Amendment 0001 for IDIQ MATOCs for Design-Build of Horizontal Construction in the Southwest Division (SWD)

View the file

Other files

File Type Posted
Amendment0008.pdf PDF
Amendment0007.pdf PDF
Amendment0006.pdf PDF
Amendment0005.pdf PDF
Amendment0004.pdf PDF
Amendment0003.pdf PDF
Pre-Proposal conference.ppt PPT presentation
sign-in sheet.pdf PDF
Amendment0002.pdf PDF
FINAL.RFP.09-R-0026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SWD DB/DBB IDIQ MATOC, SDVOSB W912HY-09-R-0026

AMD0001-1

RFP for IDIQ MATOC, Design Build and Design Bid Build Projects for Horizontal Construction Services, Southwestern Division (SWD), Service-Disabled Veteran-Owned Small Business Pool of Contractors, for which proposals are due on 29 Oct 09 is amended as follows:

1. Section 00 22 10:

Section 00 22 10- The attached revised Section 00 22 10, replaces the one issued in the solicitation.

2. Section 00 22 20:

Section 00 22 20- The attached revised Section 00 22 20, replaces the one issued in the solicitation.

3. Section 00 73 00- The attached revised Section 00 73 00, replaces the one issued in the solicitation.

4. Section 00 72 00:

Clause 52.216-19 ORDER LIMITATIONS. (OCT 1995)

Page 28 – the following Paragraph (2)

a. FAR Clause 52.216-9 – Is replaced with the following:

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $5,000,000;

(2) Any order for a combination of task orders in excess of $10,000,000; or

(3) A series of orders from the same ordering office within 30 calendar days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph

(b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 calendar days after issuance, with written notice stating the Contractor's intent not to ship the

AMD0001-2

item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

4. Section 00 21 00 Section 00 21 00- paragraph 1.9 Pre-Proposal Conference:

DATE: 13 October 2009 TIME: 9:00 a.m. – 11:00 a.m. Central Time

5. This amendment shall be attached to and become a part of the solicitation.

Attachments Section 00 22 10 Section 00 22 20 Section 00 73 00

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

SECTION 00 22 10

PHASE 1 OF 2 PHASE DESIGN-BUILD

SELECTION PROCEDURES

00 22 10 - 0

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

SECTION 00 22 10

PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

1.0 OVERVIEW

1.1 PROPOSAL SUBMISSIONS AND THE TRADE-OFF PROCESS

2.0 GENERAL INSTRUCTIONS

3.0 PHASE 1 - VOLUME 1 PROPOSAL CONTENTS

3.1 SUBMISSION REQUIREMENTS

3.1.1 TAB A - SF 1442

3.1.2 TAB B - Representation and Certifications

3.1.3 TAB C - Proposal Data Sheet

3.1.4 TAB D - Evidence of Ability to Obtain Bonding

3.1.5 TAB E - FACTOR 5: FINANCIAL CAPABILITY

3.1.6 TAB F - JOINT VENTURE AGREEMENT (if applicable)

4.0 PHASE 1 - VOLUME 2 PROPOSAL CONTENTS AND PROPOSAL EVALUATION

FACTORS AND SUBFACTORS

5.0 TAB A – FACTOR 1 – SPECIALIZED EXPERIENCE

5.1 SUBMISSION REQUIREMENTS

6.0 TAB B – FACTOR 2 – PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS

7.0 TAB C – FACTOR 3 – KEY PROJECT PERSONNEL CAPABILITIES AND

EXPERIENCE

7.1 SUBMISSION REQUIREMENTS

8.0 TAB D – FACTOR 4 – ORGANIZATION AND MANAGEMENT APPROACH

00 22 10 - 1

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

8.1 SUBMISSION REQUIREMENTS

PHASE ONE – SECTION 00 22 10 ATTACHMENTS

1 – PROPOSAL DATA SHEET

2 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME

CONTRACTOR

3 – COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN

CAPABILITY

4 – PAST PERFORMANCE EVALUATION QUESTIONNAIRE

00 22 10 - 2

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

1.0 PROPOSAL OVERVIEW

This Request for Proposal (RFP) is issued utilizing a "Best Value" Trade-Off, Two-Phase Design Build competitive source selection process to support the execution of the Southwestern Division's (SWD's) horizontal construction, including horizontal construction missions associated with the American Recovery and Reinvestment Act of 2009 (ARRA) signed into law on February 17, 2009.

