Date: July 23, 2018
To: SMSgt. Hall
Subject: ADDENDUM NO. 2
Project: REPAIR HVAC BASEWIDE
Job #: SSL# 15107.00
ANG# BRKR142605
From: David Donovan
The plans and Specifications of the subject project, dated 1 June 2017 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern)
Item No. 1: Refer to specifications. Delete specifications and replace specifications with the attached specifications with a revised date of 24 July 2018.
Revision included in the attached specifications include, but are not limited to, the following:
- Revise Work Sequence requirements for building 550 in specification section 01 1000 – refer to paragraph 1.06(A)8
- Specification Section 01 2300 Bid Options o Remove Bid Option No 5: Building 700 Evaporative Chiller o Remove Alternate No. 6: Building 550 Replace Zone Damper with Variable Air Volume Boxes Item No. 2: Refer to drawings. Delete drawings and replace drawings with the attached drawings with a revised date of 24 July 2018. Revision included in the attached drawings include, but are not limited to, the following:
- Sheet T1.0:
o Revised drawing index and sheet sequence numbers.
o Revised Schedule of Bid Options
- Delete note entitled “***BID OPTION**** NOTE” on drawing sheet A2.1
- Revised HVAC Drawing Index on sheet M1.1
- Drawings Sheet M1.3 o Delete Micro Channel Coil o Revised chiller selection/approved manufacturers
- Drawings Sheet M1.4 o Delete Solar Ready Requirement
REPAIR HVAC BASEWIDE ADDENDUM NO. 2
Seay Seay & Litchfield, P.C. 23 July 2018 SSL #15107, ANG#BRKR 142605 Page 2 of 2
- Drawings Sheet M1.6 o Delete Micro Channel Coil o Revised chiller selection/approved manufacturers
- Drawings Sheet M1.9 o Delete Micro Channel Coil o Revised chiller selection/approved manufacturers
- Drawings Sheet M1.10 o Revised chiller selection/approved manufacturers
- Drawings Sheet M1.11 o Delete Micro Channel Coil o Revised chiller selection/approved manufacturers
- Delete Drawing Sheet M1.12. Previous drawing sheet M1.13 is now sheet M1.12. Previous drawing sheet M1.14 is now sheet M1.13.
- On new drawings sheet M1.12 “HVAC Schedules Building 700/701” o Delete Micro Channel Coil o Revised chiller selection/approved manufacturers o Delete Alternate Chiller Schedule
- Remove demolition note 2 and demolition associated with zone damper replacement on drawings sheet M15.1
- Remove demolition note 2 and demolition associated with zone damper replacement on drawings sheet M15.2
- Remove “Base Bid” from sheet title on drawing sheets M15.3, M15.4, and M15.5.
- Delete sheets M15.6, M15.7, M15.8, M15.9
- Revise Building 125 Mechanical Equipment Circuit Schedule and keynotes on sheet E3.1
- Revised Mechanical Equipment Circuit Schedule on sheet E9.1
- Remove keynote 1 and work associated with zone damper replacement on sheet E10.1
- Remove keynote 7 and work associated with zone damper replacement on sheet E10.3
- Add sheet S1.0 for structural modifications required to install new
HVAC units in the attic of building 175.
Item No. 3: Clarification: Refer to part 1.06 of specification section 01 1000
“Summary” for proposed phasing of unit replacement. If unit replacement is phased in accordance with this section of specification 01 1000, no temporary heating/cooling will be required. If the Contractor proposes a different work sequence (see paragraph 1.06(A)1) temporary heating/cooling may be required by the Owner. The cost for temporary heating/cooling would be the responsibility of the Contractor.
End of Addendum #2