This document is a set of slides for a pre-bid meeting related to a federal contract opportunity for the Sabine-Neches Waterway Channel Improvement Project in Texas. The contract, solicitation number W912HY24B0021, is for federal full depth dredging of the Sabine Extension Channel to the Sabine Pass Channel.

The key details include: a projected contract advertisement from July 31 to August 30, 2024, with a bid opening on August 30 and contract award on September 20, 2024. The estimated dredging quantity is 36.7 million cubic yards, with placement at an Outer Bar Disposal Site. The dredging will occur from station -186+800 to 29+625. Contractors must have a trawler on site while dredging due to the presence of the threatened Giant Manta Ray species. Pre-award documents must be submitted with the bid. The contract includes three options for different scheduling and pricing elements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

SABINE NECHES WATERWAY CHANNEL

IMPROVEMENT PROJECT

Contract 6 Extension Channel to Sabine Pass Channel

Presenters:

SNWW Project Delivery Team USACE, Galveston District

28 June 2024

Pre-bid Conference Ground Rules:

• Turn cell phones off or to vibrate

• Please mute your mic on the teleconference

• Please wait to be recognized by the Contracting Office before speaking

• Please submit all questions written on index cards

• After the conclusion of the conference, all questions must be directed to the Contracting Officer only

SABINE EXTENSION CHANNEL TO SABINE PASS CHANNEL

FEDERAL FULL DEPTH DREDGING

FEDERAL FULL DEPTH DREDGING

• Projected Contract Advertise: 31 July to 30 August 2024

• Projected Bid Opening: 30 August 2024

• Projected Contract Award: 20 September 2024

• Projected Construction Start: Oct 2024

• Estimated Duration: 679 Calendar Days (Schedule 1)

• Estimated Dredge Quantity: 36.7 MCY

• Placement Area: ODMDS

• Dredge: Sta -186+800 to 29+625

• Dredge Requirement: Dredges must have trawler while dredging at all times.

• Giant Manta Ray is now listed as a threatened species

• Pre-Award documents must be submitted with bid

Schedule No. 1

SABINE EXTENSION CHANNEL TO SABINE PASS CHANNEL

Option No. 1

Option No. 2

SABINE EXTENSION CHANNEL TO SABINE PASS CHANNEL

Option No. 3

Schedule B

Sabine Neches Waterway Channel �improvement Project
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging
� Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging�
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging
Sabine Extension Channel to Sabine Pass Channel �Federal Full Depth Dredging