This acquisition will result in award of two (2) or more Firm Fixed Priced (FFP), Indefinite Quantity Indefinite Delivery (IDIQ) Multiple Award Task Order Contracts (MATOCs). The MATOC pool of contracts are for Design/Build, Design/Bid/Build construction services to meet the requirements and time constraints for Civil Works, Military, and International and Interagency Support (IIS) customers of the Southwestern Division (SWD) which includes the following: Fort Worth District, Little Rock District, Tulsa District and Galveston District. The boundaries for Southwestern Division are identified at http://www.usace.army.mil/about/Pages/Locations.aspx.

This MATOC pool of contracts is for Service-Disabled Veteran-Owned Small Business (SDVOSB) competition. The estimated shared amount between the SDVOSB MATOC pool of contracts is $80,000,000. Each contract shall contain a twelve month base period plus four twelve-month option periods. A guaranteed minimum of $3000, will be on the base year only. The Government intends to award 2 or more IDIQ MATO contracts to establish a pool of contractors. Once a pool of contracts is established, the contractors will compete for each task order in accordance with the ordering procedures set forth in SECTION 00 73 00, Ordering Procedures.

The scope of these SWD MATOCs includes construction under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. It is expected that additional work (excluding individual dredging projects), including but not limited to the following types of projects: abutment construction, asphalt and concrete paving, bridge construction, culverts, curbs, and street gutters, elevated highway construction, overpass construction, road and street surfacing, trestle construction, construction of water and sewer lines, mains, pumping stations, treatment plants and storage tanks, anchored earth retention, breakwater, spillway, floodwater, bulkhead wall or embankment, channel, canal, dams, cofferdam, dikes and other flood control structures, drainage projects, and other earth work related projects, repair, maintain, and build marine related structures, levees, flood control and jetties, as well as anti-terrorism and force protection, outdoor recreation facilities, park and recreational open space improvement and other construction activities as appropriate under NAICS code 237 will be executed under the resultant MATOC contracts. Any workload requirements associated with NAICS 237120, Oil and Gas Pipeline and Related Structures Construction, will be minimal, if not rare. Any workload associated with NAICS 237120 will first be considered for performance under one of the authorized small business set-asides, prior to consideration for award under the Unrestricted MATOC.

Any work executed under the SWD SDVOSB MATOC is limited to the geographic boundaries of the Southwestern Division, U.S. Army Corps of Engineers.

00 22 10 - 3 http://www.usace.army.mil/about/Pages/Locations.aspx

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

The contractor shall perform in accordance with the Scope of Work provided with each Task Order and within strict accordance of the terms and conditions specified in the resulting MATOC.

1.1 PROPOSAL SUBMISSIONS AND THE TRADE-OFF PROCESS

This is a "Best Value", Two-Phase competitive selection process for the design and construction of Horizontal Construction Services for Civil, Military, and International and Interagency Support (IIS) Projects.

The first phase consists of a process known in the commercial design-build industry as the Request for Qualifications or acronym: RFQ. (This solicitation refers to it as Phase1.) In Phase 1, interested firms or joint venture entities (referred to as Offeror's) shall submit performance capability proposals in accordance with this Section 00 22 10, demonstrating their capability to successfully execute the design-build construction IDIQ MATO contract resulting from this solicitation. The Government will evaluate the performance capability proposal in accordance Section 00 22 20 of this solicitation and will select between 2 to 10 Contractors from Phase 1, for consideration in Phase 2, in anticipation of awarding 2 or more MATOC contracts in Phase 2.

In Phase 2, the selected Offeror's will submit the remainder of the technical/ performance capability proposals and a price proposal for a seed project. The Government will evaluate the Phase 2 proposals in accordance with the criteria described for Phase 2 in the solicitation and award 2 or more MATO contracts to the responsible Offerors whose proposals conform with all terms and conditions of the solicitation and whose proposals are determined to represent the overall best value to the Government considering technical design quality, performance capability and/or cost.

Phase 2 of this process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. In Phase 2, the short-listed offerors will submit the remaining technical proposal portions as required by Section 00 22 10A, to be provided by amendment for the seed project and price. The government will review, evaluate the Phase 2 proposals as set forth in Section 00 22 20A. The seed/initial task price/cost proposal will not be rated, but will be a factor in making the final best value determination for award of the MATOCs. The seed/initial task will be awarded to only one (1) of the offerors selected for MATOC awards. The other MATOC contractors selected for award of a MATOC contract during Phase 2 will be awarded the minimum guaranteed amount of $3000.00 applicable to the Base Year only. The minimum guaranteed amount $3000.00 will be paid at the end of Base Year 1 to any selected MATOC contractor who is not awarded a task order in Base Year 1.

