This document provides details for a forthcoming solicitation seeking construction services. The U.S. Army Corps of Engineers Savannah District will issue Request for Proposal W912HN19R3004 for construction of a Cyber Instructional Facility and Network Center at Fort Gordon, Georgia. The project scope includes constructing a Top Secret/Sensitive Compartmented Information level Automation-Aided Instructional area, Mission Command Facility, and General Purpose Administrative space along with supporting facilities. The subsequent contract will be a firm-fixed-price design-bid-build construction contract with a base bid and optional line items. The period of performance is 780 calendar days from notice to proceed. The solicitation will utilize a lowest price technically acceptable source selection evaluating corporate experience and past performance. The anticipated release date is 19 March 2019 with a closing date of 19 April 2019. The North American Industry Classification System code is 236220 and the magnitude is estimated between $25-100 million.
Amd 11
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HN19R3004
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project MCA1, Fort Gordon A. This solicitation is hereby amended: See Summary of Changes.
B. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN19R3004
X 9B. DATED (SEE ITEM 11)
31-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2019
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0011
A. CONTRACT CHANGES: Clarification on additive and deductive bid items.
B. TECHNICAL SPECIFICATION CHANGES: The added Section listed below (added by Amendment No. 0011) is hereby added to and made a part of the solicitation. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Added Section 32 01 16.71
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
D. Bidder RFI responses included.
E. Exterior Sun Control Devices included.
BIDDER RFI RESPONSES
Government Responses to Bidder Requests for Information are provided below.
1. Amendment 0009 states that the Wage Determination, GA20190153, 02/15/2019 GA153, is modified, but it is the exact Wage Determination we were instructed to use to prepare our original proposal. Please clarify what modifications apply.
ANSWER: Offerors shall use the latest version of Wage Determination, GA190153 02/15/2019, GA153. Wage determinations are available at https://beta.sam.gov.
2. CLIN 0005 states to resurface existing parking lot.
a. Please provide re‐surfacing specification.
ANSWER: Attached is specification section 32 01 16.71 ‐ Cold Milling Asphalt Pavement. This will be used to remove the top 2 inches of existing asphalt pavement. Use Spec 32 12 17 – Hot Mix Bituminous Pavement for the new asphalt surface pavement.
b. The parking lot contains several utility lines “to be removed” according to Sheet CD101. Do we still remove these utilities or simply abandon in place?
ANSWER: Existing utilities within the parking lot will either remain in place, and not be removed (UGP for lighting) or can be abandoned in place (potable and fire water) as needed for construction of the new utilities.
c. CLIN 0007 states to replace the terra‐cotta rain screen with a brick cavity rain screen. Are we to provide the final design ourselves?
ANSWER: The substitution quantity of brick cavity wall system should match the quantity of terra‐cotta panel. If CLIN is accepted, the Government will provide updated drawings and specs after award.
d. CLIN 0008 states to replace the terra‐cotta sunshades with aluminum sunshades. Are we to provide a design for approval including connections?
ANSWER: Please use the attached example from Dams Incorporated as a basis of design. Instead of the 2x2 profile used at the Pavilion, the aluminum sunshades at the main building will have the 4x2 profile to match the terra‐ cotta sunshades. If CLIN is accepted, the Government will provide updated drawings and specs after award.
3. CLIN 0012 states to remove the back painted glass in specific locations. What is to be installed as a replacement?
ANSWER: Accent Paint, similar in quality to PT‐2. (Scuffmaster)
4. CLIN 0014. Do you wish a non‐slip finish to be added to the concrete sealer in these locations?
ANSWER: No.
EXTERIOR SUN CONTROL DEVICES
1 SUNSHADE & GRILLE OPTIONS
Our expanded options maintain functional benefits while offering new design choices .
BLADE l1 FILL OPTIONS
Leading-edge blade configuration may be altered to serve as a trim or fascia member.
Full Airfoil Z Blade Flat Blade
2pc Snap Airfoil1FG.ia.,.,o1-o
Round Tube
Rectangular Tube
Diamond
S Blade
Parallelogram
Egg Crate Grille
Perforated
Hundreds of options and sizes are available .
