Questions/Answers

RFI: The onsite supervision requirements need to be clarified. Spec Section 01 35 26-1.6.1.1 states “the contractor QC person can be the SSHO.” Spec Section 01 45 00.00 10-3.4.2 states “the CQC System Manager shall be assigned no other duties.” It is unclear how many supervisory personnel will be required onsite. Please clarify the roles of Superintendnet, QC, and SSHO.

The requirement is 3 separate positions, Super, SSHO and CQC

Also, the CQC personnel matrix in Spec Section 01 45 00.00 10-3.4.3 requires an onsite submittal clerk. Can this position be filled in the contractor’s office rather than on site?

Yes, the onsite submittal clerk is required to be on site .