BRKR_142605_-_Revised_Drawings_-_Addendum_No_2__small.pdf

PDF 25 MB Posted

Attached to
Repair HVAC Base-wide
Solicitation number
W912JA-18-B-5002
Issued by

About this file

Revised Drawings 24 July 2018

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/24/2018 2:05:34 PM

T1.0

Ti tle

S he et a nd In de x to D ra w in gs

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

July 24, 2018

1 85

Sheet Schedule

Sheet Count Sheet No. Sheet Name

44 M9.1 First Floor HVAC Demolition Plan - Building 141 45 M9.2 Second Floor HVAC Demolition Plan - Building 141 46 M9.3 First Floor HVAC Demolition P lan - Building 142 47 M9.4 Revised First Floor HVAC Plan - Building 141 48 M9.5 Revised Second Floor HVAC Plan - Building 141 49 M9.6 Revised First Floor HVAC Plan - Building 142 50 M10.1 Sub Metering Plan - Building 148 51 M11.1 HVAC Demolition Plan - Building 149 52 M11.2 Revised HVAC Plan - Building 149 53 M12.1 Sub Metering Plan - Building 151 54 M13.1 HVAC Demolition Plan - Building 175 55 M13.2 Revised HVAC Plan - Building 175 56 M14.1 HVAC Demolition Plan - Building 190 57 M14.2 Revised HVAC Plan - Building 190 58 M15.1 HVAC Demolition Plan - Part "A" Building 550 59 M15.2 HVAC Demolition Plan - Part "B" Building 550 60 M15.3 Revised HVAC Plan - Part "A" Buidling 550 61 M15.4 Revised HVAC Plan - Part "B" Building 550 62 M15.5 Hydronic Piping Plan - Building 550 63 M16.1 Sub Metering Plan - Building 620 64 M17.1 HVAC Demolition Plan - Building 700/701 65 M17.2 Revised HVAC Plan - Buidling 700/701 66 M18.1 HVAC Demolition Plan - Building 710 67 M18.2 Revised HVAC Plan - Building 710 68 M19.1 HVAC Plans - Building 750 06 Plumbing 69 P1.1 Revised Condesnate Plumbing Plan - Building 141 70 P2.1 Revised Gas & Condensate Plan - Building 550 07 Electrical 71 E1.1 Symbols and Notes 72 E2.1 Building 40 Electrical Demolition Plans and Power Plans 73 E3.1 Building 125 Demolition and Power Plans 74 E4.1 Building 135 Electrical Demolition Plan 75 E4.2 Building 135 Power Plan 76 E5.1 Building 141 First and Second Floor Electrical Demolition Plans 77 E5.2 Building 141 First and Second Floor Power Plans 78 E6.1 Building 142 Electrical Demolition Plan and Power Plan 79 E7.1 Building 149 Electrical Demolition Plan and Power Plan 80 E8.1 Building 175 Electrical Demolition Plan and Power Plan 81 E9.1 Building 190 Electrical Demolition Plan and Power Plan 82 E10.1 Building 550 Electrical Demolition Plan 83 E10.2 Building 550 Power Plan 84 E11.1 Building 701, 710, & 750 Power Plans 08 Structural

85 S1.0 BUILDING 175 STRUCTURAL DIAGRAMS

Sheet Schedule

Sheet Count Sheet No. Sheet Name

21 M1.12 HVAC Schedules Building 700/701 22 M1.13 HVAC Schedules Building 710 and 750 23 M2.1 HVAC Details 24 M2.2 HVAC Details 25 M2.3 HVAC Details 26 M2.4 HVAC Details 27 M2.5 HVAC Details 28 M2.6 HVAC Details 29 M2.7 HVAC Details 30 M2.8 HVAC Details 31 M2.9 HVAC Details 32 M2.10 HVAC Details 33 M2.11 HVAC Details 34 M2.12 HVAC Details 35 M3.1 Sub Metering Plan - Building 30 36 M4.1 HVAC Demolition Plans - Building 40 37 M4.2 Revised HVAC Plans - Building 40 38 M5.1 HVAC Demoltion Plan - Building 125 39 M5.2 Revised HVAC Plan - Building 125 40 M6.1 HVAC Demolition Plan - Building 135 41 M6.2 Revised HVAC Plan - Building 135 42 M7.1 Sub Metering Plan - Building 138 43 M8.1 Sub Metering Plan - Building 139

