A.03.09.07 BHLODGE_06_MECHANICAL_R1.pdf
PDF 44 MB Posted
- Solicitation number
- W912GB23R0025
- Issued by
-
Department of the Army European Command
About this file
This document provides details of a federal contract opportunity to construct an Army Lodge in Baumholder, Germany. The U.S. Army Corps of Engineers (USACE) Europe District will award a firm-fixed-price construction contract valued between $40-70 million to build a 78-unit Army lodging facility. The facility will include extended stay rooms, family suites, reception areas, lounges, offices, storage, elevators, and utilities to support water, wastewater, stormwater, fire suppression, electrical, and heating/cooling systems. The project will also involve site preparations like clearing, grading, fencing, and landscaping. The contract award will be through a best value source selection process. The construction completion period is anticipated to be 1100 calendar days after notice to proceed. The solicitation will be available for download on the System for Award Management website. Interested contractors must register in SAM and monitor the website daily for the solicitation posting and any amendments.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE FOLLOWING NOTES ARE GENERAL IN NATURE AND PERTAIN TO THE ENTIRE PROJECT. WHERE THERE ARE EXCEPTIONS, ADDITIONS, OR REVISIONS TO THESE NOTES, SUCH EXCEPTIONS, ADDITIONS, OR REVISIONS ARE SO NOTED ON THE PARTICULAR DRAWING WHERE THEY OCCUR.
2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL WORKS REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED AND IN ACCORDANCE WITH RELEVANT CODES.
3. ALL THE EQUIPMENT CONTAINED WITHIN THIS DESIGN STAGE IS TO BE ENSURED TO BE CE CERTIFIED. THE CONTRACTOR IS TO ENSURE THAT ALL THE
SELECTED FINAL EQUIPMENT IS ALSO CE CERTIFIED.
4. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
5. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE CONTRACT DOCUMENTS TO DEVELOP A COMPLETE UNDERSTANDING OF THE PROJECT SCOPE.
FAILURE TO REVIEW ALL CONTRACT DOCUMENTS WILL NOT ABSOLVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PERFORM ALL OF THE WORK REQUIRED.
6. THE CONTRACTOR SHALL, UPON REVIEW OF THE PREMISES AND THE CONTRACT DOCUMENTS, ADVISE THE GOVERNMENT'S REPRESENTATIVE OF ANY
DISCREPANCIES THAT WILL AFFECT THE WORK REQUIRED.
7. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
8. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS SHALL BE CONFIRMED ON SITE IN ACCORDANCE WITH SITE CONDITIONS TO ENSURE PROPER FUNCTION OF THE SYSTEMS.
PROPOSED CHANGES MUST BE APPROVED BY THE DISSCIPLINE ENGINEER BEFORE FINAL INSTALLATION. DO NOT SCALE THE DRAWINGS.
9. UNLESS OTHERWISE STATED, INDICATED ELEVATIONS REFERENCE THE CENTRELINE OF DUCTS AND PIPES.
10. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORKS WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., AS SHOWN ON OTHER
CONTRACT DOCUMENT DRAWINGS.
11. THE CONTRACTOR SHALL MAKE REASONABLE MODIFICATIONS IN ARRANGEMENT OF THE PIPING, DUCTWORK AND EQUIPMENT REQUIRED FOR PROPER EXECUTION OF THE WORKS AND TO AVOID COLLISIONS WITH EXISTING AND NEW CONSTRUCTION INCLUDING LIGHT FIXTURES, CONDUITS, PIPING, DUCTWORK, EQUIPMENT, ETC. THESE MODIFICATIONS ARE TO BE EXECUTED WITH NO ADDITIONAL COST TO THE GOVERNMENT.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DELEGATE ALL WORK BETWEEN SUBCONTRACTORS. REFERENCES TO VARIOUS TRADES IN THESE DOCUMENTS ARE ONLY SUGGESTED DIVISIONS OF RESPONSIBILITY BASED ON INDUSTRY STANDARD PRACTICES.
13. WHEN MECHANICAL WORK IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE WORKS OF THE
SUBCONTRACTORS AND THEIR ASSOCIATED CONTRACTS.
14. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT HAVE BEEN SPECIFIED, ONLY A SINGLE MANUFACTURER IS TO BE UTILIZED.
15. ALL EQUIPMENT WHICH MUST BE SERVICED,OPERATED OR MAINTAINED IS TO BE LOCATED IN A FULLY ACCESSIBLE POSITION.
16. ALL MANUFACTURER'S RECOMMENDED CLEARANCES AROUND EQUIPMENT ARE TO BE MAINTAINED.
17. ALL CONTROL WIRING AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE.
18. DO NOT LOCATE MECHANICAL WORK IN ELECTRICAL OR COMMUNICATION ROOMS, EXCEPT FOR CONNECTIONS SPECIFICALLY SERVING THE RESPECTIVE ROOM.