2.0 GENERAL INSTRUCTIONS

2.1. Who May Submit? Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors. Any legally organized Offeror may submit a proposal. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

2.2. Where to Submit. Offeror's shall submit their proposals to the Galveston District at the address shown in Block 7 of the Standard Form 1442.

2.3 Submission Deadline. Proposals shall be received by the Galveston District no later than the time and date specified in Block 13 of Standard Form 1442 or latest amendment.

00 22 10 - 4

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

2.4 General Requirements

2.4.1 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government.

Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section. The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2) in either phase of this RFP.

2.4.2 Number of Copies: Offerors shall submit 1 original and 1 hard copy of Volume 1 and 1 original and 6 hard copies of Volume 2. Submit 1 electronic copy of Volume II Technical Proposal on CD-ROM. The Technical Proposal for Phase 1 and Phase 2 shall become part of the MATO contract and Task Order award, therefore, offerors who include information in their proposals which they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must mark such information in accordance with instructions at FAR 52.215-1, Instructions to Offerors—Competitive Acquisition, paragraph (e), “Restriction on disclosure and use of data.”

2.4.3 Written proposal materials shall be submitted in standard three ring loose-leaf binders.

Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point with 1 inch margins. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. 11X17 inch sheets will be counted as 2- single sided or 1 - double-sided pages. Volume II, Technical Proposal, shall not exceed 90 pages (90 single-sided or 45 double-sided sheets), excluding the Table of Contents and other exclusions as stated in each Evaluation Factor. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror must comply with the page limitation. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

2.4.4 Electronic Format: The Offeror shall provide the complete Volume 2 proposal on a CD- ROM (read-only). The CD-ROM shall contain the proposal in .pdf format using Adobe Acrobat software to print to a .pdf file.

00 22 10 - 5

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

3.0 PHASE 1 - VOLUME 1 - PROPOSAL CONTENTS

Volume 1 Contents: Submit offer in the format stated below: PHASE 1 DOES NOT INVOLVE

PRICING SUBMISSION.

PHASE 1, VOLUME I CONTENTS:

Location Factor/Subfactor Number Description

Page Limit

TAB A SF 1442

N/A

TAB B Section 00 45 00 Representation and Certifications or ORCA

N/A

TAB C Proposal Data Sheet N/A

TAB D

Evidence of ability to obtain Bonding:

TAB E Factor 5

Financial Capability

TAB F

Joint Venture Agreement (if applicable)

3.1 PHASE 1 VOLUME 1 SUBMISSION REQUIREMENTS

3.1.1 TAB A - SF 1442, completed and signed by an authorized person from the company or team. Any and all amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 1442, Amendment.

3.1.2 TAB B - Section 00 45 00 - completed Representation and Certifications or reference ORCA Representation and Certification.

3.1.3 TAB C - PROPOSAL DATA SHEET - See the format provided in this Section (Attachment 1). Ensure to include Offeror's telephone number, FAX number, email address and DUNS number.

DUNS number will be used to access CCASS data.

3.1.4 TAB D - Evidence of Ability to Obtain Bonding: Submit a letter of commitment from a surety, signed by an officer or agent authorized to bond, that identifies the offeror’s available bonding capacity and limits that the surety will bond the Offeror, as the successful awardee for this project, taking into consideration the Order Limitations of $5 Million for a single task order and aggregate of at least $10 Million. The surety must be acceptable to the Government and must appear on the Department of Treasury Circular 570 “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies.” If the Offeror submits evidence from an individual Surety, the individual surety must include documentation meeting the requirements of FAR 28.203 and Contract Clause 52.228-11.

If the joint venture involves a Contractor and an AE Firm and the Contractor intends to provide the bond, provide a complete explanation with confirmation from the surety.

00 22 10 - 6

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

A Bid Guarantee is not required in Phase 1, but shall be required in accordance with SECTION 00 72 00, Contract Clause 52.228-1 Bid Guarantee in Phase 2. The bid guarantee shall be 20% of the bid price of the seed/initial task order project or $3M whichever is less.

