Amendment0005.pdf

PDF 194 KB Posted

Attached to
IDIQ MATOC for Horizontal Construction Services SWD SDVOSB Pool of Contractors
Solicitation number
W912HY-09-R-0026
Issued by

About this file

Amendment 0005 for W912HY-09-R-0026

View the file

Other files

File Type Posted
Amendment0008.pdf PDF
Amendment0007.pdf PDF
Amendment0006.pdf PDF
Amendment0004.pdf PDF
Amendment0003.pdf PDF
Pre-Proposal conference.ppt PPT presentation
sign-in sheet.pdf PDF
Amendment0002.pdf PDF
Amendment0001.pdf PDF
FINAL.RFP.09-R-0026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

RFP for IDIQ MATOC, Design-Build and Design-Bid-Build Projects for Horizontal Construction Services, Southwestern Division (SWD), Service-Disabled Veteran-Owned Small Business Pool of Contractors, for which proposals are due on 30 Oct 09 is amended as follows:

1. Section 00 21 00, Instructions, Conditions and Notices to Offerors, Section 3.1.5 TAB E- FACTOR 5: FINANCIAL CAPABILITY (E.G. Preaward Information) is replaced with the following:

3.1.5 TAB E- FACTOR 5: FINANCIAL CAPABILITY

Pre Award Information (e.g. Preaward Information)

In accordance with FAR 9.103(a): contracts shall be awarded to responsible prospective contractors only. “To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform the contract or the ability to obtain them. As an aid in assessing responsibility, the offeror shall notify their bank/suppliers that the Corps of Engineers may contact them, and shall authorize the bank/suppliers to release the following information regarding the Offeror’s account. If a written authorization is required by their bank, Offerors shall provide that authorization with their proposal.

Name and telephone number of bank’s point of contact Number of years Business has been conducted with each bank Types of open accounts (checking, Loans, etc.)

Balance of current accounts (the banks will provide a “range of figures” for this Information, such as, medium five-figure range) Means by which loans are secured and if paid as agreed Point of contact and telephone number of three (3) different suppliers

For the purpose of evaluating the preaward survey information submitted hereunder:

Preaward survey data will be evaluated and scored, as it relates to the probability of The offeror successfully accomplishing the proposed effort.

The Government will use pre-award survey data provided by the offeror and data obtained from other sources to perform this assessment.

0004 - 2

M3CTXJBA

Typewritten Text

00 73 00 Revised 10-5-09 (AMD0001).pdf
(8) SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR – JUL 2001
(9) PROTECTION OF MATERIAL AND WORK – AUG 1997
(11) APPROVAL OF MACHINERY AND EQUIPMENT
(29) ELECTRONIC SUBMITTAL OF OFFEROR’S PROPOSAL
IDCode:
Page: 1
Pages: 2
AmendNo: 0005
EffDate: 10/21/09
ReqNo:
ProjNo:
IssCode:
IssuedBy: U. S. ARMY CORPS OF ENGINEERS

GALVESTON DISTRICT OFFICE

P. O. BOX 1229

GALVESTON, TEXAS 77553-1229

AdmCode: CT
AdminBy: U. S. ARMY CORPS OF ENGINEERS

GALVESTON DISTRICT OFFICE

P. O. BOX 1229

GALVESTON, TEXAS 77553-1229

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: W912HY-09-R-0026
AmendDate: 10/21/09
ModNo:
ModDate:
NoCopies:
Amended: Off
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: No
Copies: 1
Descript: IDIQ MATOC for Horizontal Construction Services, Southwestern Division (SWD), Service-Disabled Veteran-Owned Small Business Pool of Contractors for which proposals are due on 30 Oct 2009 at 2:00 P.M.CT is amended as follows:

This amendment shall be attached to and become a part of the solicitation.

CONTINUED

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off

File details come from the government source that posted it. Updated .