Sheet Schedule

Sheet Count Sheet No. Sheet Name

00 Title 1 T1.0 Title Sheet and Index to Drawings 04 Architectural 2 A1.0 Site Reference Plan 3 A1.1 Building 550 Demolition Plan 4 A2.1 Building 550 New Floor Plan 5 A8.1 Building 141 - Ground Floor - Reflected Ceiling Demolition Plan 6 A8.2 Building 141 New Reflected Ceiling Plan 7 A8.3 Building 141 - Second Floor - Demolition Reflected Ceiling Plan 8 A8.4 Building 141 - Second Floor - New Reflected Ceiling Plan 9 A8.5 Building 142 Reflected Ceiling Plan/Building 175 Louver Details 05 Mechanical 10 M1.1 HVAC Legend and Notes 11 M1.2 HVAC Schedules Building 40 12 M1.3 HVAC Schedules Building 125 13 M1.4 HVAC Schedules Building 135 14 M1.5 HVAC Schedules Building 141 15 M1.6 HVAC Schedules Building 142 and 149 16 M1.7 HVAC Schedules Building 175 17 M1.8 HVAC Schedules Building 190 18 M1.9 HVAC Schedules Building 190 19 M1.10 HVAC Schedules Building 550 20 M1.11 HVAC Schedules Building 550

Plumbing, Mechanical:

Approvals:

Title: Signature: Date:

Base Commander

Base Civil Engineer

Base Project Engineer

Bio Environmental Eng.

Safety

Security Police

Base Communications

Fire Chief

Using Agent

Repair HVAC Basewide

BRKR 142605

Birmingham IAP (ANG), AL

Architect:

Design Team: Consulting Engineers:

Electrical:

Option #3

Schedule of Bid Options:

Building 550 Evaporative Chiller

Option #2 Building 125 Evaporative Chiller

Option #1 Building 149 Evaporative Chiller

Option #4 Building 190 Evaporative Chiller x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

S

R

IP

R A P

B U

IL

D

IN

G

AC

AC

B R A S S

D

IS

K

E L E V A T

IO

N

.0

E

.9

N

.3

STOP

S T O P

CP

E

STO

P

S T O P

PC

E

STOP

S

TO

P

S

TO

P

S

TO

P

STOP

STOP

STOP

S

TO

P

S

TO

P

B L A S T

W A L L

B L A S T

W A L L

B L A S T

W A L L

B L A S T

W A L L

C O

N

TE LO

O

P RO

AD

AIR NATIONAL GUARD BLVD

"A" STREET

"C" STREET

FAA FACILITY

BX SERVICE STATION

AN

G

C R

ED

IT

U N

IO

N

M

AIN

G

ATE

C P

N O

PAR

KING

N O

PAR

KING

N O P

AR

K

IN

G

N O P

AR

K

IN

G

N O P

AR

K

IN

G

N O P

AR

K

IN

G

N O P

AR

K

IN

G

C O

C O

SS

G P

G P G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P G P

G P

G P

G P

G P

G P

G P

C O

C O

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G P

G

PG

P

A C

C O N C

C O N C R E T E

C O N C R E T E

C O N C R E T E

CONCRETE

C O N C

RETE

C O N C R E T E

RAMP

C O N C

C O N C

C O N C

C O N C

C O N C

S D

S D

E A S T L A K E

B L V D

E A S T L A K E

B L V D

E A S

TLA

K E B

LV

D

EASTLAKE BLVD.

EASTLAKE BLVD.

EASTLAKE BLVD.EASTLAKE BLVD.

EASTLAKE BLVD.

EA

STLAKE B

LVD.

EA

STLAKE B

LVD.

S M

IT

H

C

IR

C L E

S M

IT

H

C

IR

C L E

"B" STREET

B

S T R E E T

"A" STREET

"A" STREET

F F

.6

B

UILDING 41

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING 610

B U

IL

D

IN

G

M A

IN

G A T E

S E R V

IC

E

S T A T

IO

N

C O N T E

L O O P

R O A D

B A C H U S

D R

IV

E

AIR NATIONAL GUARD BLVD.