FASCIA OPTIONS
Our extruded aluminum fascia components can be utilized in the design to maintain visual continuity or provide contrast to adjacent elements.
Large Tapered Bullnose Round Bullnose Square Bullnose
Tapered Bullnose
Rectangle Channel
Hundreds of options and sizes are available .
Sharp Pointed C Channel
Round Tube
OUTRIGGER OPTIO1 S
Outrigger shape can be selected by complimenting the infill, brackets and fascia chosen. Outri ggers may also be made from tube stock as opposed to flat bar in order to achieve a more robust outrigger look.
Bullnose Curve Tuba
Rounded Tapered Wadga
Source Selection Information – See FAR 2.101 and 3.104
1 1, . - ...1 - - ..l - - L - - .6.: _ _ _ - - ..I _;
_ -•- ..... . .... : I ....LI
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been modified:
1. Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at:
www.projnet.org\projnet Bidder Inquiry Key: VJ3634-G6KGS2
All questions regarding this solicitation must be submitted in writing through ProjNet no later than 10 calendar days prior to the date established for receipt of proposals as shown in this solicitation. The Government reserves the right to not respond to questions/inquiries received after this date. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register in the system. To self-register, go to the web page, click bid tab, select bidder inquiry, select agency USACE, enter the key for this solicitation below, and your email address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question after it has been processed by our technical team.
2. If an Offeror believes the requirements in this solicitation contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted to the Contracting Officer through the contracting POC identified in this solicitation.
3. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals in response to the RFP, the Government may request a price breakdown of the Contract Line items.
The Government will provide details on where and how to send the breakdown if required. This information will not be needed sooner than three working days after the proposal submission due date. This information is not an opportunity for a firm to revise its non-price or price proposal.
Firms are cautioned to distribute direct costs, such as material, labor equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations.
SECTION 00 21 00 - INSTRUCTIONS
PART II
SECTION V
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for the construction of a Training, Research & Network Center at Fort Gordon, GA. This will be a Firm-Fixed Price (FFP) contract.
1.2 The purpose of the Source Selection Plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Contracting Officer (KO) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2.)
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal? The requirement will be advertised under full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors WILL NOT be evaluated for any factor. Information about firms that are part of a joint venture will be considered when the joint venture is the Offeror.
2.3 Offerors shall submit their proposal to the address shown Proposal and Bid Bond Submission Instructions in Section 00 21 00.
3. GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents.
Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Electronic Submissions.
3.3.1 Written material shall be on 8 ½ x 11 inch paper size, using no smaller than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
3.3.2 Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offeror’s
Company name and the volume (i.e. W912HN19R3004 USACE_Volume_I.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
3.4 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I Price/Representations/Certifications
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00 10 00 – Proposal Pricing Schedule (Factor 3 – Price)
TAB C - Section 00 45 00– Representations and Certifications
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section.
Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture, it must be submitted. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB E – Bid Bond – See Clause 52.228-1 and any other notes, for required bond information.
The Offeror is required to submit a bid bond. Photocopied or electronically scanned bid bonds are not acceptable and may lead to the rejection of the proposal as non-responsive. Offerors shall use the most recent form SF24 (REV. 8/2016).
TAB F – Financial Information (the last three years financial statements, Annual Reports, Dun and Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. The Offeror shall also provide a Subcontracting Plan in accordance with FAR Clause 52.219-9, Small Business Subcontracting Plan.
TAB G – Joint Venture Agreement, if applicable. See paragraph 2.1
VOLUME II Technical Submittal
TAB H – Past Performance Questionnaires Summary Sheet (Attachment 2) and Past Performance Questionnaires (PPQ) (Attachment 3). These forms will be used to evaluate both FACTOR 1 Corporate Relevant Specialized Experience and FACTOR 2 Past Performance.
4. FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE
4.1 SUBMISSION REQUIREMENTS:
4.1.1 Using the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaires (PPQ) (Attachment 3), the Offeror shall demonstrate experience in performing projects meeting the requirements described in paragraphs below. If the Offeror is a joint venture, the projects did not have to have been performed by the joint venture submitting the offer. These projects could have been performed by either company in the joint venture.
Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, were the prime contractor and played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs and continuation sheet, if used, submitted for this Factor clearly describe the relevant characteristics of the project.
4.1.2 Offerors shall submit a minimum of three (3) recent, relevant projects. If an Offeror submits more than three (3) total project examples, only the first three (3) will be evaluated. The projects submitted for consideration in Factor 1 shall be the same projects submitted for evaluation in Factor 2.
4.1.3 Recent, relevant projects:
4.1.3.1 Renovation or a combination of renovation and new construction of any of the following facilities: administrative/office buildings, training/classroom buildings, headquarters/operational facilities, hospitals, or schools; and, a minimum contract value of $50 million. Projects must be \ successfully complete, or fully designed and at least 50% construction progress complete within six (6) years preceding the date of this solicitation.
The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum contract value.
4.1.3.2 New vertical construction of any of the following facilities: administrative/office buildings, training/classroom buildings, headquarters/operational facilities, hospitals, or schools; and, a minimum contract value of $50 million. Project must be \ successfully complete, or fully designed and at least 50% construction progress complete within six
(6) years preceding the date of this solicitation. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum contract value.
4.1.3.3 Of the recent and relevant projects submitted, one (1) project that contains sensitive compartmentalized information facility (SCIF).
4.1.3.4 Of the recent and relevant projects submitted, one (1) project that was built on a Department of Defense property/installation or other Federal Government location that required all of the following: controlled access to the property or the installation; background checks or clearances by the Government of the contractor and subcontractor personnel; and controlled access to a secured construction site.
4.1.3.5 It is permissible for a project to count toward each set of requirements as long as the entity that performed the work meeting each set of requirements will be performing that work under this solicitation. If the Offeror is a joint venture, the projects do not have to be performed by the joint venture submitting the offer. Those projects could have been performed by either company in the joint venture. Teaming arrangements are NOT acceptable.
4.1.4 The project description on the PPQ shall clearly describe the projects. The Government will not assume any project characteristics that are not specifically identified and described.
The Offeror may attach a continuation sheet to the PPQ if needed consisting of one (1) page to describe how the project contained the elements described above and meets the requirements of this factor. The submission must contain sufficient information for the government to determine whether the project meets the requirements of 4.1.3.
4.1.5 The PPQ must provide a Point of Contact for the Client. If the Government is unable to verify the information provided on the PPQs with the client Point of Contact, or by other sources available (e.g. CPARS), the Government reserves the right to disregard that project when evaluating the Offeror’s experience.
4.2 EVALUATION CRITERIA
4.2.1 The Offeror’s submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. To meet the minimum requirements for this Factor:
A minimum of one (1) project must meet the requirements of 4.1.3.2 and a minimum of two
(2) additional projects must meet the requirements of either paragraph 4.1.3.1 or 4.1.3.2.
The requirements of 4.1.3.3 and 4.1.3.4 shall be met within at least one of the three (3) minimum projects discussed above.
4.2.2 Rating Methodology for Factor 1. Factor 1 will be rated using the following adjectival descriptions:
ACCEPTABLE - Proposal meets the requirements of the solicitation.
UNACCEPTABLE – Proposal does not meet the requirements of the solicitation.
5. FACTOR 2 – PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS
5.1.1 The Offeror shall demonstrate a record of performance on each project submitted for Factor 1.
The information submitted through the Past Performance Questionnaire Summary Sheet (Attachment 2) and the Past Performance Questionnaire (PPQ) (Attachment 3) for Factor 1 and relevant CCASS or CPARS evaluations will be evaluated for this factor. The PPQ is provided for the Offeror to submit to the client (Point of Contact) for each project the Offeror includes in its proposal. Offeror must ensure correct phone numbers and email addresses are provided for the client Point of Contact. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. While it is important to submit a PPQ signed by the client, if the Offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ which will contain contract and client information and submit it with the proposal.
