About this file

This document provides training slides on crypt inspection for the Ft. Jackson Cemetery Expansion project solicited under solicitation number W912HP19R4000 by the Department of the Army Corps of Engineers Engineering District Charleston. The slides cover what comprises a crypt, including the exterior structure, interior shelf, lid, and lifting devices. Common problems seen in crypts like cracks, spalling, voids, discoloration, and exposed steel are defined, along with acceptable limits. Procedures for accepting, rejecting, or flagging crypts are presented. Potential issues that can arise during manufacturing, transportation, unloading, installation, numbers painting, backfill, and other stages are reviewed, along with examples of resulting damage seen. Repair options are noted to be limited.

View the file

Other files for this federal contract opportunity

Other files attached to Ft. Jackson Cemetery Expansion, newest first.
File Type Posted
B.08.03 19R4000 Amendment 2 Spec Section 01 45 35 (edited 1.3.2020) 1-7-2019.pdf PDF
B.08.03 19R4000 Amendment 2 Tab L (Updated - 1.6.2020).pdf PDF
B.08.03 19R4000 Amendment 2 Environmental Assessment for Cemetery 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 Water Analysis 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 E-Mail Bidder Inquiries and Responses 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 Tab D (Updated - 1.6.2020).pdf PDF
B.08.03 19R4000 Amendment 2 Appendix C (Sheet C-505) 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 PrecastConcBurialCrypts 6.1.2013.doc DOC document
B.08.03 19R4000 FINAL AMENDMENT 2 1-6-2020.pdf PDF
B.07.01 19R4000 Pre Proposal Site Visit Sign In Sheet 12-12-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Bidder Inquiry Responses 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 32 01.00 10 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Irrigation Controller 12-23-2019.jpg JPG image
B.08.03 19R4000 Amendment 1 Appendix C (Phase 2 Reference) 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 2 Wire Decoder Module 12-23-2019.jpg JPG image
B.08.03 19R4000 Amendment 1 Precast Concrete Cyst Specs 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 45 00.00 10 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 45 35 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Pump controller 12-23-2019.jpg JPG image
B.08.03 19R4000 Amendment 1 12-23-2019.PDF PDF
B.08.03 19R4000 Amendment 1 07-437 GEO-REPORT 12-23-2019.PDF PDF
A.02.16 19R4000 Appendix D 12-3-2019 .pdf PDF
B.08.02 19R4000 Final Released Solicitation 12-3-2019.pdf PDF
A.02.16 19R4000 Appendix A 12-3-2019 .pdf PDF
A.02.16 19R4000 FINAL FJNC RFP 12-3-2019 .pdf PDF
A.02.16 19R4000 Appendix B 12-3-2019 .pdf PDF
A.02.16 19R4000 Appendix F 12-3-2019 .pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT JACKSON NATIONAL CEMETERY GRAVESITE EXPANSION PHASE II

Columbia, SC

Appendix E

Crypt Inspection Training Slides

Introduction to Crypt

Inspection

Case Study of Jefferson Barracks

National Cemetery, Section 1JJ Inspector: Chris Brandriet

Christopher.Brandriet@Jacobs.com

What Comprises a Crypt?What Comprises a Crypt?

• Exterior Structure or “Box”Exterior Structure or Box

• Interior Shelf

Lid d Lifti D i “D B ”• Lid and Lifting Devices or “Dog Bones” and caps.

• Identification, Numbers painted on the tops and inside

• All Need to be present on an approved cryptyp

Numbers on Top and Inside

Lid Lifting Devices

Interior Shelf

Exterior Structure / Box

Interior Shelf

Most Common Problems and

A bl Li iAcceptable Limits

• Cracks

– 1/32” or greater, or cracks extending through wall results in rejection

• Spalling or Chips

– Chips ¼” or larger, spalling more than 1 SF, results in repair / rejection

• Voids

– ¼” and smaller are acceptable

• Discoloration

– Normal discoloration acceptable

• Form

– Form joint marks are acceptable

• Age out of Form

– Verify cure time, 11 days in St Louis, MO. Confirm delivered crypts meet.

• Exposed Steel

– Repair / Reject

How to Accept Reject or FlagHow to Accept, Reject, or Flag

• AcceptAccept

– Initial Permanent, exposed side

• RejectReject

– “X” permanent exposed sides and problem area, remove from site, Lid may be salvagedy g

• Flag

– Mark on Lid and exposed side for interior p inspection

• Spot Checks

RepairsRepairs

• Not many successful repairsNot many successful repairs

– Hairline cracks and small voids can be filled

Exposed steel can be covered– Exposed steel can be covered

– “Bug Holes” can be filled

Process on Site and How Problems

A iArise

• Ship From Manufacturing FacilityShip From Manufacturing Facility

• Unload from Trucks via Front End Loader

I t ll t Fi l L ti• Install to Final Location

• Number Painting on Inside and Tops

• Backfill

Shipping from Manufacturing

F iliFacility

• Check lids for damage from truck vibrationCheck lids for damage from truck vibration and bouncing

• Cracks from tie down locations• Cracks from tie down locations

• Manufactured adequately

Unloading From TruckUnloading From Truck

• Loading and Unloading DamageLoading and Unloading Damage

– Collision damage, Corners, “Push-in” Cracks

• Bottom Fork DamageBottom Fork Damage

• Placement for Inspection

– Preferably all sides and top open for visible inspectiony p p p

– Flashlight for times they are not all open

– Walk tops and flashlight down sides if closed in

• Flag for interior inspection once installed if any doubt of problems.

InstallationInstallation

• Cable Hold DamageCable Hold Damage

• Lid Shift and Crack

Numbers Painting on the Inside d T f Cand Tops of Crypts

• Lids lifted at each crypt to paint numbersLids lifted at each crypt to paint numbers on the inside

Damage from lifting lids– Damage from lifting lids

• Frozen Lids

• Only 2 lifting points used, unbalanced lidOnly 2 lifting points used, unbalanced lid

• Pressure on fronts leads to cracks and “push outs”

• Paint Sticking?Paint Sticking?

• Verify numbers match on Tops and Inside

BackfillBackfill

• Stockpile away from sides of cryptsStockpile away from sides of crypts

– Reduce Lateral Load

Correct Depth of Material• Correct Depth of Material

Miscellaneous IssuesMiscellaneous Issues

Questions ?