B A C H U S

D R

IV

E

B U

IL

D

IN

G

B U

ILD

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

G A Z E B O

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T

A S P H A L T A S P H A L T

700/ 701 710

Legend:

Denotes A Structure Included in the Proposed Scope of Work a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

8/16/2017 3:49:46 PM

A1.0

Si te

R ef er en ce P la n

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

2 89

1" = 160'-0" A1.0

Site R eference Plan

Remove Concrete Sidewalk As Required to Install New HVAC Systems - Remove Sidewalks from Existing Control to Next Existing Control Joint (Typical)

A1.1

Remove Concrete Sidewalk As Required to Install New HVAC Systems - Remove Sidewalks from Existing Control to Next Existing Control Joint (Typical)

Remove Existing Landscaping Including All Ground Cover, Shrubbery, and Trees

Existing Concrete Sidewalk to Be Removed as Required to Install New HVAC Systems

Legend:

Existing Concrete Sidewalks to Remain and be Protected

Remove Existing Sod as Required to Install New HVAC Systems

Existing Trees & Shrubbery to Be Removed

Existing Shrubbery, Ground Cover, and Trees to be Remoeved

Remove Mulch, Ground Cover, Etc and Soil to a Depth of +/-4" Below Current Grade

Treat In-Situ Soil to Prevent Propugation of Weeds Through New Landscape Fabric

Existing Soil to Remain

0'

4" a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:13:24 AM

A1.1

Bu ild in g

D em ol iti on Pl an R ep ai r H

VA

C B as ew id e

7t h Ai r R ef ue lin g W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

3 89

3/32" = 1'-0"A1.1 1 Building 550 Demolition Plan

1/2" = 1'-0"A1.1 2 Landscaping Demolition Sectoin

New Chiller (See Mechanical)

New Bollards (Base Bid)

New Bollards (Base Bid)

A2.1

New Landscaping Fabric and River Rod Mulch

New Concrete Sidewalks (Match Existing/Adjacent Control Joint Locations)

Legend:

Existing Concrete Sidewalks to Remain and be Protected

New Emerald Zoysia Sod

New River Rock Mulch

New Landsaping Fabric

Existing Soil to Remain

0'

4"

Round Concrete Top

NPS 8 STD Weight Steel Pipe Filled with Concrete

2'-0" Diameter Concrete Foundation

Finished Grade

0'

3" 4'

0"

0'

1" 3'

0"

0' - 8" 0' - 8" 0' - 8"

All Bollards to Receive Paint Finish - See Paint Specifications a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

3/16/2018 8:21:02 AM

A2.1

Bu ild in g

N ew

F lo or Pl an R ep ai r H

VA

C B as ew id e

7t h Ai r R ef ue lin g W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

March 12, 2018

4 84

3/32" = 1'-0"A2.1 1 Building 550 New Plan

1/2" = 1'-0"A2.1

Typical River Rock Mulch Bed Detail

3/4" = 1'-0"A2.1 3 Bollard Detail

SD

SPR

SPR SPR

SPR

OCC

OCC

OCC

OCC

CD

CD CD CD

CD

CD

CD

CDCD

CD

CDCD

CD

EM

EM

Exit

HVAC Unit

OCC

SPR

SPR

OCC

OCC

OCC

SPR

OCC

Ex it

PP

EM

Exit

EM

SD SD

EM

SD

EM

SD SD

EM

Exit

EM

Ex it

SD

EM

A8.2

Sim

Ex it

SD

Heavy Curtain Mounted to Ceiling Grid to Remain

OCC

OCC OCC

SPRSPRSPRSPRSPRSPR

SPR SPR SPR SPR SPR SPR

SPR SPR

SPR

SPRSPRSPRSPR

SPR SPR SPR SPR SPR SPR

SPRSPRSPRSPRSPRSPR

SPR

SPR

SPR SPR SPR SPR

SPRSPR

SPR

CD

SPR

OCC SPR

HVAC Duct through Ceiling to Remain

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in These Spaces

No Work in This Space

No Work in These Spaces

No Work in This Space

No Work in This Space

No Work in These Space

HVAC Duct through Ceiling to Remain

HVAC Unit to Be Replaced - See Mechanical

Existing Fire Sprinkler Riser to Remain

No Work in This Space

PA OCC

OCC

SPR SPR

PA

PA

Existing Ceiling to Remain

Areas to Receive New Acoustical Ceiling Tile and Grid

• Reinstall all existing light fixtures, HVAC registers, and ceiling mounted devices into new ceiling unless specifically noted otherwise.

• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.

Legend:

Areas to Receive New Acoustical Ceiling Tile in Existing Grid

• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.

Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.

OCC

Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.

Note:

Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.

Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.

Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD

Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD

Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.

SPR

Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.

Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).

PP

Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.

