules Building 550 20 M1.11 HVAC Schedules Building 550
Plumbing, Mechanical:
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Using Agent
Repair HVAC Basewide
BRKR 142605
Birmingham IAP (ANG), AL
Architect:
Design Team: Consulting Engineers:
Electrical:
Option #3
Schedule of Bid Options:
Building 550 Evaporative Chiller
Option #2 Building 125 Evaporative Chiller
Option #1 Building 149 Evaporative Chiller
Option #4 Building 190 Evaporative Chiller
Option #5 Building 700 Evaporative Chiller
Option #6 Building 550 Replace Zone Dampers with Variable Air Volume Terminal Units x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
S
R
IP
R A P
B U
IL
D
IN
G
AC
AC
B R A S S
D
IS
K
E L E V A T
IO
N
.0
E
.9
N
.3
STOP
S T O P
CP
E
STO
P
S T O P
PC
E
STOP
S
TO
P
S
TO
P
S
TO
P
STOP
STOP
STOP
S
TO
P
S
TO
P
B L A S T
W A L L
B L A S T
W A L L
B L A S T
W A L L
B L A S T
W A L L
C O
N
TE LO
O
P RO
AD
AIR NATIONAL GUARD BLVD
"A" STREET
"C" STREET
FAA FACILITY
BX SERVICE STATION
AN
G
C R
ED
IT
U N
IO
N
M
AIN
G
ATE
C P
N O
PAR
KING
N O
PAR
KING
N O P
AR
K
IN
G
N O P
AR
K
IN
G
N O P
AR
K
IN
G
N O P
AR
K
IN
G
N O P
AR
K
IN
G
C O
C O
SS
G P
G P G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P G P
G P
G P
G P
G P
G P
G P
C O
C O
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G P
G
PG
P
A C
C O N C
C O N C R E T E
C O N C R E T E
C O N C R E T E
CONCRETE
C O N C
RETE
C O N C R E T E
RAMP
C O N C
C O N C
C O N C
C O N C
C O N C
S D
S D
E A S T L A K E
B L V D
E A S T L A K E
B L V D
E A S
TLA
K E B
LV
D
EASTLAKE BLVD.
EASTLAKE BLVD.
EASTLAKE BLVD.EASTLAKE BLVD.
EASTLAKE BLVD.
EA
STLAKE B
LVD.
EA
STLAKE B
LVD.
S M
IT
H
C
IR
C L E
S M
IT
H
C
IR
C L E
"B" STREET
B
S T R E E T
"A" STREET
"A" STREET
F F
.6
B
UILDING 41
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING 610
B U
IL
D
IN
G
M A
IN
G A T E
S E R V
IC
E
S T A T
IO
N
C O N T E
L O O P
R O A D
B A C H U S
D R
IV
E
AIR NATIONAL GUARD BLVD.
B A C H U S
D R
IV
E
B U
IL
D
IN
G
B U
ILD
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
B U
IL
D
IN
G
G A Z E B O
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T
A S P H A L T A S P H A L T
700/ 701 710
Legend:
Denotes A Structure Included in the Proposed Scope of Work a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
8/16/2017 3:49:46 PM
A1.0
Si te
R ef er en ce P la n
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
2 89
1" = 160'-0" A1.0
Site R eference Plan
Remove Concrete Sidewalk As Required to Install New HVAC Systems - Remove Sidewalks from Existing Control to Next Existing Control Joint (Typical)
A1.1
Remove Concrete Sidewalk As Required to Install New HVAC Systems - Remove Sidewalks from Existing Control to Next Existing Control Joint (Typical)
Remove Existing Landscaping Including All Ground Cover, Shrubbery, and Trees
Existing Concrete Sidewalk to Be Removed as Required to Install New HVAC Systems
Legend:
Existing Concrete Sidewalks to Remain and be Protected
Remove Existing Sod as Required to Install New HVAC Systems
Existing Trees & Shrubbery to Be Removed
Existing Shrubbery, Ground Cover, and Trees to be Remoeved
Remove Mulch, Ground Cover, Etc and Soil to a Depth of +/-4" Below Current Grade
Treat In-Situ Soil to Prevent Propugation of Weeds Through New Landscape Fabric
Existing Soil to Remain
0'
4" a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:13:24 AM
A1.1
Bu ild in g
D em ol iti on Pl an R ep ai r H
VA
C B as ew id e
7t h Ai r R ef ue lin g W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
3 89
3/32" = 1'-0"A1.1 1 Building 550 Demolition Plan
1/2" = 1'-0"A1.1 2 Landscaping Demolition Sectoin
New Chiller (See Mechanical)
New Bollards (Base Bid)
New Bollards (Base Bid)
A2.1
**** BID OPTION*****
Note:
If alternate for replacement of zone dampers with VAV boxes is awarded, Contractor will be required to remove and replace existing ceiling tiles as required to install new VAV boxes and hydronic piping - refer to mechanical plans. Where ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile. Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Where required to install new HVAC systems, Contractor shall remove and replace ceiling grid. Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid if grid removal is required in order to successfully install new HVAC systems above the existing ceiling grid.
