This document appears to be the Attachment 0003_Schedule B Bid Schedule from a Request for Proposal (RFP) for the Sabine-Neches Waterway Channel Improvement Project (SNWWCIP) in Jefferson County, Texas. The RFP is being issued by the U.S. Army Corps of Engineers, Galveston District.

The Bid Schedule provides a format for bidders to submit pricing and technical details related to the dredging work. Key details include the expected period of performance, average production rates, dredge information, labor requirements, equipment (booster pumps, tugs, scows), and any subcontractors. Bidders are required to provide unit pricing for general items such as fuel and profit, as well as specific details for each dredge to be utilized. The pre-solicitation indicates that a pre-bid conference will be held on June 28, 2024, and all questions must be submitted by June 27, 2024.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project Title:
Contract Number:
U.S. Army Corps of Engineers, Galveston District
Schedule B
General Items
Item #DescriptionQuantityUnitUnit RateTotal
B.1Fuel (Total for Contract)Gal$ - 0$ - 0
B.2Profit (Total for Contract)%$ - 0
B.3Expected Period of PerformanceCalendar Days
B.4Average Expected Production RateCY/Day
Dredge 1 (Repeat per Dredge)
Item #DescriptionUnitTotal
B.5DredgeName
B.6Average Expected Operating Cost$/Day
B.7Average Expected Standby Cost$/Day
Mobilization and Demobilization
B.8Mobilization Distancemi
B.9Demobilization Distancemi
B.10Tug(s) in Transit (if any)Tug(s)
B.11Barge(s) in Transit (if any)Barge(s)
Labor
B.12Crew Size per ShiftCrewmates
B.13Shift ScheduleShifts x Hours per Shift
Equipment
B.14Number of Booster(s) (if any)Booster(s)
B.15Disposal Tug(s) (if any)Tug(s)
B.16Disposal Scow(s) (if any)Scow(s)
Subcontractor 1 (Repeat Per Subcontractor)
Item #DescriptionResponse
B.17Subcontractor
B.18Work Performed by Subcontractor
Dredge 2 (Repeat per Dredge)
Item #DescriptionUnitTotal
B.5DredgeName
B.6Average Expected Operating Cost$/Day
B.7Average Expected Standby Cost$/Day
Mobilization and Demobilization
B.8Mobilization Distancemi
B.9Demobilization Distancemi
B.10Tug(s) in Transit (if any)Tug(s)
B.11Barge(s) in Transit (if any)Barge(s)
Labor
B.12Crew Size per ShiftCrewmates
B.13Shift ScheduleShifts x Hours per Shift
Equipment
B.14Number of Booster(s) (if any)Booster(s)
B.15Disposal Tug(s) (if any)Tug(s)
B.16Disposal Scow(s) (if any)Scow(s)
Subcontractor 2 (Repeat Per Subcontractor)
Item #DescriptionResponse
B.17SubcontractorName?
B.18Work Performed by Subcontractor%