3.1.5 TAB E - FACTOR 5: FINANCIAL CAPABILITY (e.g. Preaward Information)

In accordance with FAR 9.1 03(a) "... contracts shall be awarded to responsible prospective contractors only." To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform the contract or the ability to obtain them. Submit a copy of your latest financial statement and the latest quarterly update available. The statement must include a Balance Sheet and Income Statement. Provide evidence of adequate financing arrangements, such as commitments from lending institutions, etc. to perform the task orders. If the statement is more than 60 days old, attach a certificate stating that the financial condition is substantially the same, or if not the same, describing the changes which have taken place since the financial statement. This information will be treated confidentially, but may be checked for verification. Disclose any unpaid judgments in excess of $1Million. Disclose any disputed or un-adjudicated claims in excess of $1Million.

As an aid in assessing responsibility, the offeror shall notify their bank/suppliers that the Corps of Engineers may contact them, and shall authorize the bank/suppliers to release the following information regarding the Offeror's account. If a written authorization is required by their bank, Offerors shall provide that authorization with their proposal.

Name and telephone number of bank's point of contact Number of years business has been conducted with each bank Types of open accounts (checking, loans, etc.)

Balance of current accounts (the banks will provide a "range of figures" for this information, such as, medium five-figures range) Means by which loans are secured and if paid as agreed Point of contact and telephone number of three (3) different suppliers

If the Offeror is a joint venture, each member of the joint venture shall provide the requested information.

3.1.6 TAB F - Joint Venture Agreement (if applicable)

3.1.6.1 Submission Requirements: When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

4.0 PHASE 1 - VOLUME 2 CONTENTS AND PROPOSAL EVALUATION FACTORS

AND SUBFACTORS

Volume 2 Contents: Submit offer in the format stated below: Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

00 22 10 - 7

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

Location

Page Limit

TAB A Factor 1 (1) (2) Specialized Experience

(1) Prime/construction contractor

(2) Design firm(s) and subcontractor design consultants

50 pg including Project List

TAB B Factor 2 Past Performance

20 pg excluding past performance Questionnaires

TAB C Factor 3 Key Project Personnel – Capabilities and Experience

10 pg

TAB D Factor 4 (1)(2)(3)

(4) (5)

Organization and Management Approach - 1) Organization,

2) Processes during Design and Construction , 3) Planning and Scheduling, 4) Self-Performed Work, 5) Quality Control

10 pg

5.0 TAB A – FACTOR 1: SPECIALIZED EXPERIENCE

5.1 SUBMISSION REQUIREMENTS

5.1.1. The prime construction contractor and the design firm(s) (or prime contract if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects, using sample formats at Attachments 2 and 3 at the end of the section. These formats are provided as samples and may be tailored, as needed.

If offeror represents the combining of two or more companies as a team agreement or joint venture for the purpose of this RFP, the proposal shall clearly identify the contractual responsibilities of each firm and the work to be performed by each; describe the nature of the association; indicate whether the firms have experience working together in construction ventures, including how long and how many projects. In addition, each company including joint ventures shall list their Government contract experience.

Submit projects selected from those discussed in the experience narrative that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer that five (5) years preceding the date of this Solicitation. Design firms may list prime contractors they have worked for or government, private or commercial customers. The offeror shall select the design firm(s). If projects were design-build, so identify them. The prime contractor or key subcontractor shall submit no more than three (3) projects for each of the facility types and the design firm(s) shall each submit no more that three (3) projects for each of the facility types or their equivalent or similar type:

00 22 10 - 8

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

(1) Site development projects to include but not limited to asphalt, concrete or gravel roads, bridges, abutments, curbs, storms drainage, signage, pavement markings, and outdoor recreational facilities, park and recreational open space improvements.

(2) Infrastructure projects to include but not limited to water and sewer mains, treatment plants, pump stations and storage tanks.

(3) Erosion protection projects for inland and coastal areas such as jetties, dikes, breakwaters, and flood control or navigation channels.

(4) Marine related projects to include but not limited to navigational locks, gates, bulkheads, navigational aids, dredged material placement areas levees and associated structures.

(5) Flood control projects to include but not limited to flood control channels, levees, floodwalls, and pump stations.

5.1.1.1 The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the facility types (which may include similar state or local government or private counterparts) included in this contract. Recent experience includes projects well underway (see above criteria) or those completed and turned over within five

(5) years of the proposal issue date for this RFP for design or construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.

5.1.1.2. The offeror should describe any previous teaming experience between current team members, if not described in the project list. Design Firms should describe their experience on LEED projects, if not included on the project list. Offeror may describe design-build experience on other type projects. The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past five years preceding the date of this solicitation.