New Landscaping Fabric and River Rod Mulch
New Concrete Sidewalks (Match Existing/Adjacent Control Joint Locations)
Legend:
Existing Concrete Sidewalks to Remain and be Protected
New Emerald Zoysia Sod
New River Rock Mulch
New Landsaping Fabric
Existing Soil to Remain
0'
4"
Round Concrete Top
NPS 8 STD Weight Steel Pipe Filled with Concrete
2'-0" Diameter Concrete Foundation
Finished Grade
0'
3" 4'
0"
0'
1" 3'
0"
0' - 8" 0' - 8" 0' - 8"
All Bollards to Receive Paint Finish - See Paint Specifications a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:13:40 AM
A2.1
Bu ild in g
N ew
F lo or Pl an R ep ai r H
VA
C B as ew id e
7t h Ai r R ef ue lin g W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
4 89
3/32" = 1'-0"A2.1 1 Building 550 New Plan
1/2" = 1'-0"A2.1
Typical River Rock Mulch Bed Detail
3/4" = 1'-0"A2.1 3 Bollard Detail
SD
SPR
SPR SPR
SPR
OCC
OCC
OCC
OCC
CD
CD CD CD
CD
CD
CD
CDCD
CD
CDCD
CD
EM
EM
Exit
HVAC Unit
OCC
SPR
SPR
OCC
OCC
OCC
SPR
OCC
Ex it
PP
EM
Exit
EM
SD SD
EM
SD
EM
SD SD
EM
Exit
EM
Ex it
SD
EM
A8.2
Sim
Ex it
SD
Heavy Curtain Mounted to Ceiling Grid to Remain
OCC
OCC OCC
SPRSPRSPRSPRSPRSPR
SPR SPR SPR SPR SPR SPR
SPR SPR
SPR
SPRSPRSPRSPR
SPR SPR SPR SPR SPR SPR
SPRSPRSPRSPRSPRSPR
SPR
SPR
SPR SPR SPR SPR
SPRSPR
SPR
CD
SPR
OCC SPR
HVAC Duct through Ceiling to Remain
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in These Spaces
No Work in This Space
No Work in These Spaces
No Work in This Space
No Work in This Space
No Work in These Space
HVAC Duct through Ceiling to Remain
HVAC Unit to Be Replaced - See Mechanical
Existing Fire Sprinkler Riser to Remain
No Work in This Space
PA OCC
OCC
SPR SPR
PA
PA
Existing Ceiling to Remain
Areas to Receive New Acoustical Ceiling Tile and Grid
• Reinstall all existing light fixtures, HVAC registers, and ceiling mounted devices into new ceiling unless specifically noted otherwise.
• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.
Legend:
Areas to Receive New Acoustical Ceiling Tile in Existing Grid
• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.
Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.
OCC
Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.
Note:
Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.
Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD
Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD
Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.
SPR
Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.
Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).
PP
Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.