The Government will call and confirm information provided by the Offeror on the PPQs with the points of contact, to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. If the Government is unable to verify the information in the PPQ, it may be disregarded. Offerors are cautioned that the PPQ must contain sufficient information for the government to determine whether the project contains the elements of work similar to this requirement as described in Factor 1.
Offerors may submit PPQs submitted on other procurements provided they are on the NAVFAC/USACE Past Performance Questionnaire Form—Offerors may attach one additional single-sided page (per PPQ) to further describe how the project meets the RFP requirements.
CCASS or CPARS will be obtained by the Government for the projects submitted.
Offerors shall not incorporate by reference into the proposal, PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. The Government will consider any available CCASS or CPARS information on the relevant projects submitted. In addition, the Government may consider available past performance information on projects not submitted by Offerors’ in response to this solicitation.
5.1.2 Offerors may provide information on problems encountered on the identified contracts and the Offeror’s corrective actions.
5.1.3 Using PPQs as described above or CCASS/CPARS evaluations, Offerors shall demonstrate the quality of performance information on projects determined by the government to be recent and relevant from Factor 1.
5.1.4 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
5.2 EVALUATION CRITERIA
5.2.1 Past Performance Evaluation. The past performance evaluation results in an assessment of the probability that the Offeror will meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. The projects submitted for Factor 1 will be evaluated to assess the Government’s confidence in the ability of the Offeror to meet the solicitation requirements.
5.2.2 Performance Evaluation. The Government will evaluate the quality of the Offeror’s past performance using the sources available to it including but not limited to the projects identified by the Offeror and submitted on the PPQs and any additional information about those projects received from references and CPARS. The Government will consider any available CCASS or CPARS information on the relevant projects submitted by the Offeror under this factor. The Government reserves the right to determine an Offeror’s past performance to be Unacceptable if negative past performance information on relevant projects performed by the Offeror but not submitted in response to this solicitation is discovered.
5.2.3 The Government will consider past performance of the offeror and the past performance information submitted on members of a joint venture.
5.2.4 Rating Methodology for Factor 2. The Government will consider the recent and relevant past performance information to assign a past performance evaluation rating. To be rated “Acceptable” in this factor, Offerors must receive ratings of Satisfactory or better in each Rating Methodology for Factor 2. The Government will consider the recent and relevant past performance information to assign a past performance evaluation rating. To be rated “Acceptable” in this factor, Offerors must receive ratings of Satisfactory or better in each Section of all recent, relevant PPQs submitted by the Offeror and on recent, relevant CPARs reviewed by the government. Sections in a CPARS evaluation are Quality, Schedule, Cost Control (if applicable), Management, Utilization of Small Business, Regulatory Compliance, and Other Areas such as but not limited to Safety. The elements within each Section are not considered in determining whether an offeror is Acceptable for this factor. Projects for which an evaluation was performed under the older CCASS system, only the Overall Rating will be considered. Sections in a PPQ is the individual element within each Section. For example Quality Section is not rated however each question/statement such as a) Quality of technical data/report preparation efforts; b) Ability to meet quality standards specified for technical performance; c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance; d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) is rated and will be considered individually in the evaluation of this factor. This factor will be rated using the following adjectival descriptions:
Past Performance Ratings
Rating Description
Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
Unacceptable Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
5.2.5 If no recent and relevant performance record is available or information is so sparse that no meaningful rating can be reasonably assigned, this factor will be assigned a rating of “Unknown” (FAR 15.305 (a)(2)(iv)). In the context of acceptability/unacceptability, “unknown” shall be considered “Acceptable”.
6. EVALUATION FACTORS
6.1 NON-COST FACTORS:
FACTOR 1 Corporate Relevant Specialized Experience
FACTOR 2 Past Performance
6.2 FACTOR 3 PRICE. Price analysis will be performed in accordance with FAR 15.404-1(b), to determine fairness and reasonableness. Reasonableness will be established using available pricing tools such as historical price information, price competition information, or the Independent Government Estimate. Proposals will be reviewed to determine price submission errors or omissions and areas requiring clarification.