6.0 TAB B – FACTOR 2: PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS:

6.1.1. Past performance refers to the quality of recent project experience from the owner's perspective. Offerors shall complete and provide Project Information Sheets on no more than a total of ten (10) completed (or substantially complete) construction projects that reflect prior past performance in the project types referenced in paragraph 5.1.1 above. The examples should be same/similar in nature for each project type solicited under this RFP. It is the Government's preference that each project type listed in Factor 1 TAB A, "Specialized Experience" has at least 1 completed Past Performance Information Sheet as required for past performance under Factor 2

TAB B.

The Project Information Sheets shall consist of, as a minimum, the data specified in the attached "Past Performance Questionnaires" lines 1-10. Include the performance rating by the owner on the form, if the Offeror was rated. The Government may contact and interview the points of contact and reserves the right to interview other individuals acting for the listed reference, if the listed reference

00 22 10 - 9

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026 is not available. The offerors may also briefly provide information on problems encountered on identified contracts and the offeror's corrective action.

6.1.1.1 If the offeror represents the combining of two or more companies for the purpose of this RFP, each company shall list project examples for a total combined of no more than ten (10) completed (or substantially complete) construction projects. The Construction Past Performance Information proposal submittal to include the following supporting documentation is limited to 20 pages. For each project submitted, offerors are encouraged to attach the following supporting documentation to the construction past performance information sheet, ensuring that you do not exceed the proposal page limitation:

1) For Corps of Engineer contracts, provide a copy of the signed CCASS (Construction Contract Administration Support System) evaluation issued at the completion of the project

2) For non-Corps of Engineer contracts, provide a copy of the performance rating issued by the contracting agency

3) Awards, letters or other forms of recognition relevant to the submitted project that demonstrate the offeror's performance capabilities and customer satisfaction.

6.1.1.2 Past Performance Questionnaires (Attachment 4). For each project that does not have a final CCASS evaluation, offerors shall provide a questionnaire to the point of contact, clearly identifying the project to be evaluated. A sample Past Performance Evaluation Questionnaire is included at the end of this section. When completed, these forms shall be mailed, faxed or e-mailed to ATTN: Jacqueline Adekanbi, Galveston District Contract Specialist. A transmittal letter is not required, however, MARK the completed Questionnaire FOR: Solicitation No. W912HY-09-R- 0026. The completed Past Performance Questionnaires are excluded from the page limitation. The completed questionnaires may be received by the contracting office prior to closing, but not later than the closing date and time. It is the Contractor's responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have completed final CCASS evaluations.

The mailing and email address and fax is for completed questionnaires as follows:

USAED, Galveston Contracting Division/ATTN: Jacqueline Adekanbi 2000 Fort Point Road P.O. Box 1229 Galveston, TX 77553-1229

FAX No. (409)766-3010 EMAIL: jacqueline.b.adekanbi@usace.army.mil

6.1.1.4 Other Sources. The Government may contact sources other than those provided by the Offeror for information with respect to past performance. These other sources may include, but are not limited to, CCASS, telephone interviews with organizations familiar with the Offeror's performance, and Government personnel with personal knowledge of the Offeror's performance capability.

00 22 10 - 10

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

6.1.1.5 New Companies and Joint Ventures. New companies and joint ventures entering the marketplace (without relevant company experience) are reminded that if you or a significant subcontractor only have relevant and recent performance history as a part of a predecessor company, we may consider that past performance in our evaluation of performance risk. If no such information regarding predecessor companies is given, then the new company or joint venture shall be given a neutral rating.

7.0 TAB C –FACTOR 3 – KEY PERSONNEL CAPABILITIES AND EXPERIENCE

7.1 SUBMISSION REQUIREMENTS:

7.1.1 In addition to identifying the key project personnel for design and construction in the personnel organization chart, the Offeror shall provide a consolidated list of key personnel with the information listed below. For the purpose of this solicitation, it is requested that the team proposed be the team that will actually perform the work. If re-assignment of personnel is considered possible, provide alternate professionals in each assignment. Include key designers, whether employed by the prime or by a design subcontractor.

Name, position title Description of project responsibility (assignment) Indicate whether each individual has had a significant role in any of the cited project examples.