EM
Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA
Areas Of Existing Sheetrock Ceilings to Remain
Areas to Existing Sheetrock Ceilings to be Removed
• Install new framing as required. Reinstall all ceiling mounted devices into new acoustical tile units.
a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:13:47 AM
A8.1
Bu ild in g
- G ro un d
Fl oo r - R ef le ct ed
C ei lin g
D em ol iti on P la n
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
5 89
3/32" = 1'-0"A8.1
Ground Floor Reflected Ceiling Demolition Plan
A8.2
SD
SPR
SPR SPR
SPR
OCC
OCC
OCC
OCC
CD
CD CD CD
CD
CD
CD
CDCD
CD
CDCD
CD
EM
EM
Exit
OCC
SPR No Work in This Space
No Work in This Space
SPR
OCC
OCC
OCC
SPR
OCC
Ex it
PP
EM
A8.2
Sim
SDExit
EM
SD SD
EM
SD
EM
SD SD
EM
Exit
EM
Ex it
SD
EM
Ex it
SD
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in This Space
No Work in These Spaces
No Work in This Space
No Work in These Spaces
Heavy Curtain Mounted to Ceiling Grid to Remain
OCC
OCC OCC
SPRSPRSPRSPRSPRSPR
SPR SPR SPR SPR SPR SPR
SPR SPR
SPR
SPRSPRSPRSPR
SPR SPR SPR SPR SPR SPR
SPRSPRSPRSPRSPRSPR
SPR
SPR
SPR SPR SPR SPR
SPRSPR
SPR
CD
SPR
OCC SPR
HVAC Duct through Ceiling to Remain
No Work in This Space
No Work in This Space
No Work in These Space
HVAC Duct through Ceiling to Remain No Work in This
Space
HVAC Unit to Be Replaced - See Mechanical
Existing Fire Sprinkler Riser to Remain
No Work in This Space
PA OCC
OCC
SPR SPR
PA
PA
Existing Access Hatch to Remain (Paint) Paint Entire Sheetrock Ceiling of this spaace once duct is installed and sheetrock ceiling ceilinh as been patched.
New Acoustical Tile Ceiling - See Specifications New Ceiling Grid Wall Angle
New Metal Stud Framing As Required
Gypsum Wallboard - Provide 3- Coat Painted Finish Corner Bead Existing Ceiling To Remain
Brace New Metal Studs to Structure Above as Required
0'
6"
Existing Ceiling to Remain
Areas to Receive New Acoustical Ceiling Tile and Grid
• Reinstall all existing light fixtures, HVAC registers, and ceiling mounted devices into new ceiling unless specifically noted otherwise.
• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.
Legend:
Areas to Receive New Acoustical Ceiling Tile in Existing Grid
• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.
Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.
OCC
Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.
Note:
Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.
Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD
Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD
Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.
SPR
Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.
Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).
PP
Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.
EM
Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA
Areas Of Existing Sheetrock Ceilings to Remain
Areas to Existing Sheetrock Ceilings to be Removed
• Install new framing as required. Reinstall all ceiling mounted devices into new acoustical tile units.
a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:13:56 AM
A8.2
Bu ild in g
N ew
R ef le ct ed C ei lin g Pl an R ep ai r H
VA
C B as ew id e
7t h Ai r R ef ue lin g W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
6 89
3/32" = 1'-0"A8.2
Ground Floor New Reflected Ceiling Plan
1 1/2" = 1'-0"A8.2 2 Ceiling Transition Detail
No Work in These Spaces
Open to Below
Open to Below
Open to Below
Equipment Platform
Electrical Room
No Work in These Spaces
No Work in These Spaces
OCC SPR
OCC
Route New Hydronic Piping in this area above gypsum ceiling and access from equipment platform. Existing gypsum ceiling to remain and not be damaged.
Legend:
Existing Acoustical Ceiling to Be Removed (Existing Grid to Remain)
• Contractor to remove ceiling tile as required to perform the HVAC modifications and install new ceiling tile in existing grid upon completion of the work. All existing light fixutres, HVAC registers, and other ceiling mounted devices are to be secured in place and reinstalled into new ceiling tile unless specifically noted otherwise.
