KTR Questions Responses 1.docx
DOCX document 16 KB Posted
- Attached to
- UMSB HEC Asphalt Replacement
- Solicitation number
- W912HQ26QA032
About this file
This file is a Questions and Responses document addressing contractor inquiries related to Solicitation W912HQ26QA032 for asphalt and concrete pavement services. The document provides clarifications on the solicitation requirements but does not specify the individual questions asked or detailed responses provided within the excerpt provided.
The underlying solicitation concerns the U.S. Army Corps of Engineers Mission Support Battalion's requirement for concrete curb, gutter, sidewalk, asphalt pavement reconstruction and paving services at the Humphreys Engineer Center (HEC) in Alexandria, Virginia. The project scope falls within the $500,000 to $1,000,000 range and will be awarded under Simplified Acquisition Procedures. A mandatory site visit is scheduled for Monday, September 21, with check-in beginning at 9:00 AM EST at HEC Building 2591 Bunker parking lot. Contractors must register with Contract Specialist Giuseppe Mirizzi no later than Friday, September 18 at 8:00 AM EST and must be U.S. citizens or nationals with valid government identification and driver's licenses. Sealed quotes are due electronically by Friday, September 25, with email submission required; late submissions will be processed in accordance with FAR 52.212-1(c).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Paving Answers on 23 SEPT..docx | DOCX document | |
| KTR Questions Responses 4.docx | DOCX document | |
| NAVFAC USACE PAST PERFORMANCE QUESTIONNAIRE 26 March 2024.pdf | ||
| KTR Questions Responses 3.docx | DOCX document | |
| KTR Questions Responses 2.docx | DOCX document | |
| UMSB Facility Pavement Replace Site Pictures.pdf | ||
| Solicitation - W912HQ26QA032 (2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SIZE: $500K to $1M (per FAR Part 36)
Q: Please confirm whether a bid guarantee/bid bond is required for this project.
A: No, bid guarantee/bid bond is not required.
Q: Please confirm whether both a Performance Bond and Payment Bond are required.
A: Yes, performance and payment bonds are required.
Q: If Performance Bond and Payment Bond are required, please confirm the required amount for each bond and the period for which the bonds must remain in effect, including any required period following project completion and acceptance.
A: Required amount is 100% of contract price. The bonds must be in effect from project commencement to a year after project competition. The bond is required no later than 10 days after contract award, but before project commences.
Q: The solicitation states that a representative from the firm must attend the site visit. As we intend to perform the work through a subcontractor, please confirm whether attendance by the subcontractor’s representative would satisfy this requirement, or whether a representative of the prime contractor must also attend.
A: The prime contractor required is to have a representative at the site visit. The prime contractor must perform at least 25% of the work.
Q: FAR 52.236-6 requires the Contractor to directly superintend the work or assign a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. If the prime contractor uses a subcontractor to perform the work, please confirm whether the subcontractor’s superintendent may satisfy this requirement, or whether the prime contractor must provide its own superintendent.
A: The prime must have a superintendent on site.