Name of firm Number of years with firm and with other firms Education/Degree(s)/Specialization Professional Registration(s)/Year and if registration is current

For each person provide a resume, using the Key Personnel Resume form located at the end of this section. As a minimum, include the following personnel

Prime Contractor’s project manager Design Project Manager, Designers of record for:

Civil Geotechnical

Electrical Structural Hydrology Landscape Architect

Registered Professional(s) with capabilities to address local permitted (e.g., sewer, water extensions, stormwater, etc.) throughout the region.

As a minimum for construction, include the following:

Project Manager Project Superintendent Scheduler Quality Control Manager Safety

By identifying these personnel, the Offeror is making a commitment that, barring unforeseen circumstances, they are personnel who will be assigned to the project. All key personnel shall have

00 22 10 - 11

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026 a minimum of 5 years professional experience. Key personnel submitted shall not be changed after award without the prior written approval of the Contracting Officer. In the event the selected firm decides to utilize personnel in the performance of this Contract for which resumes were not submitted prior to award, the firm shall, prior to the utilization of these personnel, submit their resumes to the Contracting Office for approval. The qualifications of the substituted personnel must be equal to or better than those whose resumes were submitted. The successful Offeror will be required to update the list of Key Personnel. Page Limitation for consolidated list is 10 pages, however, if charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. 11 x 17 inch sheets will be counted as 2 8-1/2 inch x 11 inch sheets. The resumes are excluded from the page limitation for this factor, however, each resume should be no more than 2 pages each.

8.0 TAB D – FACTOR 4 – ORGANIZATION AND MANAGEMENT APPROACH

8.1 SUBMISSION REQUIREMENTS:

8.1.1. This information considers the offeror’s organization and intended management approach to executing the design-build contract. Limit the plan to 10 pages or less clearly but concisely describing the organizational and management approach to project management and execution.

8.1.2. Subfactor (1) Organization: Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. The Offeror shall document unequivocal teaming arrangements with its design firms(s). A copy of the teaming or joint venture agreement(s) may be appended to the plan (not included in the page limitation). Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s).

Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including design and construction activities for each major feature (i.e., site work, geotechnical, structural). Identify the design firm(s) chosen for each project type, if not to be self-performed. Phase 2 offerors will be required to identify the specific firms to be utilized.

Describe the proposed management structure for the team, describing the how the design and construction process will be managed and the authorities and the delegations of authority within the team Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the D-B team firms, and with the list of key personnel to be provided under the Tab, “Key Personnel”.

8.1.3. Subfactor (2) Processes During Design and Construction: Describe interactions within the team and with the Corps of Engineers during the design. Discuss how the configuration management system will track and control design evolution and changes during design for quality control and to facilitate quicker Government reviews. Describe the role of the construction team members during design. Describe the type of Computer- Aided Design and Drafting (CADD) system to be used on the project. Describe the role and interaction of the design team with the construction team during construction, addressing, as a minimum, maintaining configuration management of the design during construction, including control and approval of revisions to the accepted design; requests for information; shop drawing and submittal reviews and approvals;

progress meetings; site visits, if any; contract completion, closeout, as-built and completion documentation.

00 22 10 - 12

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

8.1.4. Subfactor (3) Planning and Scheduling: Describe the time control capabilities and systems to be used to plan design and construction and how the schedule will be used to manage design and construction. Discuss internal procedures for handling delays to minimize time growth. In Phase 2, the offeror will develop a summary schedule. In Phase 1, the Government is interested in the offeror’s planning and scheduling capabilities.

8.1.5. Subfactor (4) Self-Performed Work: Generally describe the items the offeror will self-perform to comply with the requirements in of the specifications for self-performed work. The Phase 2 submission will require the offeror to document what work will be self-performed, using the definitions herein.

8.1.6. Subfactor (5) Quality Control: Describe the team’s quality control approach, corporate systems and capabilities to maintain quality control of the design and construction. Describe the proposed quality control organization, including the proposed staffing plan in accordance with Section 01 45 04.40 44 CONTRACTOR QUALITY CONTROL. There is no need to submit a quality control plan as the successful offeror will provide that after award. In Phase 1, the Government is interested in demonstrable capabilities to assure and control quality and how the offeror can achieve or exceed the contract’s minimum quality control system requirements.

00 22 10 - 13

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

PHASE ONE - PROPOSAL DATA SHEET SECTION 00 22 10

ATTACHMENT 1

1. Name of Solicitation:

2. Name of Firm:

Address:

Phone:

Fax:

E-mail:

DUNS # (used for accessing the Construction Contractor Appraisal Support System (CCASS) or A- E Contractor Administration Support System (ACASS) Database) Also provide any other assigned number that identifies the member firm(s) in the ACASS or CCASS databases. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

3. AUTHORIZED NEGOTIATORS: FAR 52.215-11 The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP) List names, titles, and telephone number of the authorized negotiator.