Existing Acoustical Tile Ceiling to Remain
Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.
OCC
Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.
Note:
Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.
Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD
Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD
Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.
SPR
Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.
Existing Gypsum Ceiling to Remain
Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).
PP
Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.
EM
a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:14:01 AM
A8.3
Bu ild in g
- S ec on d
Fl oo r - D em ol iti on
R ef le ct ed C ei lin g Pl an
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
7 89
3/32" = 1'-0"A8.3
Second Floor Demolition Reflected Ceiling Plan
No Work in These Spaces
Open to Below
Open to Below
Open to Below
Equipment Platform
Electrical Room
No Work in These Spaces
No Work in These Spaces
OCC SPR
OCC
Route New Hydronic Piping in this area above gypsum ceiling and access from equipment platform. Existing gypsum ceiling to remain and not be damaged.
Existing Ceiling to Remain
Legend:
Areas to Receive New Acoustical Ceiling Tile in Existing Grid
• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.
Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.
OCC
Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.
Note:
Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.
Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD
Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD
Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.
SPR
Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.
Existing Gypsum Ceiling to Remain
Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).
PP
Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.
EM
a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:14:05 AM
A8.4
Bu ild in g
- S ec on d
Fl oo r - N ew R ef le ct ed
C ei lin g
Pl an
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
8 89
3/32" = 1'-0"A8.4
Second Floor New Reflected Ceiling Plan
OCC
OCCCD
EM
CD
OCC
Existing Hoist Beam to Remain
Existing Plastic Curtain Wall to Be Removed and Reinstalled
Existing Welding Exhaust System To Remain
CD CD
CD
OCC
PA
PA PA CDPA
Existing Pendant Mounted Task Lighting to Be Removed and Reinstalled
EM
CDPAOCC
PA CDExit
PA
Existing Welding Exhaust Hood Through Ceiling to Remain.
See Building 142 Plans for Scope of Work in this Area
CD
EM
CD
Existing Hoist Beam to Remain
Existing Plastic Curtain Wall to Be Removed and Reinstalled
CD CD
CD
OCC
PA
PA PA CDPA
Existing Pendant Mounted Task Lighting to Be Removed and Reinstalled
EM
PAOCC
PA CD
Exit
PA
Existing Welding Exhaust Hood Through Ceiling to Remain.
OCC
OCC
OCC
CD
See Building 142 Plans for Scope of Work in this Area
Existing Welding Exhaust System To Remain
Area Depicted in Partial Reflected Ceiling Plans.
See Drawings 2 and 3 this sheet.
Existing Ceiling and Grid to Be Removed.
• All existing light fixtures, HVAC registers, and ceiling mounted devices to be secured in place and reinstalled into new ceiling unless specifically noted otherwise.
• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.
Legend:
New Ceiling System. Refer to Specifications
Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.
OCC
Existing Occupancy Sensor to Remain. Temporarily detach sensor from ceiling tile and reinstall sensor into new ceiling tile.
Note:
Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile. Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.
Existing Ceiling Mounted Device to Remain. Temporarily detach device from ceiling tile and reinstall device into new ceiling tile.CD
Remove Existing Mechanical Registers. Install new registers. Refer to mechanical.
Existing Emergency Lighting Fixture to Remain. Temporarily remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.
EM
Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA
Existing/Demolition Elevation
New Elevation
Remove Existing Louver
2'
0" 6'
0"
Ci rc ula r L ou ve r
M at ch E xis tin g
Match Existing Circular Louver Width
New Removable Louver with Blank Off Panel
New Permanent Louvers (Open to Attic for Ventilation)
M ec ha ni ca l P la tfr om C oo rd in at e w ith E xi st in g
New Welded Hollow Metal Frame (All Four Sides)
Remove Existing Metal Wall Panel Below Louver. Modify wall framing
- refer to new detail
Existing Metal Wall Panel To Remain
New Metal Stud Framing As Required at Head
Existing Insulation to Remain
Existing Exterior Metal Panel to Remain
Head Detail (Jamb Similar)
Sill Detail
New Louver (See Specifications) Sealant and Backer Rod (1/2" Minimum)
New 14 Gauge, 4 Sided, Painted Hollow Metal Frame. All Corners to be Welded Type.
