UMSB Facility Pavement Replace Site Pictures.pdf
PDF 307 KB Posted
- Attached to
- UMSB HEC Asphalt Replacement
- Solicitation number
- W912HQ26QA032
About this file
This document contains aerial imagery and site maps depicting infrastructure improvement phases for a federal facility project. The maps show Phase 1A and Phase 1B of construction work at what appears to be a federal building or installation.
Phase 1A includes full depth pavement work (shown in blue) and new curb and gutter installation (shown in green) along the eastern side of the facility's access road. Phase 1B expands the scope to include roadway reconstruction (shown in red) and repair and replacement (R&R) sidewalk work (shown in yellow) along the main access route and around the facility perimeter. The project involves standard civil infrastructure improvements typical of federal facility maintenance and modernization efforts, including asphalt pavement replacement, drainage improvements via new curb and gutter, and pedestrian sidewalk upgrades. The phased approach allows for staged implementation of these improvements across the facility's access infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Paving Answers on 23 SEPT..docx | DOCX document | |
| KTR Questions Responses 4.docx | DOCX document | |
| NAVFAC USACE PAST PERFORMANCE QUESTIONNAIRE 26 March 2024.pdf | ||
| KTR Questions Responses 3.docx | DOCX document | |
| KTR Questions Responses 2.docx | DOCX document | |
| KTR Questions Responses 1.docx | DOCX document | |
| Solicitation - W912HQ26QA032 (2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .