This document contains a checklist for final crypt inspection at Fort Jackson National Cemetery in Columbia, South Carolina. The checklist includes verifying grid markers, storm line inlets, cleanouts, crypt numbering, irrigation system functionality, sod establishment, tree and shrub planting, delivery of maintenance manuals and as-built drawings, site furnishings, hydrant equipment, and signage installation.

The related federal contract opportunity is solicitation number W912HP19R4000 for the Fort Jackson Cemetery Expansion project. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Charleston for expanding burial crypt capacity at Fort Jackson National Cemetery.

View the file

Other files for this federal contract opportunity

Other files attached to Ft. Jackson Cemetery Expansion, newest first.
File Type Posted
B.08.03 19R4000 Amendment 2 Spec Section 01 45 35 (edited 1.3.2020) 1-7-2019.pdf PDF
B.08.03 19R4000 Amendment 2 Appendix C (Sheet C-505) 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 PrecastConcBurialCrypts 6.1.2013.doc DOC document
B.08.03 19R4000 FINAL AMENDMENT 2 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 Tab L (Updated - 1.6.2020).pdf PDF
B.08.03 19R4000 Amendment 2 Environmental Assessment for Cemetery 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 Water Analysis 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 E-Mail Bidder Inquiries and Responses 1-6-2020.pdf PDF
B.08.03 19R4000 Amendment 2 Tab D (Updated - 1.6.2020).pdf PDF
B.08.03 19R4000 Amendment 1 Irrigation Controller 12-23-2019.jpg JPG image
B.08.03 19R4000 Amendment 1 Appendix C (Phase 2 Reference) 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 2 Wire Decoder Module 12-23-2019.jpg JPG image
B.08.03 19R4000 Amendment 1 Precast Concrete Cyst Specs 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 45 00.00 10 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 12-23-2019.PDF PDF
B.08.03 19R4000 Amendment 1 07-437 GEO-REPORT 12-23-2019.PDF PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 45 35 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Pump controller 12-23-2019.jpg JPG image
B.07.01 19R4000 Pre Proposal Site Visit Sign In Sheet 12-12-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Bidder Inquiry Responses 12-23-2019.pdf PDF
B.08.03 19R4000 Amendment 1 Spec Section 01 32 01.00 10 12-23-2019.pdf PDF
A.02.16 19R4000 Appendix A 12-3-2019 .pdf PDF
A.02.16 19R4000 Appendix E 12-3-2019 .pdf PDF
A.02.16 19R4000 Appendix B 12-3-2019 .pdf PDF
A.02.16 19R4000 Appendix F 12-3-2019 .pdf PDF
A.02.16 19R4000 FINAL FJNC RFP 12-3-2019 .pdf PDF
B.08.02 19R4000 Final Released Solicitation 12-3-2019.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT JACKSON NATIONAL CEMETERY GRAVESITE EXPANSION PHASE II

Columbia, SC

Appendix D

QAR Final Crypt Inspection Checklist

FORT JACKSON NATIONAL CEMETERY GRAVESITE EXPANSION PHASE II

Columbia, SC

Appendix E Page 1 of 1

CHECKLIST FOR FINAL INSPECTION

For

CRYPT PROJECTS

• Verify grid markers have survey crosshairs. Measure at random from crosshairs to crosshairs to verify design distances.

• Verify each storm line inlet is installed per drawings.

• Verify each cleanout is installed per drawing.

• Randomly verify that a crypt number is numbered correctly.

• Test each irrigation zone. Ensure each throws over the headstone. Ensure each head is installed per detail.

• Verify each irrigation box. Ensure water-proof plastic protector is installed at terminations.

• Verify sod is established and green.

• Inspect each tree or shrub to ensure they are lively, and planted per plant detail.

• Ensure maintenance manuals are delivered.

• Ensure As-built drawings are delivered.

• Ensure 20 lids, 3 lid lifting devices, 3 shelf lifting devices are delivered per specifications.

• Verify vase stations (site furnishings) are installed per drawings. Is laminar flow device installed on each hydrant? Is flower vase regulation labeled per approved submittal?

• Verify signage is installed per drawings.