EM

Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA

Areas Of Existing Sheetrock Ceilings to Remain

Areas to Existing Sheetrock Ceilings to be Removed

• Install new framing as required. Reinstall all ceiling mounted devices into new acoustical tile units.

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:13:47 AM

A8.1

Bu ild in g

- G ro un d

Fl oo r - R ef le ct ed

C ei lin g

D em ol iti on P la n

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

5 89

3/32" = 1'-0"A8.1

Ground Floor Reflected Ceiling Demolition Plan

A8.2

SD

SPR

SPR SPR

SPR

OCC

OCC

OCC

OCC

CD

CD CD CD

CD

CD

CD

CDCD

CD

CDCD

CD

EM

EM

Exit

OCC

SPR No Work in This Space

No Work in This Space

SPR

OCC

OCC

OCC

SPR

OCC

Ex it

PP

EM

A8.2

Sim

SDExit

EM

SD SD

EM

SD

EM

SD SD

EM

Exit

EM

Ex it

SD

EM

Ex it

SD

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in This Space

No Work in These Spaces

No Work in This Space

No Work in These Spaces

Heavy Curtain Mounted to Ceiling Grid to Remain

OCC

OCC OCC

SPRSPRSPRSPRSPRSPR

SPR SPR SPR SPR SPR SPR

SPR SPR

SPR

SPRSPRSPRSPR

SPR SPR SPR SPR SPR SPR

SPRSPRSPRSPRSPRSPR

SPR

SPR

SPR SPR SPR SPR

SPRSPR

SPR

CD

SPR

OCC SPR

HVAC Duct through Ceiling to Remain

No Work in This Space

No Work in This Space

No Work in These Space

HVAC Duct through Ceiling to Remain No Work in This

Space

HVAC Unit to Be Replaced - See Mechanical

Existing Fire Sprinkler Riser to Remain

No Work in This Space

PA OCC

OCC

SPR SPR

PA

PA

Existing Access Hatch to Remain (Paint) Paint Entire Sheetrock Ceiling of this spaace once duct is installed and sheetrock ceiling ceilinh as been patched.

New Acoustical Tile Ceiling - See Specifications New Ceiling Grid Wall Angle

New Metal Stud Framing As Required

Gypsum Wallboard - Provide 3- Coat Painted Finish Corner Bead Existing Ceiling To Remain

Brace New Metal Studs to Structure Above as Required

0'

6"

Existing Ceiling to Remain

Areas to Receive New Acoustical Ceiling Tile and Grid

• Reinstall all existing light fixtures, HVAC registers, and ceiling mounted devices into new ceiling unless specifically noted otherwise.

• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.

Legend:

Areas to Receive New Acoustical Ceiling Tile in Existing Grid

• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.

Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.

OCC

Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.

Note:

Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.

Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.

Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD

Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD

Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.

SPR

Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.

Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).

PP

Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.

EM

Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA

Areas Of Existing Sheetrock Ceilings to Remain

Areas to Existing Sheetrock Ceilings to be Removed

• Install new framing as required. Reinstall all ceiling mounted devices into new acoustical tile units.

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:13:56 AM

A8.2

Bu ild in g

N ew

R ef le ct ed C ei lin g Pl an R ep ai r H

VA

C B as ew id e

7t h Ai r R ef ue lin g W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

6 89

3/32" = 1'-0"A8.2

Ground Floor New Reflected Ceiling Plan

1 1/2" = 1'-0"A8.2 2 Ceiling Transition Detail

No Work in These Spaces

Open to Below

Open to Below

Open to Below

Equipment Platform

Electrical Room

No Work in These Spaces

No Work in These Spaces

OCC SPR

OCC

Route New Hydronic Piping in this area above gypsum ceiling and access from equipment platform. Existing gypsum ceiling to remain and not be damaged.

Legend:

Existing Acoustical Ceiling to Be Removed (Existing Grid to Remain)

• Contractor to remove ceiling tile as required to perform the HVAC modifications and install new ceiling tile in existing grid upon completion of the work. All existing light fixutres, HVAC registers, and other ceiling mounted devices are to be secured in place and reinstalled into new ceiling tile unless specifically noted otherwise.

Existing Acoustical Tile Ceiling to Remain

Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.

OCC

Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.

Note:

Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.

Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.

Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD

Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD

Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.

SPR

Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.

Existing Gypsum Ceiling to Remain

Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).

PP

Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.

