Epoxy_Broadcast_Floor_Coating_system.doc

DOC document 37 KB Posted

Attached to
SIAD Construction Project - Group C (308, 311, 355, 364) Federal contract opportunity
Solicitation number
W912GY17R0018
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Epoxy Flooring Attachment

View the file

Other files for this federal contract opportunity

Other files attached to SIAD Construction Project - Group C (308, 311, 355, 364), newest first.
File Type Posted
W912GY-17-R-0018_0002.pdf PDF
SIAD_Construction_Sign-in_Sheet.xlsx XLSX spreadsheet
Revised-Epoxy_Broadcast_Floor_Coating_system.doc DOC document
Construction_Q&A_-_Group_C.docx DOCX document
W912GY-17-R-0018_0001.pdf PDF
SOW_-_308_final.docx DOCX document
SOW_-_364_final.docx DOCX document
SOW_-_355_final.docx DOCX document
Service_Entrance_Conductors_Warehouse_2017-02-16.pdf PDF
SOW_-_311_final.docx DOCX document
End-wall_brace_detail.pdf PDF
BLDG_311_Lighting_-_16-Mar-17.pdf PDF
Wall_Pipe_Bracing_over_roll-up_doors..pdf PDF
BLDG_308_Post_and_Truss_and_Doors.pdf PDF
BLDG_311_Electrical_-_16-Mar-17.pdf PDF
Bldg_364_Lighting_-_16-Mar-17.pdf PDF
Bldg_364_Electrical_-_16-Mar-17.pdf PDF
BUILDING_355_Power_Upgrades.pdf PDF
BLDG_308_Doors-Schematic.pdf PDF
BLDG_308_Task_Lighting_-_2017-03-13.pdf PDF
BLDG_311_Doors-Schematic.pdf PDF
Construction_QA_-_Group_C.docx DOCX document
W912GY-17-R-0018.pdf PDF
SOW_-_355_final.docx DOCX document
SOW_-_364_final.docx DOCX document
Wage_Determination_-_Construction_(SIAD).pdf PDF
W912GY-17-R-0018.pdf PDF
SOW_-_311_final.docx DOCX document
SOW_-_308_final.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Epoxy Broadcast Overlay System

2016 Scope of Work

1. Contractor Certification: Submit a letter from the primary materials manufacturer certifying that the installing prime or sub-contractor has been properly trained in the application of the materials being installed and is acceptable to the material manufacturer. There shall also be records of successful in-service installation performance.

a. Engage an installer who employs only persons trained and approved by the resinous flooring manufacturer for applying resinous flooring systems specified.

b. Engage an installer who is certified in writing by the resinous flooring manufacturer as a factory trained applicator qualified to apply the specified resinous flooring system.

2. Scope of Work Items:

3. Surface Preparation (Concrete Floor): Should be cleaned and prepared to achieve a laitance-free and contaminate-free open textured surface by shot blasting or equivalent mechanical means (CSP-3 to CSP-4 as per ICRI Guidelines) Sweep and vacuum any remaining dirt and dust with a wet/dry vacuum. Removing residual dust will help insure a tenacious bond between the epoxy and the substrate.

4. Expansion Joints / Saw Cuts/ Cracks:

5. Small Cracks: Post shot blasting; treat all cracks with Sikadur 35 Hi Mod LV using the Gravity Feed Method as described in the Sika Technical Data Sheets. Mix Sikadur 35 Hi Mod LV as an Epoxy Mortar for larger spalls and depressions.

6. Large Cracks: Post shot Blasting: Saw Cut at 30º Angle across the Crack every 18”-24” to create Stitch effect. Saw Cut is to be 3/8”Wx1.5”Dx18L” to receive 1/8”Lx3/4”W galvanized steel plate strap. Steel shall be clean and free of oils and any contamination. Steel Straps are to be placed into reservoir and then filled with Sikadur 35 Hi Mod LV using the Gravity Feed Method as described in the Sika Technical Data Sheets. Muliable passes may be required in order to achieve a flush repair. Overfilling is recommended on the final pass to ensure a flush or overfilled repair. The excess resin can be removed by Grinding.

7. Control Joints: For all control joints, create a slotted channel by double saw cutting both sides of the existing joint to create a minimum 1.5” to 2” channel (wide & deep). Following the sawing process to demo out all material and make sure to adequately clean the edges (sides) of the channel to remove any residue. Prime the edges of the channel with Sikadur 21 Lo Mod Epoxy (neat) prior to installation of an epoxy mortar.

8. Fill the channel with an epoxy mortar (Sikadur 22 Lo Mod mixed with #20 or #30 silica sand) and allow to cure for 24 hours. Grind the channel flat prior to proceeding with coating the field with epoxy broadcast application.

9. Moisture Vapor Primer: Sikafloor 1610 (aka: Sikalastic MB Primer) should be considered where < 6% mass (pbw-part by weight) is measured on concrete substrate with Tramex CME CME Expert type concrete moisture meter. Apply at 10-12 mils (130 s/f per gallon) to a properly prepared substrate.

10. Joint Sealants: Apply BASF Epolith “P” to the final Saw Cut Joints. Follow BASF Technical Guidelines for application recommendations.

11. Application of Epoxy Wear Surface: Apply 45-50 sf per gallon (32-35 Mils) of Sikadur 22 Lo Mod Epoxy (1:1 Mix) spread with a notched squeegee to the properly prepared surface. Continue to overlap the material to insure adequate coverage. Back roll the epoxy with a phenolic core roller to insure the material is smooth and level always maintaining a “wet edge”, immediately apply #20 aggregate with Aggregate Blower to ensure consistent sand broadcast (per gradation chart) with a Mohr’s hardness of 6 or greater to excess (typically 1-1.5 lbs. per sf). After 4 hrs. @ 73º sweep off excess sand.

12. Seal Coat: Apply approximately 75-80 sf per gallon as a seal coat (Sikadur 21 Lo Mod) without adding any aggregate. Let the Epoxy cure for 24 hours before subjecting to wheel traffic

13. Clean Saw Cut Joints: Saw cut expansion joints / repair areas. Saw cut and clean out all repair areas and expansion joints. Expansion joints including those that have been treated with epoxy mortar (Section 8) should be saw cut after the application of the Epoxy Wear Surface.

14. Mock-Up: Mock up an area of 10’ x 10’ (100 sf) for the Base Facility Engineer to verify appearance of sand, epoxy joint sealant, and slip resistance. Mock-Up must be approved by the Technical POC prior to work commencing.