Name of Person Authorized to Negotiate: Negotiator’s Address:

Negotiator’s Telephone: Negotiator’s E-mail:

00 22 10 - 14

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME

CONTRACTOR SECTION 00 22 10 – ATTACHMENT 2

Provide the following information to show examples of projects your company constructed within the last five years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Project Represented_____________________________________________________

(b) Your Firm’s Name:___________________________________________________________

(c) Name of Project_____________________________________________________________

(d) Location of Project____________________________________________________________

(e) Owner:_____________________________________________________________________

(f) General Scope of Construction Project:

(g) Your Role (Prime, Joint Venture or Subcontractor, etc.) and Work Your Company Self- Performed:

(h) Construction Cost:________________________

(i) Extent and Type of Work You Subcontracted Out: _____________________

(j) Dates Construction: Began________________Completed_______________

(k) Your Performance Evaluation by Owner, if known:______________________

00 22 10 - 15

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN

CAPABILITY SECTION 00 22 10 – ATTACHMENT 3

Provide the following information to show examples of projects your company has designed within the last five years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Project Represented_____________________________________________________

(b) Your Firm’s Name:___________________________________________________________

(c) Name of Project_____________________________________________________________

(d) Location of Project____________________________________________________________

(e) Owner:_____________________________________________________________________

(f) General Scope of Construction Project:

(g) Summary of Your Role in Design of this Project, including implementing LEED:

(h) Identify Estimated (“E”) or Actual (“A”) Construction Cost:________________________

(i) Extent and Type of Work You Subcontracted Out: _____________________

(j) Dates Design” Began________________Completed_______________

(k) Dates Contruction Began ___________Completed _________

(l) Your Performance Evaluation, if known_____________________________________ (If either is “Yes”, attach an Explanation

(m) Owner’s Point of Contact for Reference (Name and Company): _____________________

(n) Current Telephone Number of Reference POC ___________________________________

00 22 10 - 16

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

PAST PERFORMANCE EVALUATION

QUESTIONNAIRE SECTION 00 22 10 – ATTACHMENT 4

1. Contractor/Name & Address (City and State):

2. Type of Contract: Fixed Price_______ Cost Reimbursement______ Other (Specify)__________________

3. Title of Project/Contract Number:

4. Description of Work:

5. Complexity of Work: High_____ Mid_____ Routine______

6. Dollar Value: _______________________________________

7. Location of Work:___________________________________________________

8. Date of Award:_____________________________________________________

9. Status: Active______(Please provide percent complete) Complete ____________(Please provide completion date)

10. Name and telephone number of Owner’s Technical Representative:______________________

QUALITY OF PRODUCT/SERVICE:

11. Please evaluate the Contractor’s performance in complying with contract requirements, quality achieved and overall technical expertise demonstrated.

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

00 22 10 - 17

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

12. To what extent were the Contractor’s reports and documentation accurate, complete and submitted in a timely manner?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

13. To what extent was the Contractor able to solve contract performance problems without extensive guidance from Owner counterparts?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

14. How well did the Contractor manage and coordinate subcontractors, suppliers, and the labor force?

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

00 22 10 - 18

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

CUSTOMER SATISFACTION:

15. To what extent were the end users satisfied with:

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

TIMELINESS OF PERFORMANCE

16. To what extent did the Contractor meet ;the required schedules/

Excellent Good Satisfactory Marginal Unsatisfactory

Remarks:

17. If given the opportunity would you work with this Contractor again?

Yes__________ No ________ Not sure __________

OTHER EMARKS:

18. Please use the space below to provide other information related to the Contractor’s performance. This may include the Contractor’s selection and management of subcontractors, flexibility in dealing with contract challenges, their overall concern for the Owner’s interest project awards received, etc.