EM

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:14:01 AM

A8.3

Bu ild in g

- S ec on d

Fl oo r - D em ol iti on

R ef le ct ed C ei lin g Pl an

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

7 89

3/32" = 1'-0"A8.3

Second Floor Demolition Reflected Ceiling Plan

No Work in These Spaces

Open to Below

Open to Below

Open to Below

Equipment Platform

Electrical Room

No Work in These Spaces

No Work in These Spaces

OCC SPR

OCC

Route New Hydronic Piping in this area above gypsum ceiling and access from equipment platform. Existing gypsum ceiling to remain and not be damaged.

Existing Ceiling to Remain

Legend:

Areas to Receive New Acoustical Ceiling Tile in Existing Grid

• Install new Ceiling Tile into existing grid in these areas. Reinstall all ceiling mounted devices into new acoustical tile units.

Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.

OCC

Existing Occupancy Sensor to Remain. Where required, temporary detach sensor from ceiling tile and reinstall sensor into new ceiling tile.

Note:

Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile.

Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.

Existing Ceiling Mounted Device to Remain. Where required, temporary detach device from ceiling tile and reinstall device into new ceiling tile.CD

Existing Ceiling Mounted Smoke Detector to Remain. Where required, temporary detach smoke detector from ceiling tile and reinstall smoke detector into new ceiling tile.SD

Existing Ceiling Sprinkler Head to Remain. Where required, temporary detach sprinkler head from ceiling tile and reinstall sprinkler head into new ceiling tile. Adjust piping as required to ensure sprinkler head is centered in new ceiling tile configuration where applicable.

SPR

Existing Mechanical Registers to Remain. Where required, temporary detach registers from ceiling grid and reinstall registers into new ceiling grid. Adjust register location as required to fit into new ceiling grid layout where applicable.

Existing Gypsum Ceiling to Remain

Existing Power Pole to Remain. Protect power pole as required during demolition/installation of new ceilings (if applicable). Coordinate layout of new ceilings with current power pole locations (where applicable).

PP

Existing Emergency Lighting Fixture to Remain. Where required, remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.

EM

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:14:05 AM

A8.4

Bu ild in g

- S ec on d

Fl oo r - N ew R ef le ct ed

C ei lin g

Pl an

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

8 89

3/32" = 1'-0"A8.4

Second Floor New Reflected Ceiling Plan

OCC

OCCCD

EM

CD

OCC

Existing Hoist Beam to Remain

Existing Plastic Curtain Wall to Be Removed and Reinstalled

Existing Welding Exhaust System To Remain

CD CD

CD

OCC

PA

PA PA CDPA

Existing Pendant Mounted Task Lighting to Be Removed and Reinstalled

EM

CDPAOCC

PA CDExit

PA

Existing Welding Exhaust Hood Through Ceiling to Remain.

See Building 142 Plans for Scope of Work in this Area

CD

EM

CD

Existing Hoist Beam to Remain

Existing Plastic Curtain Wall to Be Removed and Reinstalled

CD CD

CD

OCC

PA

PA PA CDPA

Existing Pendant Mounted Task Lighting to Be Removed and Reinstalled

EM

PAOCC

PA CD

Exit

PA

Existing Welding Exhaust Hood Through Ceiling to Remain.

OCC

OCC

OCC

CD

See Building 142 Plans for Scope of Work in this Area

Existing Welding Exhaust System To Remain

Area Depicted in Partial Reflected Ceiling Plans.

See Drawings 2 and 3 this sheet.

Existing Ceiling and Grid to Be Removed.

• All existing light fixtures, HVAC registers, and ceiling mounted devices to be secured in place and reinstalled into new ceiling unless specifically noted otherwise.

• Contractor shall temporarily support all ceiling mounted devices (including but not limited to electrical, HVAC, plumbing, security, control, etc.. devices) with new hangar wire as required to safely remove and replace ceiling grid in areas indicated to receive new ceiling tile and grid.

Legend:

New Ceiling System. Refer to Specifications

Existing Lighting Fixture to Remain. Where required, temporary detach fixture from ceiling grid and reinstall fixture into new ceiling grid. Adjust fixture location as required to fit into new ceiling grid layout where applicable.

OCC

Existing Occupancy Sensor to Remain. Temporarily detach sensor from ceiling tile and reinstall sensor into new ceiling tile.

Note:

Where existing ceilings tiles are removed, the Contractor shall install new batt insulation on top of ceiling tile. Cut batt insulation to fit ceiling tile and adhere batt insulation to the ceiling tile - refer to specifications.