Sealant & Backer Rod (1/2" Minimum)
New Pressure Treated Wood (As Required)
Metal Panel Closure Trim. Prefinished Steel.
Color as Selected by Owner.
Provide New Insulation Matching Existing Insulation at Head, Jamb, and SIll to replace insluation damaged or removed for installation of new louvers.
Provide New Insulation Matching Existing Insulation at Head, Jamb, and SIll to replace insluation damaged or removed for installation of new louvers.
Louver Sill Flashing with Sealed End Dams
New Louver (See Specifications)
Sealant and Backer Rod (1/2" Minimum)
Verify
Existing
Se e
El ev at io n
Va rie s
New Pressure Treated Wood (As Required)
Existing Exterior Metal Panel to Remain
Existing Insulation to Remain
Continuous Cleat at Sill
Metal Panel Closure Trim. Prefinished Steel. Color as Selected by Owner.
Sealant
New Metal Stud Framing As Required
0.040 Thick Prefinished Aluminum Sill
Flashing. Color as Selected by Owner.
M in i m um
0'
6"
0' - 1" a b c d e f g h i j a b c d e f g h i j
Sheet Number
Sheet Title
Project Title
Se ay
, S ea y
Li tc hf ie ld A rc h i te ct s
Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
Sheet of
7/31/2017 10:14:10 AM
A8.5
Bu ild in g
R ef le ct ed C ei lin g Pl an /B ui ld in g
Lo uv er D et ai ls
R ep ai r H
VA
C
B as ew id e
7t h
Ai r R ef ue lin g
W in g
Bi rm in gh am , A
L
15107/BRKR 142605
June 1, 2017
DCD
DCD
9 89
1/8" = 1'-0"A8.5
Building 142 - Partial Ground Floor Reflected Ceiling Demolition Plan
1/8" = 1'-0"A8.5
Building 142 - Partial Ground Floor New Reflected Ceiling Plan
1/32" = 1'-0"A8.5
Building 142 Ground Floor Reference Plan
3/32" = 1'-0"A8.5 4 Building 175 Elevations
1 1/2" = 1'-0"A8.5 5 Louver Detail a b c d e f g h i j
Sheet Number
R e p a i r
H
V A
C
B a s e w i d e t h
A i r
R e f u e l i n g
W i n g
B i r m i n g h a m
A
L
Sheet Title
Project Title
S e a y
S e a y
L t c h f i e l d r c h i t e c t s
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E1.1
S Y
M B
O L
S
A
N D
O T
E S a b c d e f g h i j
Sheet Number
R e p a i r
H
V A
C
B a s e w i d e r
R e f u e l i n g
W i n g
B i r m i n g h a m
A
L
Sheet Title
Project Title
S e a y
S e a t c h f i e c h i t e c t s
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E2.1
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N S
A N
D
P
O W
E R
P
A
N S
Wash Bay
Storage
Toilet A
Toilet B
Office
Equipment
B a t t e r y
Service
Bay 1
Service
Bay 2
Service
Bay 3
Mezzanine
Office
Comm.
Rm.
Ready Room
Wash Bay
Storage
Toilet A
Toilet B
Office
Equipment
B a t t e r y
Service
Bay 1
Service
Bay 2
Service
Bay 3
Mezzanine
Office
Comm.
Rm.