6.3 In accordance with FAR 52.217-5, the price for CLINs 0003 and 0004 will be added to the price for the base CLINS 0001 and 0002 to determine the total evaluated price.
ADDITIVE/DEDUCTIVE ITEMS: In accordance with FAR 52.217-5, the price for CLINs 0005
- 0018 will also be added or subtracted from the price for the base CLINS to determine the total evaluated price. Offerors are to price these CLINs with positive numbers for costs added to the price for the work in the base bid and negative numbers for a reduction in the price for the work in the base bid where a lesser requirement is being substituted for a requirement. The Government will add or subtract the proposed prices from the price for the base bid to determine the total evaluated price.
The total evaluated price will be the addition and subtraction of all CLINs 0001 – 0018.
7. OVERALL PROPOSAL EVALUATION
7.1 The evaluation will be based on the content of the proposal, and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
7.2 Each member of the SSEB will independently consider all information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document whether the Offeror meets or does not meet the minimum requirements in order to support the assigned rating for each factor. Comments are required for all ratings.
7.3 The Government will evaluate the proposals beginning with the lowest price to the highest price until it reaches the first responsive and responsible Offeror who achieves Acceptable ratings in both factors. That Offeror will be selected for award-- unless necessary to assist with price analysis, the remainder of the proposals will not be evaluated.
8. EXCEPTIONS. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
9. RESTRICTIONS. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
10. BASIS FOR AWARD
10.1 Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, and technical acceptability. A responsibility determination will be made in accordance with Federal Acquisition Regulation (FAR) 9.1.
10.2 In order to determine which proposal(s) represent the best value, proposals will be evaluated against all source selection criteria in this RFP.
10.3 Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. In order for a proposal to be considered awardable, there must be an “acceptable” rating in all non-price factors. The Government will make award to the lowest priced Offeror who is deemed responsive and whose price has been determined fair and reasonable. Reasonableness will be established by using price analysis in accordance with FAR 15.404-1(b), to determine fairness and reasonableness. Pricing tools such as historical price information, price competition information, or the Independent Government Estimate will be used to determine reasonableness.
10.4 The Government reserves the right to reject any and all offers.
10.5 Offerors are reminded to include their best technical and price terms in their initial offer.
ATTACHMENT 1
PROPOSAL DATA SHEET
PROJECT TITLE: Training, Research & Network Center
PROJECT LOCATION: Fort Gordon, GA
1. Name of Firm: Address:
Phone:
Fax:
E-mail:
DUNS # (used for accessing CCASS, PIPRS)
2. AUTHORIZED NEGOTIATORS. FAR 52.215-11
The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).
Name of Person Authorized to Negotiate: ________________________________________ Negotiator’s Address: ________________________________________________________ Negotiator’s Telephone: __________________________________ Negotiator’s E-mail:______________________________________
ATTACHMENT 2
PAST PERFORMANCE QUESTIONNAIRE SUMMARY SHEET
Training, Research & Network Center, Ft Gordon, GA
The Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet to provide a summary of the PPQs included in this proposal. The summary sheet shall include information for all columns.
No.
Project Name
Contractor
Contract #
Construction % Complete @ Time of Solicitation
Scheduled
Completion Date
ATTACHMENT 3
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: ___ Prime Contractor ___Sub Contractor __Joint Venture ___ Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ___ Firm Fixed Price ___Cost Reimbursement ___ Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work: ___High ___ Med ___ Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Organization:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS
QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE
OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH
THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE
SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY
ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.
HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.
PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE
GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL
INFORMATION ON THIS FORM.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner.
A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified.
Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
b) Ability to hire, apply, and retain a qualified workforce to this effort
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E
VG
S
M
U
N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues)
c) Would you hire or work with this firm again? (If no, please explain below)
d) In summary, provide an overall rating for the work performed by this contractor.