END OF QUESTIONNAIRE

00 22 10 - 19

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

VOLUME 2 - TAB C

FACTOR 3

ATTACHMENT 5

KEY PERSONNEL RESUME

CONSTRUCTION

Provide information, listed below, on separate sheets showing qualifications of (as a minimum):

Project Manager; Project Superintendent; Scheduler; Quality Control Manager; Safety. Use continuation sheets, if needed. (This is a sample format, form may be tailored.)

a. Your Name and Title

b. Your Assignment on this Project

c. Name of Your Firm

d. No. of Years With this Firm With other Firms

e. Education: Degree(s)/Year/Specialization

f. Active Registration, if any: No. State(s)

First Year/ Current Year /

g. Describe Your Specific Experience and Qualifications Relevant to this Project:

00 22 10 - 20

SWD DB/DBB IDIQ MATOC, SDVOSB RFP No. W912HY-09-R-0026

00 22 10 - 21

VOLUME 2 - TAB C

FACTOR 3

ATTACHMENT 6

KEY PERSONNEL PRIME OR SUBCONTRACTOR RESUME

DESIGN

Provide information, listed below, on separate sheets showing qualifications of: design project manager, designers of record for Civil, Geotechnical, Electrical, Structural, Hydrology and Landscape Architect. (Registered iaw Section 00 73 00 SCR 15). Use continuation sheets, if needed. (This is a sample format, form may be tailored.)

a. Your Name and Title

b. Your Assignment on this Project

c. Name of Your Firm

d. No. of Years With this Firm With other Firms

e. Education: Degree(s)/Year/Specialization

f. Active Registration, if any: No. State(s)

First Year/ Current Year /

g. Describe Your Specific Experience and Qualifications Relevant to this Project:

SECTION 00 22 20

PROPOSAL EVALUATION AND

CONTRACT AWARD BEST VALUE

TRADE OFF

00 22 20 - 1

PROPOSAL EVALUATION AND CONTRACT AWARD BEST VALUE TRADE OFF

1.0 ELIGIBITIY FOR CONTRACT AWARD

2.0 SOURCE SELECTION PROCESS

3.0 PHASE 1 RELATIVE IMPORTANCE OF PRICE AND THE TECHNICAL

EVLAUTION FACTOR

4.0 VOLUME 2 FACTOR 1 – SPECIALIZED EXPERIENCE

4.1 EVALUATION CRITERIA

5.0 VOLUME 2 FACTOR 2 – PAST PERFORMANCE

5.1 EVALUATION CRITERIA

6.0 VOLUME 2 FACTOR 3 – KEY PROJECT PERSONNEL CAPABILITIES AND

EXPERIENCE

6.1 EVALUATION CRITERIA

7.0 VOLUME 2 FACTOR 4 – ORGANIZATION AND MANAGEMENT APPROACH

7.1 EVALUATION CRITERIA

8.0 VOLUME 1 FACTOR 5 – FINANCIAL CAPABILITY

8.1 EVALUATION CRITERIA

9.0 PHASE 1 FACTORS EVALUATION FACTORS AND RELATIVE IMPORTANCE

TO EACH OTHER

10.0 PHASE 1 EVALUATION PROCEDURES

10.1 SOURCE SELECTION EVALUATION BOARD (SSEB)

10.2 EVALUATION

10.3 DEFINITIONS

10.4 EVALUATION AND RATING SYSTEM

10.5 PERFORMANCE RISK RATINGS

10.6 GO/NO-GO RATINGS

00 22 20 - 2

11.0 PRICE - PHASE 2

12.0 BASIS FOR AWARD

00 22 20 - 3

PROPOSAL EVALUATION AND CONTRACT AWARD

BEST VALUE TRADE OFF

1.0 ELIGIBILITY FOR CONTRACT AWARD

In accordance with the Federal Acquisition Regulations (FAR), no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2.0 SOURCE SELECTION USING THE BEST-VALUE PROCESS

The Government will select the offerors that represent the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between cost/price and technical (“non-cost”) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative assessment of proposals against all source selection criteria in the solicitation.

3. 0 PHASE 1 RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL

EVALUATION FACTORS

For Phase 1 and Phase 2 combined, all evaluation factors other than cost or price, when combined, are more significantly more important than price. The Government is concerned with achieving the most advantageous balance between technical merit (“quality”) and price to the Government (i.e., the price). The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.

PHASE 1 EVALUATION CRITERIA AND BASIS OF SELECTION

4.0 VOLUME 2 – FACTOR 1 – SPECIALIZED EXPERIENCE

4.1 EVALUATION CRITERIA:

4.1.1 The following extent of experience subfactors are in order of relative importance (Subfactor

(1) is slightly more important than Subfactor (2)) :

(1) Prime/construction Contractor

(2) Design firm(s) and subcontractor design consultants

4.1.2.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .