This document provides details on an upcoming federal contract opportunity for the construction of a Cyber Instructional Facility and Network Center at Fort Gordon, Georgia. The U.S. Army Corps of Engineers Savannah District will issue request for proposal number W912HN19R3004 with an anticipated release date of March 19, 2019 and closing date of April 19, 2019. The project scope involves constructing a Top Secret/Sensitive Compartmented Information level facility for instructional areas, research center, administrative spaces, and network operations. The contract will be a firm-fixed-price design-bid-build construction contract between $25-100 million. Proposals will be evaluated using lowest price technically acceptable with experience and past performance factors. The North American Industry Classification System code is 236220 and there is no set-aside designated.

View the file

Other files

File Type Posted
B.08 W912HN19R30040013 Conformed.pdf PDF
B.08 W912HN19R30040013.pdf PDF
amd12.pdf PDF
19R3004vol1.PDF PDF
19R3004vol5.pdf PDF
19R3004vol1.pdf PDF
amd11.pdf PDF
amd10.pdf PDF
19R3004vol1.PDF PDF
19R3004vol1.PDF PDF
amd9.pdf PDF
amd8.pdf PDF
19R3004vol1.PDF PDF
19R3004vol1.PDF PDF
amd7.pdf PDF
W912HN-19-R-3004_AMD6_V1B.PDF PDF
W912HN-19-R-3004_AMD6_V1C.PDF PDF
W912HN-19-R-3004_AMD6_V1D.PDF PDF
W912HN-19-R-3004_AMD6_V1E.pdf PDF
amd6.pdf PDF
19R3004vol1.PDF PDF
W912HN-19-R-3004_AMD6_V1A.PDF PDF
W912HN-19-R-3004_AMD5_V1E.PDF PDF
W912HN-19-R-3004_AMD5_V1A.PDF PDF
W912HN-19-R-3004_AMD5_V1B.PDF PDF
19R3004vol3.PDF PDF
amd5.pdf PDF
19R3004vol1.PDF PDF
19R3004vol2.PDF PDF
19R3004vol4.PDF PDF
W912HN-19-R-3004_AMD5_V1D.PDF PDF
W912HN-19-R-3004_AMD5_V1C.PDF PDF
19R3004vol5.PDF PDF
W912HN19R30040004.pdf PDF
amd3.pdf PDF
W912HN19R3004_Amendment_0002.txt TXT text file
W912HN19R3004_Specs_and_Drawings.txt TXT text file
W912HN19R3004.pdf PDF
Industry_Day_sign-in_sheet.pdf PDF
CCoE_INDUSTRY_DAY_BRIEFING-_Final_Version_30_Jan_2019.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Meeting Minutes

USACE Savannah District Industry Day – Fort Gordon CCOE Campus

Meeting Location: Doubletree Hotel, Augusta GA

Date/Time: 31 Jan 2019 1300 hr

1. Introduction provided by COL Ruder

2. Program Overview presented by Jose Diaz

3. Programmatic Schedule presented by Jose Diaz

4. Project Specific Information presented by Jose Diaz

5. MCA1 Acquisition Strategy provided by Andrew Page

6. Q & A Session (Questions taken now, and answers posted on FedBizOPs)

Is Acquisition Strategy one step or two step process?

Is project located inside NSA secure area? NO

Does $60M past performance threshold shown include requirement for SCIF construction? Yes

Does past performance criteria allow Renovation projects? As currently written, Past performance criteria is for all new construction only.

7. Closing Remarks provided by Jose Diaz

8. Written Questions

What will the classification of the bid documents be? Submitted by Bill Winslow from

AECOM