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the optional CLINs 0003 and 0004 by written notice to the Contractor within 120 calendar days after issuance of Notice to Proceed. CLINS 0005 through 0018 can only be exercised at time of award or not at all. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
ADDITIONAL REQUIRMENTS
1. Designated Billing Office (APR 1989 CESAS-RM): Invoices will be submitted to:
USACE Savannah District Fort Gordon Area Office 1236 Lane Ave, Bldg 11303 Fort Gordon, GA 30905
2. U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1: This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/usacepublications/engineermanuals.aspx.
The Contractor shall be responsible for complying with the current edition and all changes posted on the web through the date that is 10 calendar days prior to the date offers are due. If the solicitation is amended to extend the time set for receipt of offers, the 10 calendar days rule stated above shall be applied against the amended date. (For example, if offers are due on 10 April, all changes posted on or before 31 March shall apply to the contract. If the time for receipt of offers is extended from 10 April to 20 April, all changes posted on or before 10 April shall apply to the contract.)
3. Contractor-Prepared Network Analysis System: The progress chart to be prepared by the contractor pursuant to FAR 52.236-15, Schedules for Construction Contracts, shall utilize the Critical Path Method (CPM) of network calculation.
4. Unauthorized Instructions from Government or Other Personnel: The Contractor shall not accept any instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer or the Contracting Officer’s Representative (COR) acting within the limits of the COR’s Authority. See the Contracting Officer’s Representative clause of this contract.
5. Required Insurance (Oct 2012 SAS) (Ref. FAR 28.307):
a. The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
1) Comprehensive and Employer's Liability Insurance: Coverage in an amount not less $100,000 or in the amount required by the State law in which the work is to be performed under this contract, whichever is greater.
2) Comprehensive General Liability Insurance: Coverage in an amount not less than $500,000 per occurrence.
3) Automobile Liability Insurance: $200,000 per person and $500,000 per occurrence for bodily injury liability and $20,000 property damage liability.
b. Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above-required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation, or any material change in the policies adversely affecting the interests of the Government in such insurance, shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than 30 days after written notice thereof to the Contracting Officer.
c. The Contractor agrees to insert the substance of this clause, including this subparagraph (c), in all subcontracts hereunder.
6. Preconstruction Conference (OCT 1988 SAS): Preconstruction Conference In accordance with FAR 36.305:
a. A preconstruction conference will be arranged by the Contracting Officer after award of contract and before commencement of work. The Contracting Officer’s Representative (COR) will notify the Contractor of the time and date set for the meeting. At this conference, the Contractor shall be oriented with respect to Government procedures and line of authority, contractual, administrative, and construction matters.
b. The Contractor shall provide the following 7 days prior to this conference, in completed form a Certificate of Insurance, plus the following items in either completed or draft form:
• Accident Prevention Plan
• Quality Control Plan
• Letter Appointing Superintendent (with resume)
• Letter Appointing Quality Control Manager (w/qualifications)
• Transmittal Register
• Power of Attorney and Certified Copy of Resolution Network Analysis System, when applicable
• List of Subcontractors
• Environmental Protection Plan
• Work Plan (to include equipment list)
c. A letter of record will be written documenting all items discussed at the conference, and a copy will be furnished by the COR to all in attendance.
7. Submittal of Modification Cost Estimates Proposals (Ref. DFARS 52.236-7000): When submittals of Cost
Estimate Proposals are required for additions or deletions to work under this contract by modification, the Contractor shall use DA Form 5418-R titled "Cost Estimate Analysis" (see Attachment 1 to SECTION 00 73 00). A separate assemblage will be prepared for submittal by each trade affected by the proposed work.
8. Time Extensions for Unusually Severe Weather (APR 1991 OCE):
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the contract clause entitled Default (Fixed Price Construction). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.
Monthly Anticipated Adverse Weather Delay Workdays Based on a 5-Day Work Week
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 8 6 6 4 5 6 8 6 5 3 4 7
c. Upon acknowledgment of the Notice to Proceed and continuing through-out the contract, the Contractor will record on the daily Contractor Quality Control report the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a modification in accordance with the contract clause entitled Default (Fixed Price Construction).
9. Antiterrorism and Operational Security:
AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel.