B.08.02.06 Bidding Schedule_DC-23-0008_R1.pdf

PDF 127 KB Posted

Attached to
Construct Baumholder Army Lodge, United States Army Garrison (USAG) Rheinland-Pfalz, Baumholder Military Community, Germany
Solicitation number
W912GB23R0025
Issued by

About this file

This document contains a bidding schedule and related solicitation for a federal construction contract. The bidding schedule requests pricing for the construction of a 78-unit Army Lodge facility at Baumholder Military Community in Germany. It includes pricing for base items such as primary facilities, site work, and German government charges, as well as option items for additional facilities like a playground, laundry equipment, kitchen items, and parking structures. Offerors are to provide unit pricing for each item. The solicitation provides additional details on the project, which involves constructing the Army Lodge building along with supporting utilities, site work, and information systems. The U.S. Army Corps of Engineers Europe District will award a firm-fixed-price design-bid-build construction contract with an estimated value between $40-70 million. The contract completion period is anticipated to be 1100 calendar days. The best value source selection process will be used to select the winning contractor. The response due date is not provided.

View the file

Other files

File Type Posted
B.08.03 RFP BH Army Lodge_W912GB23R0025_Conformed.pdf PDF
B.08.03 RFP Amendment 0004_BH Army Lodge_W912GB23R0025.pdf PDF
A.03.09.01 BHLODGE_00_GENERAL_R1.pdf PDF
A.03.09.03 BHLODGE_02_CIVIL_R1.pdf PDF
A.03.09.07 BHLODGE_06_MECHANICAL_R1.pdf PDF
H.08.04 Corrected100pct_BH Lodge_Specs_DC-23-0008_R1.pdf PDF
H.08.04 BH Lodge_Submittal Register_DC-23-0008_R1.pdf PDF
B.08.03 RFP Amendment 003_BH Army Lodge_W912GB23R0025.pdf PDF
A.03.09.05 BHLODGE_04_ARCHITECTURE_R1.pdf PDF
A.03.09.09 BHLODGE_08_ELECTRICAL_R1.pdf PDF
A.03.09.02 BHLODGE_01_LIFE SAFETY_R1.pdf PDF
A.03.09.10 BHLODGE_09_TELECOM_R1.pdf PDF
B.08.03 RFP Amendment 002_BH Army Lodge_W912GB23R0025.pdf PDF
B.08.03 RFP Amendment 001_BH Army Lodge_W912GB23R0025.pdf PDF
A.03.09.02 LIFE SAFETY_DC-23-0008_rev.pdf PDF
B.07.01 Pre-Proposal Conference Sign-In 15MAR2023.pdf PDF
B.07.01 PPC Slides_W912GB23R0025_DC-23-0008.pdf PDF
Baumholder Map alternative gates.pdf PDF
B.08.02.04 BLA Template_DC-23-0008.docx DOCX document
A.03.09.02 LIFE SAFETY_DC-23-0008.pdf PDF
A.03.09.10 TELECOM_DC-23-0008.pdf PDF
B.08.02.01 Past Performance Info Sheet_DC-23-0008.docx DOCX document
B.08.02.06 Bidding Schedule_DC-23-0008.pdf PDF
A.03.09.03 CIVIL_DC-23-0008.pdf PDF
A.03.09.07 MECHANICAL_DC-23-0008_.pdf PDF
A.03.09.01 GENERAL_DC-23-0008.pdf PDF
B.08.02.02 Past Performance Questionare_DC-23-0008.pdf PDF
B.08.02.03 Commitment Letter Sample_DC-23-0008.docx DOCX document
A.03.09.09 ELECTRICAL_DC-23-0008.pdf PDF
A.03.09.08 PLUMBING_DC-23-0008.pdf PDF
A.03.09.05 ARCHITECTURE_DC-23-0008.pdf PDF
B.08.02 RFP_BH Army Lodge_W912GB23R0025.pdf PDF
H.08.04 Corrected100pct_BH Lodge_Specs_DC-23-0008.pdf PDF
H.08.04 BH Lodge_Submittal Register_DC-23-0008.pdf PDF
A.03.09.06 FIRE PROTECTION_DC-23-0008.pdf PDF
B.08.02.05 BLG Template_DC-23-0008.docx DOCX document
A.03.09.04 STRUCTURAL_DC-23-0008.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oct 2020

PRICE SCHEDULE

Offerors shall provide pricing for all base and option items.

The following items include providing all labor, materials, equipment, and services necessary to complete the construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules;

inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.

Item No. Title Quantity Unit Unit Price Amount

BASE ITEMS

0001 Primary Facilities -- NAF 1 Job € €

0002 Site work

0002AA

Site Work inside the 5-foot line – NAF

1 Job € €

0002AB

Site Work outside the 5-foot line – DPW

1 Job € €

0003 German Government Charge

0003AA

German Government Charge -- NAF

1 Job DO NOT PRICE

0003AB

German Government Charge – DPW

1 Job DO NOT PRICE

Total of Base Items 0001 thru 0002 €

OPTION ITEMS

Option 1: Playground

Surfacing 1 Job € €

Option 2: Commercial

Laundry Equipment 1 Job € €

Option 3: Prep

Kitchen/Dining Equipment 1 Job € €

0007 Option 4: Kitchenettes 1 Job € €

Option 5: Parking PV

Carport 1 Job € €

PRICE SCHEDULE

PROJECT TITLEConstruct Army Lodging Facility

PROJECT LOCATION (CITY/INSTALLATION AND COUNTRY)(BAUMHOLDER/SMITH

BARRACKS/GERMANY)

DATEAPRIL 2023

Date

Item No. Title Quantity Unit Unit Price Amount

Total of Option Items 0004 thru 0008 €

Total of all Base and Option Items

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --

File details come from the government source that posted it. Updated .