W912GY-17-R-0018_0001.pdf

PDF 89 KB Posted

Attached to
SIAD Construction Project - Group C (308, 311, 355, 364)
Solicitation number
W912GY17R0018
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
W912GY-17-R-0018_0002.pdf PDF
SOW_-_364_final.docx DOCX document
Construction_Q&A_-_Group_C.docx DOCX document
SOW_-_355_final.docx DOCX document
SOW_-_308_final.docx DOCX document
Service_Entrance_Conductors_Warehouse_2017-02-16.pdf PDF
SOW_-_311_final.docx DOCX document
Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Bldg_364_Lighting_-_16-Mar-17.pdf PDF
BLDG_308_Doors-Schematic.pdf PDF
BLDG_311_Electrical_-_16-Mar-17.pdf PDF
BLDG_308_Task_Lighting_-_2017-03-13.pdf PDF
BLDG_311_Lighting_-_16-Mar-17.pdf PDF
Bldg_364_Electrical_-_16-Mar-17.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
BLDG_308_Post_and_Truss_and_Doors.pdf PDF
BLDG_311_Doors-Schematic.pdf PDF
BUILDING_355_Power_Upgrades.pdf PDF
Construction_QA_-_Group_C.docx DOCX document
End-wall_brace_detail.pdf PDF
W912GY-17-R-0018.pdf PDF
SOW_-_311_final.docx DOCX document
SOW_-_308_final.docx DOCX document
SOW_-_364_final.docx DOCX document
Wage_Determination_-_Construction_(SIAD).pdf PDF
W912GY-17-R-0018.pdf PDF
SOW_-_355_final.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 to Solicitation W912GY-17-R-0018 is captured in the Summary of Changes page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GY-17-R-0018

X 9B. DATED (SEE ITEM 11)

18-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2017

CODE

SIERRA ARMY DEPOT

CONTRACTING OFFICE

74 C STREET BUILDING 60

HERLONG CA 96113

W912GY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GY-17-R-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

Building 308

1. SOW 308 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal with the government.”

2. SOW 308 Section 1.3.15 changed to Reserved.

3. SOW 308 Section 1.3.24 changed from “Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on all four sides of the building (match system on Bldg. 352).” to

“Remove existing wood bumpers on the exterior walls. Install a metal stand off guard rail system on the

East and West sides of the building.”

4. SOW 308 Section 1.3.26 changed to Reserved.

Building 311

5. SOW 311 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

6. SOW 311 Section 1.3.15 changed to Reserved.

Building 355

7. SOW 355 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

8. SOW 355 Section 1.3.43 changed from “Ceiling and wall insulation: Install R-21 foil faced insulation in between roof rafters at bottom of rafters and R-19 foil faced insulation in walls. Rafters are 24” O.C.” to

“Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-11 foil faced insulation in walls. Rafters are 24” O.C.”

9. SOW 355 Section 1.3.53 changed to Reserved.

10. SOW 355 Section 1.3.16 changed from “Provide and Install new Crane Market Square Double 5 Inch lap vinyl siding per manufacturer’s specifications and in accordance with ANSI standards with regard to

W912GY-17-R-0018

normal expansion and contraction. Color of siding and trim to match building 305.” to “Provide and Install new Crane Market Square Double 5 Inch lap vinyl siding per manufacturer’s specifications and in accordance with ANSI standards with regard to normal expansion and contraction for all old siding. Color of siding and trim to match building 305.”

11. SOW 355 Section 1.3.45 changed to “Install engineered bracing on North and South ends of building.

Shear sheathing shall be place horizontally (when more than 8’ tall) with 2’ min. staggered butt joints.” to

“Install engineered bracing on South end of building. Shear sheathing shall be place horizontally (when more than 8’ tall) with 2’ min. staggered butt joints.”

12. SOW 355 Section 1.3.50 changed from “Install (2) Thermo-Cycler heaters (4 units total) on the east side of building 351 as shown in the Appendices.” to “Install (2) Thermo-Cycler heaters (4 units total) on the east side of building 355 as shown in the Appendices.”

13. SOW 355 Section 1.3.65 changed to Reserved.

Building 364

14. SOW 364 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal

15. SOW 364 Section 1.3.48 changed to Reserved.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 17-Aug-2017 12:00 PM to 28-Aug-2017 12:00 AM.

The performance payment bonds has changed from Yes to No.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .