BUILDING_355_Power_Upgrades.pdf
PDF 360 KB Posted
- Attached to
- SIAD Construction Project - Group C (308, 311, 355, 364) Federal contract opportunity
- Solicitation number
- W912GY17R0018
About this file
355 - Power Upgrades Drawing
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 8' LED Light Fixture
LEGEND:
- Task Lighting Locations
TYPICAL "TASK" LIGHTING LAYOUT DETAIL:
9' 8-1/4"
"Task" Layout Fixtures
48" to center of fixture from inside edge of post between fixtures
Scale: 1"=40'
20 40 80 120
Herlong California Scale: Date: Drawn By: Sheet:
Plotted Date:
Sierra Army Depot
Lighting Layout Warehouse Upgrade
Project #355-17-_____ Mission
1"=40' 03/14/2017 HMC 1 Of 1DISTRIBUTION A: Approved for public release: distribution unlimited
- DUPLEX OUTLET
- GFI DUPLEX OUTLET
- MAIN DISTRIBUTION PANEL (MDP)
- SUBPANEL
LEGEND:
Scale: 1"=40'
20 40 80 120
Herlong California Scale: Date: Drawn By: Sheet:
Plotted Date:
Sierra Army Depot
Power Layout Warehouse Upgrade
Project #355-17-_____ Mission
1"=40' 03/13/2017 TLW 1 Of 1DISTRIBUTION A: Approved for public release: distribution unlimited
File details come from the government source that posted it. Updated .