Existing Ceiling Mounted Device to Remain. Temporarily detach device from ceiling tile and reinstall device into new ceiling tile.CD

Remove Existing Mechanical Registers. Install new registers. Refer to mechanical.

Existing Emergency Lighting Fixture to Remain. Temporarily remove existing fixture and reinstall in new ceiling tile. Where fixtures have to be removed for installation of new ceiling tile, the Contractor shall coordinate the trades and ensure the lighting fixtures are reinstalled as soon as possible after removal to ensure all required emergency lighting is operational throughout the duration of the project.

EM

Existing Public Address System Speaker to Remain. Temporarily detach speaker from ceiling tile and reinstall speaker into new ceiling tile.PA

Existing/Demolition Elevation

New Elevation

Remove Existing Louver

2'

0" 6'

0"

Ci rc ula r L ou ve r

M at ch E xis tin g

Match Existing Circular Louver Width

New Removable Louver with Blank Off Panel

New Permanent Louvers (Open to Attic for Ventilation)

M ec ha ni ca l P la tfr om C oo rd in at e w ith E xi st in g

New Welded Hollow Metal Frame (All Four Sides)

Remove Existing Metal Wall Panel Below Louver. Modify wall framing

- refer to new detail

Existing Metal Wall Panel To Remain

New Metal Stud Framing As Required at Head

Existing Insulation to Remain

Existing Exterior Metal Panel to Remain

Head Detail (Jamb Similar)

Sill Detail

New Louver (See Specifications) Sealant and Backer Rod (1/2" Minimum)

New 14 Gauge, 4 Sided, Painted Hollow Metal Frame. All Corners to be Welded Type.

Sealant & Backer Rod (1/2" Minimum)

New Pressure Treated Wood (As Required)

Metal Panel Closure Trim. Prefinished Steel.

Color as Selected by Owner.

Provide New Insulation Matching Existing Insulation at Head, Jamb, and SIll to replace insluation damaged or removed for installation of new louvers.

Provide New Insulation Matching Existing Insulation at Head, Jamb, and SIll to replace insluation damaged or removed for installation of new louvers.

Louver Sill Flashing with Sealed End Dams

New Louver (See Specifications)

Sealant and Backer Rod (1/2" Minimum)

Verify

Existing

Se e

El ev at io n

Va rie s

New Pressure Treated Wood (As Required)

Existing Exterior Metal Panel to Remain

Existing Insulation to Remain

Continuous Cleat at Sill

Metal Panel Closure Trim. Prefinished Steel. Color as Selected by Owner.

Sealant

New Metal Stud Framing As Required

0.040 Thick Prefinished Aluminum Sill

Flashing. Color as Selected by Owner.

M in i m um

0'

6"

0' - 1" a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/31/2017 10:14:10 AM

A8.5

Bu ild in g

R ef le ct ed C ei lin g Pl an /B ui ld in g

Lo uv er D et ai ls

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

9 89

1/8" = 1'-0"A8.5

Building 142 - Partial Ground Floor Reflected Ceiling Demolition Plan

1/8" = 1'-0"A8.5

Building 142 - Partial Ground Floor New Reflected Ceiling Plan

1/32" = 1'-0"A8.5

Building 142 Ground Floor Reference Plan

3/32" = 1'-0"A8.5 4 Building 175 Elevations

1 1/2" = 1'-0"A8.5 5 Louver Detail

S e a y

S e a y

L i t c h f i e l d

A r c h i t e c t s

R e p a i r

H

V A

C

B a s e w i d e t h r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet of 84

BUILDING 141

P1.1

R E

V I S

E D

C O

N D

E N

S A

T E

P L

U M

B I N

G

P L

N

B U

I L

D I N

G

REVISED CONDENSATE PLUMBING PLAN

PLUMBING NOTES

PLUMBING DRAWING INDEX

EQUIPMENT DETAIL

GAS CONNECTION TO

PLUMBING LEGEND

e a y

S e a t c h f i e c h i t e c t s

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet of 84

BUILDING 550

P2.1

R E

V I S

E D

G

C O

N D

E N

S A

T E

P L

U M

B I N

G

P

L A

N

B U

I L

D I N

G

REVISED GAS PLUMBING PLAN

a b c d e f g h i j

Sheet Number

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet Title

Project Title

S e a y

S e a t c h f i e c h i t e c t s

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E1.1

S Y

M B

O L

S

A

D

O T

E a b c d e f g h i j

Sheet Number

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet Title

Project Title

S e a y

S e a t c h f i e c h i t e c t s

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E2.1

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N S

A N

D

P

O W

R

P

A

N S

Wash Bay

Storage

Toilet A

Toilet B

Office

Equipment

B a t t e r y

Service

Bay 1

Service

Bay 2

Service

Bay 3

Mezzanine

Office

Comm.

Rm.

Ready Room

Wash Bay

Storage

Toilet A

Toilet B

Office

Equipment

B a t t e r y

Service

Bay 1

Service

Bay 2

Service

Bay 3

Mezzanine

Office

Comm.

Rm.

Ready Room a b c d e f g h i j

Sheet Number

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet Title

Project Title

S e a y

S e a t c h f i e c h i t e c t s

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E3.1

B U

I L

D I N

G

D E

M O

L I T

I O

N

A

N D

P O

W E

R

P

L A

N S

March 12, 2018

Sheet Number

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E4.1

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E4.2

B U

I L

D I N

G

O W

E R

P L

A

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E5.1

B U

I L

D I N

G

F

I R

S T

A N

D

S

E C

O N

D

F

L O

O R

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E5.2

B U

I L

D I N

G

F

I R

S T

A N

D

S

E C

O N

D

F

L O

O R

P O

W E

R

P

L A

N a b c d e f g h i j

Sheet Number

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet Title

Project Title

S e a y

S e a t c h f i e c h i t e c t s

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E6.1

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N

A N

D

P

O W

A a b c d e f g h i j

Sheet Number

R e p a i r

H

V A

C

B a s e w i d e r

R e f u e l i n g

W i n g

B i r m i n g h a m

A

L

Sheet Title

Project Title

S e a y

S e a t c h f i e c h i t e c t s

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E7.1

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N

A N

D

P

O W

A

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N

A

N D

P O

W E

R

P

L A

N

E8.1

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E9.1

B U

I L

D I N

G

E L

E C

T R

I C

A L

D E

M O

L I T

I O

N

P

L A

N

A

N D

P O

W E

R

P

L A

N

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E10.1

B U

I L D

I N

G

E L E

C T

R I C

A L

D E

M O

L I T

I O

N

P

L A

N

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E10.2

B U

I L D

I N

G

P

O W

E R

P L A

N

Sheet Title

Project Title

Architects & Interior Designers

1115 South Court Street

Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

15107/BRKR 142605

June 1, 2017

MWS

SJM

PHONE: (256) 240-7335

M.E. JOB #1536

878 AVALON LANE

ANNISTON, AL 36207

Sheet of 84

6-1-17

E11.1

B U

I L D

I N

G

P

O W

A

N

EXISTING METAL WALL PANEL TO REMAIN

EXISTING METAL WALL PANEL TO TO BE

REMOVED AS REQURIED TO INSTALL NEW

LOUVER

EXISTING GIRT TO REMAIN

EXISTING GIRT TO BE REMOVED AT NEW

LOUVER

EXISTING ROOF SUPPORT WALL TO

REMAIN

REMOVE EXISTING VERTICAL FRAMING

MEMBER AS REQUIRED TO INSTALL

NEW LOUVER OPENING

REMOVE EXISTING VERTICAL FRAMING

MEMBER AS REQUIRED TO INSTALL

NEW LOUVER OPENING

GENERAL CONTRACTOR SHALL FIELD VERIIFY ALL LOAD BEARING

CONDITIONS AND PROVIDE TEMPORARY SHORING OF EXISITNG STRUCTURE

AS REQUIRED TO SAFELY COMPLETE THE MODIFICATIONS DEPICTED

EXISTING ROOF SUPPORT WALL TO

REMAIN

EXISTING METAL WALL PANEL TO REMAIN

EXISTING GIRT TO REMAIN

EXISTING METAL WALL PANEL TO

REMAIN/REMOVE AS REQURIED TO

INSTALL NEW LOUVER

EXISTING GIRT TO REMAIN

EXISTING ROOF SUPPORT WALL TO

REMAIN

EXISTING VERTICAL MEMBER TO REMAIN

ABOVE NEW OPENING - SEE ATTACHMENT

DETAILS FOR CONNECTION OF EXISTING

VERTICAL MEMBERS TO NEW STUD

HEADERS

GENERAL CONTRACTOR SHALL FIELD VERIIFY ALL LOAD BEARING

CONDITIONS AND PROVIDE TEMPORARY SHORING OF EXISITNG STRUCTURE

AS REQUIRED TO SAFELY COMPLETE THE MODIFICATIONS DEPICTED

NEW 8" 16 GAGE STUD - FULL HEIGHT

(BASE OF WALL TO TOP TRACK AT

METAL ROOF)