Ready Room a b c d e f g h i j
Sheet Number
R e p a i r
H
V A
C
B a s e w i d e r
R e f u e l i n g
W i n g
B i r m i n g h a m
A
L
Sheet Title
Project Title
S e a y
S e a t c h f i e c h i t e c t s
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E3.1
B U
I L
D I N
G
D E
M O
L I T
I O
N
A
N D
P O
W E
R
P
L A
N
Sheet Number
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E4.1
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E4.2
B U
I L
D I N
G
O W
E R
P L
A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E5.1
B U
I L
D I N
G
F
I R
S T
A N
D
S
E C
O N
D
F
L O
O R
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E5.2
B U
I L
D I N
G
F
I R
S T
A N
D
S
E C
O N
D
F
L O
O R
P O
W E
R
P
L A
N a b c d e f g h i j
Sheet Number
R e p a i r
H
V A
C
B a s e w i d e r
R e f u e l i n g
W i n g
B i r m i n g h a m
A
L
Sheet Title
Project Title
S e a y
S e a t c h f i e c h i t e c t s
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E6.1
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N
A N
D
P
O W
A a b c d e f g h i j
Sheet Number
R e p a i r
H
V A
C
B a s e w i d e r
R e f u e l i n g
W i n g
B i r m i n g h a m
A
L
Sheet Title
Project Title
S e a y
S e a t c h f i e c h i t e c t s
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E7.1
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N
A N
D
P
O W
A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N
A
N D
P O
W E
R
P
L A
N
E8.1
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E9.1
B U
I L
D I N
G
E L
E C
T R
I C
A L
D E
M O
L I T
I O
N
P
L A
N
A
N D
P O
W E
R
P
L A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E10.1
B U
I L D
I N
G
E L E
C T
R I C
A L
D E
M O
L I T
I O
N
P
L A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E10.2
B U
I L D
I N
G
P
O W
E R
P L A
Sheet Title
Project Title
Architects & Interior Designers
1115 South Court Street
Montgomery, AL 36104
334. 263. 5162 sslarch.com
Job Number
Date
Drawn By
Checked By
Revised
15107/BRKR 142605
June 1, 2017
MWS
SJM
PHONE: (256) 240-7335
M.E. JOB #1536
878 AVALON LANE
ANNISTON, AL 36207
Sheet of 89
6-1-17
E11.1
B U
I L D
I N
G
P
O W
A
N
| A1-0 - Site Reference Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A1-1 - Building 550 Demolition Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A2-1 - Building 550 New Floor Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A8-1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A8-2 - Building 141 New Reflected Ceiling Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A8-3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A8-4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| A8-5 - Building 142 Reflected Ceiling Plan-Building 175 Louver Details |
| Sheets |
| A1.0 - Site Reference Plan |
| A1.1 - Building 550 Demolition Plan |
| A2.1 - Building 550 New Floor Plan |
| A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan |
| A8.2 - Building 141 New Reflected Ceiling Plan |
| A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan |
| A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan |
| A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details |
| M1.1 |
| M1.2 |
| M1.3 |
| M1.4 |
| M1.5 |
| M1.6 |
| M1.7 |
| M1.8 |
| M1.9 |
| M1.10 |
| M1.11 |
| M1.12 |
| M1.13 |
| M1.14 |
| M2.1 |
| M2.2 |
| M2.3 |
| M2.4 |
| M2.5 |
| M2.6 |
| M2.7 |
| M2.8 |
| M2.9 |
| M2.10 |
| M2.11 |
| M2.12 |
| M3.1 |
| M4.1 |
| M4.2 |
| M5.1 |
| M5.2 |
| M6.1 |
| M6.2 |
| M7.1 |
| M8.1 |
| M9.1 |
| M9.2 |
| M9.3 |
| M9.4 |
| M9.5 |
| M9.6 |
| M10.1 |
| M11.1 |
| M11.2 |
| M12.1 |
| M13.1 |
| M13.2 |
| M14.1 |
| M14.2 |
| M15.1 |
| M15.2 |
| M15.3 |
| M15.4 |
| M15.5 |
| M15.6 |
| M15.7 |
| M15.8 |
| M15.9 |
| M16.1 |
| M17.1 |
| M17.2 |
| M18.1 |
| M18.2 |
| M19.1 |
| P1.1 |
| P2.1 |
| BANG ELECTRICAL - BID SET |
| T1.0 - Index.pdf |
| Sheets |
| T1.0 - Title Sheet and Index to Drawings |
File details come from the government source that posted it.