Amendment0006.pdf
PDF 189 KB Posted
- Solicitation number
- W912HY-09-R-0026
About this file
Amendment 0006 FOR W912HY-09-R-0026 Service-Disabled Veteran-Owned Small Business Pool
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0008.pdf | ||
| Amendment0007.pdf | ||
| Amendment0005.pdf | ||
| Amendment0004.pdf | ||
| Amendment0003.pdf | ||
| Pre-Proposal conference.ppt | PPT presentation | |
| sign-in sheet.pdf | ||
| Amendment0002.pdf | ||
| Amendment0001.pdf | ||
| FINAL.RFP.09-R-0026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
RFP for IDIQ MATOC, Design-Build and Design-Bid-Build Projects for Horizontal Construction Services, Southwestern Division (SWD), Service-Disabled Veteran-Owned Small Business Pool of Contractors, for which proposals are due on 30 Oct 09 is amended as follows:
1. Section 00 22 10:
Page 7 - Paragraph 3.1.5 TAB E- FACTOR 5: FINANCIAL CAPABILITY (e.g.
Preaward Information) is replaced by the following:
3.1.5 TAB E- FACTOR 5: FINANCIAL CAPABILITY
Pre Award Information (e.g. Preaward Information)
In accordance with FAR 9.103(a): contracts shall be awarded to responsible prospective contractors only. “To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform the contract or the ability to obtain them. As a minimum, provide the data listed below. As an aid in assessing responsibility, the offeror shall notify their bank/suppliers that the Corps of Engineers may contact them, and shall authorize the bank/suppliers to release the following information regarding the Offeror’s account. If a written authorization is required by their bank, Offerors shall provide that authorization with their proposal. This information will be treated confidentially, but may be checked for verification.
Name and telephone number of bank’s point of contact.
Number of years business has been conducted with each bank.
Types of open accounts (checking, Loans, etc.).
Balance of current accounts (the banks will provide a “range of figures” for this information, such as, medium five-figure range).
Means by which loans are secured and if paid as agreed.
Point of contact and telephone number of three (3) different suppliers.
If the Offeror is a joint venture, each member of the joint venture shall provide the requested information.
2. Section 00 72 00:
Page 113 – 52.233-2 SERVICE OF PROTEST is replaced by the following:
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
0006 - 2
0006 - 3
CELIA COCKBURN
USACE, Galveston District 2000 Fort Point Road Galveston, TX 77550.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
| 00 73 00 Revised 10-5-09 (AMD0001).pdf |
| (8) SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR – JUL 2001 |
| (9) PROTECTION OF MATERIAL AND WORK – AUG 1997 |
| (11) APPROVAL OF MACHINERY AND EQUIPMENT |
| (29) ELECTRONIC SUBMITTAL OF OFFEROR’S PROPOSAL |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0006 |
| EffDate: 10/26/09 |
| ReqNo: |
| ProjNo: |
| IssCode: |
| IssuedBy: U. S. ARMY CORPS OF ENGINEERS |
GALVESTON DISTRICT OFFICE
P. O. BOX 1229
GALVESTON, TEXAS 77553-1229
| AdmCode: CT |
| AdminBy: U. S. ARMY CORPS OF ENGINEERS |
GALVESTON DISTRICT OFFICE
P. O. BOX 1229
GALVESTON, TEXAS 77553-1229
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: W912HY-09-R-0026 |
| AmendDate: 10/26/09 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Off |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: No |
| Copies: 1 |
| Descript: IDIQ MATOC for Horizontal Construction Services, Southwestern Division (SWD), Service-Disabled Veteran-Owned Small Business Pool of Contractors for which proposals are due on 30 Oct 2009 at 2:00 P.M.CT is amended as follows: |
The proposal due date has changed from 29 October 2009 to 30 October 2009 at 2:00 P.M. CT.
This amendment shall be attached to and become a part of the solicitation.
CONTINUED
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Yes |
| OffrNoEx: Off |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
File details come from the government source that posted it. Updated .