NEW 8" 16 GAGE STUD - PARTIAL HEIGHT

(BASE OF WALL TO UNDERSIDE OF NEW

HEADER)

EXISTING GIRT TO REMAIN

EXISTING METAL WALL PANEL TO REMAIN

SEE ARCHITECTURAL FOR LOUVER DETAIL

INCLUDING BLOCKING AND

WATERPROOFING REQUIREMENTS

NEW DOUBLE 8", 16 GAGE, STUD HEADER AT

TOP OPENING

METAL WALL PANEL TO REMAIN

NEW 8" 16 GAGE STUD - PARTIAL HEIGHT

(BASE OF WALL TO UNDERSIDE OF NEW

HEADER)

NEW 8" 16 GAGE STUD - FULL HEIGHT

(BASE OF WALL TO TOP TRACK AT

METAL ROOF)

SEE ARCHITECTURAL FOR LOUVER DETAIL

INCLUDING BLOCKING AND

WATERPROOFING REQUIREMENTS

EXISTING ROOF SUPPORT WALL TO

REMAIN

16 GAGE CLIP ANGLE WITH (3) #12

SCREWS EACH LEG (TYPICAL)

(6) #12 SCREWS (TYPICAL)

a b c d e f g h i j a b c d e f g h i j

Sheet Number

Sheet Title

Project Title

Se ay

, S ea y

Li tc hf ie ld A rc h i te ct s

Architects & Interior Designers 1115 South Court Street Montgomery, AL 36104

334. 263. 5162 sslarch.com

Job Number

Date

Drawn By

Checked By

Revised

Sheet of

7/24/2018 2:49:31 PM

S1.0

BU

IL

D

IN

G

ST

R U

C

TU

R

AL

D

IA

G R

AM

S

R ep ai r H

VA

C

B as ew id e

7t h

Ai r R ef ue lin g

W in g

Bi rm in gh am , A

L

15107/BRKR 142605

June 1, 2017

DCD

DCD

July 24, 2018

85 85

1 1/2" = 1'-0"S1.0 1 Structural Demolition Plan

1 1/2" = 1'-0"S1.0 2 New Structural Plan

3" = 1'-0"S1.0

3 ATTACHMENT DETAILS

T1.0
Sheets
T1.0 - Title Sheet and Index to Drawings
A1-0 - Site Reference Plan
Sheets
A1.0 - Site Reference Plan
A1-1 - Building 550 Demolition Plan
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
A2.1
Sheets
A2.1 - Building 550 New Floor Plan
A8-1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
A8-2 - Building 141 New Reflected Ceiling Plan
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
A8-3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
A8-4 - Building 141 - Second Floor - New Reflected Ceiling Plan
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
A8-5 - Building 142 Reflected Ceiling Plan-Building 175 Louver Details
Sheets
A1.0 - Site Reference Plan
A1.1 - Building 550 Demolition Plan
A2.1 - Building 550 New Floor Plan
A8.1 - Building 141 - Ground Floor - Reflected Ceiling Demolition Plan
A8.2 - Building 141 New Reflected Ceiling Plan
A8.3 - Building 141 - Second Floor - Demolition Reflected Ceiling Plan
A8.4 - Building 141 - Second Floor - New Reflected Ceiling Plan
A8.5 - Building 142 Reflected Ceiling Plan/Building 175 Louver Details
M1.1
M1.2
M1.5
M1.7
M1.8
M1.13
M2.2
M2.3
M2.4
M2.5
M2.6
M2.7
M2.8
M2.9
M2.10
M2.11
M2.12
M3.1
M4.1
M4.2
M5.1
M5.2
M6.1
M6.2
M7.1
M8.1
M9.1
M9.2
M9.3
M9.4
M9.5
M9.6
M10.1
M11.1
M11.2
M12.1
M13.1
M13.2
M14.1
M14.2
M15.1
M15.2
M15.3
M15.4
M15.5
M16.1
M17.1
M17.2
M18.1
M18.2
M19.1
P1.1
P2.1
BANG HVAC - REVISED ELECTRICAL
s1.0.pdf
Sheets
S1.0 - BUILDING 175 STRUCTURAL DIAGRAMS

File details come from the government source that posted it.