Service_Entrance_Conductors_Warehouse_2017-02-16.pdf

PDF 401 KB Posted

Attached to
SIAD Construction Project - Group C (308, 311, 355, 364)
Solicitation number
W912GY17R0018
Issued by

About this file

Service Entrance Conductors Drawing

View the file

Other files

File Type Posted
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
W912GY-17-R-0018_0002.pdf PDF
SOW_-_364_final.docx DOCX document
Construction_Q&A_-_Group_C.docx DOCX document
SOW_-_355_final.docx DOCX document
W912GY-17-R-0018_0001.pdf PDF
SOW_-_308_final.docx DOCX document
SOW_-_311_final.docx DOCX document
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Bldg_364_Lighting_-_16-Mar-17.pdf PDF
BLDG_308_Doors-Schematic.pdf PDF
BLDG_311_Electrical_-_16-Mar-17.pdf PDF
BLDG_308_Task_Lighting_-_2017-03-13.pdf PDF
BLDG_311_Lighting_-_16-Mar-17.pdf PDF
Bldg_364_Electrical_-_16-Mar-17.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
BLDG_308_Post_and_Truss_and_Doors.pdf PDF
BLDG_311_Doors-Schematic.pdf PDF
BUILDING_355_Power_Upgrades.pdf PDF
Construction_QA_-_Group_C.docx DOCX document
End-wall_brace_detail.pdf PDF
W912GY-17-R-0018.pdf PDF
SOW_-_311_final.docx DOCX document
SOW_-_308_final.docx DOCX document
SOW_-_364_final.docx DOCX document
Wage_Determination_-_Construction_(SIAD).pdf PDF
W912GY-17-R-0018.pdf PDF
SOW_-_355_final.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herlong California Scale: Date: Drawn By: Sheet:

Plotted Date:

Sierra Army Depot

GROUNDING LAYOUT

TYPICAL

Project #TYP-17-_____ Mission

N.T.S. 02/16/2017 HMC 1 Of 2

F:\USER2\BUILDINGS\bldg updates 2009\12-03231 Bldg 308-310\12-03231 Bldg 308-310 Service Entrance Conductors-TYP 2017-02-16.dwg, 2/16/2017 4:30:25 PM, DWG To PDF.pc3

Jason.Colbert2 Typewritten Text DISTRIBUTION STATEMENT A - Approved for Public Release; distribution is unlimited.

Herlong California Scale: Date: Drawn By: Sheet:

Plotted Date:

Sierra Army Depot

GROUNDING LAYOUT

TYPICAL

Project #TYP-17-_____ Mission

N.T.S. 02/16/2017 HMC 2 Of 2

F:\USER2\BUILDINGS\bldg updates 2009\12-03231 Bldg 308-310\12-03231 Bldg 308-310 Service Entrance Conductors-TYP 2017-02-16.dwg, 2/16/2017 4:30:26 PM, DWG To PDF.pc3

File details come from the government source that posted it. Updated .