19. ALL DUCTWORK AND PIPEWORK IS TO BE COORDINATED WITH THE ELECTRICAL, COMMUNICATION AND STRUCTURAL COMPONENTS.
20. PROVIDE ACCESS TO FIRE DAMPERS, BALANCING DAMPERS, MOTORIZED DAMPERS, EQUIPMENT, ETC. ACCESS DOORS SHALL BE MINIMUM 300MM X 300MM FOR DAMPER ACCESS AND 450mm x 450mm FOR EQUIPMENT ACCESS.
21. ANY WORK REQUIRING CUTTING AND/OR PATCHING IS TO BE UNDERTAKEN WITH PATCHES THAT MATCH THE EXISITNG ADJACENT SURFACES WITH REGARDS TO
MATERIAL,TEXTURE; FINISH AND QUALITY.
22. STRUCTURAL MEMBERS SHALL NOT BE CUT UNLESS SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS.
23. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER TRADES.
24. ALL OPENINGS IN FIREWALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH A UL CERTIFIED FIRE RATED ASSEMBLY APPROPRIATE TO THE PENETRATION. REFER TO FIRE/LIFE SAFTY DRAWINGS TO ENSURE THE APPROPRIATE FIRE RATINGS ARE FOLLOWED IN CONSTRUCTION.
25. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL MEMBERS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR.
ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS.
WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
26. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
27. PRIOR TO THE PROCUREMENTS PROCESS, THE CONTRACTOR SHALL INFORM THE CLIENT OF ANY UPDATE TO REGULATION OR STANDARD WHICH COULD
AFFECT THE EQUIPMENT SELECTION FROM THE DESIGN STAGE.
28. COMBINED FIRE SEALS THROUGH FIRE RATED BUILDING ELEMENTS ARE ALLOWED IN CASE:
1- THE SUITABLE CERTIFICATION FOR THESE FIRE SEALS ISSUBMITTED FOR APPROVAL.
2- THE INSTALLATION FULFILLS MANUFACTURERS REQUIREMENTS.
29. THE INTERFACES BETWEEN THE VENTILATION EQUIPMENT AND THE BUILDING MANAGEMENT SYSTEMS (BMS) ARE TO BE COORDINATED AND AGREED PRIOR TO
THE SITE INSTALLATION.
30. INSPECTION OPENINGS ARE TO BE INSTALLED IN ALL FOUL AND STORM WATER PIPES IN ACCORDANCE WITH DIN 1986-100.
31. INSULATION MATERIAL SHALL ALLOW ZERO CLEARANCE BETWEEN OTHER SIMILAR INSULATED MECHANICAL COMPONENTS WHEN PENETRATING A FIRE RATED
WALL.
1. DIE FOLGENDEN HINWEISE SIND ALLGEMEINER NATUR UND BEZIEHEN SICH AUF DAS GESAMTE PROJEKT. WENN ES AUSNAHMEN, ERGAENZUNGEN ODER AENDERUNGEN ZU DIESEN HINWEISEN GIBT, WERDEN DIESE AUSNAHMEN, ERGAENZUNGEN ODER AENDERUNGEN AUF DER JEWEILIGEN ZEICHNUNG VERMERKT, WO SIE AUFTRETEN.
2. ALLE MATERIALIEN UND GERAETE SIND ZUR VERFUEGUNG ZU STELLEN UND ALLE ERFORDERLICHEN ARBEITEN SIND DURCHZUFUEHREN, UM VOLLSTAENDIGE UND FUNKTIONSFAEHIGE HEIZUNGS-, KAELTE-, LUEFTUNGS- UND SANITAERANLAGEN GEMAESS DEN ZEICHNUNGEN, DES LEISTUNGSVERZEICHNISSES UND DEN EINSCHLÄGIGEN
VORSCHRIFTEN ZU INSTALLIEREN.
3. ALLE IN DIESER PHASE DER PLANUNG EINBEZOGENEN ANLAGEN HABEN DAS TUEV-ZERTIFIKAT ERHALTEN. DER AUFTRAGNEHMER HAT SICHERZUSTELLEN, DASS DIE AUSWAHL
DER ENDGUELTIGEN ANLAGEN UEBER DIESES ZERTIFIKAT VERFUEGEN.
4. DER AUFTRAGNEHMER HAT DIE RAEUMLICHKEITEN GRUENDLICH ZU UNTERSUCHEN UND ALLE BEDINGUNGEN UND UMSTAENDE ZU BEACHTEN, UNTER DENEN DIE ARBEITEN DURCHGEFUEHRT WERDEN SOLLEN. ZUSCHLAEGE FUER FEHLER ODER FAHRLAESSIGKEIT IN DIESER HINSICHT WERDEN NICHT BERUECKSICHTIGT.
5. DER AUFTRAGNEHMER HAT DIE VERTRAGSUNTERLAGEN EINGEHEND ZU PRUEFEN, UM SICH EIN VOLLSTAENDIGES VERSTAENDNIS DES PROJEKTUMFANGS ZU SCHAFFEN.
EIN VERSAEUMNIS DIE VERTRAGSUNTERLAGEN NICHT SORGFAELTIG GEPRUEFT ZU HABEN ENTBINDET DEN AUFTRAGNEHMER NICHT VON SEINER VERANTWORTUNG ALLE
ERFORDERLICHEN ARBEITEN AUSZUFUEHREN.
6. NACH DER UEBERPRUEFUNG DER RAEUMLICHKEITEN UND DER VERTRAGSUNTERLAGEN MUSS DER AUFTRAGNEHMER DEN VERTRETER DES AUFTRAGGEBERES UEBER JEGLICHE UNSTIMMIGKEITEN UND ABWEICHUNGEN, DIE DEN ARBEITSAUFWAND BEEINFLUSSEN WERDEN, INFORMIEREN.
7. DIE ZEICHNUNGEN IN DIESER LEISTUNGSPHASE FUER DIE GEWERKE HEIZUNG, KAELTE, LUEFTUNG UND SANITAER SIND SCHAUBILDLICH UND SOLLEN NUR DEN UMFANG UND DIE
ALLGEMEINE ANORDNUNG WIEDERGEBEN.
8. DIE LAGE UND POSITIONIERUNG ALLER AUF DEN ZEICHNUNGEN AUFGEFUEHRTEN ODER IN DEM LEISTUNGSVERZEICHNIS GEFORDERTEN GEGENSTAENDE, DIE NICHT EINDEUTIG DURCH ABMESSUNGEN FESTGELEGT SIND, SIND NUR ANNAEHERUNGEN. DIE GENAUEN POSITIONEN UM EINEN EINWANDFREIEN BETRIEB ZU GEWAEHRLEISTEN, MUESSEN DURCH DIE BEDINGUNGEN VOR ORT BESTIMMT WERDEN UND MUESSEN VOR DER INSTALLATION VOM INGENIEUR GENEHMIGT WERDEN. DIE ZEICHNUNGEN SIND NICHT ZU SKALIEREN.
9. SOFERN NICHT ANDERS ANGEGEBEN, BEZIEHEN SICH DIE ANGEGEBENEN HOEHENANGABEN AUF DIE MITTELLINIE VON KANAELEN UND ROHREN.
10. DIE INSTALLATION DER HEIZUNGS-, KAELTE-, LUEFTUNGS- UND SANITAERANLAGEN IST MIT DEN ANDEREN GEWERKEN (ARCHITEKTUR, STATIK, ELEKTRO, AUSSENANLAGEN, ETC.), WIE SIE IN ANDEREN ZEICHNUNGEN DER VERTRAGSUNTERLAGEN DARGESTELLT SIND, ZU KOORDINIEREN.
11. DER AUFTRAGNEHMER SOLL ANGEMESSENE AENDERUNGEN IN DER ANORDNUNG DER ROHRLEITUNGEN, LUEFTUNGSKANAELE UND EINRICHTUNGEN VORNEHMEN, DIE FUER EINE ORDNUNGSGEMAESSE AUSFUEHRUNG DER ARBEITEN ERFORDERLICH SIND, UND UM KOLLISIONEN MIT BESTEHENDEN UND NEUEN ANLAGEN EINSCHLIESSLICH LEUCHTEN, VERKABELUNGEN, ROHRLEITUNGEN, LUEFTUNGSKANAELEN, EINRICHTUNGEN ETC. ZU VERMEIDEN. DIESE AENDERUNGEN SIND OHNE ZUSAETZLICHE KOSTEN FUER DEN
AUFTRAGGEBER DURCHZUFUEHREN.
12. ES LIEGT IN DER VERANTWORTUNG DES AUFTRAGNEHMERS ALLE ARBEITEN ZWISCHEN SUBUNTERNEHMERN ZU DELEGIEREN. VERWEISE AUF VERSCHIEDENE GEWERKE IN DIESEN DOKUMENTEN SIND NUR VORGESCHLAGENE VERANTWORTUNGSBEREICHE, DIE AUF DEN UEBLICHEN STANDARDS UND GEFLOGENHEITEN DER INDUSTRIE BASIEREN.
13. WENN DIE VERSCHIEDENEN GEWERKE DER TECHNISCHEN GEBAEUDEAUSRUESTUNG ALS UNTERVERTRAG WEITERGEGEBEN WERDEN, LIEGT ES IN DER VERANTWORTUNG DES HKLS-GENERALUNTERNEHMERS. DIE ARBEITEN DER SUBUNTERNEHMER UND DIE DAMIT VERBUNDENEN VERTRAEGE ZU KOORDINIEREN.
14. WERDEN ZWEI ODER MEHR GERAETE DESSELBEN TYPS BENOETIGT, SO IST DAS PRODUKT NUR EINES HERSTELLERS ZU VERWENDEN.
15. ALLE ANLAGEN, DIE BETRIEBEN, BEDIENT ODER GEWARTET WERDEN MUESSEN, MUESSEN AN EINEM VOLLSTAENDIG ZUGAENGLICHEN ORT INSTALLIERT WERDEN.
16. ALLE VOM HERSTELLER EMPFOHLENEN ABSTAENDE UM ANLAGEN SIND EINZUHALTEN.
17. ALLE STEUERUNGSVERKABELUNGEN UND -LEITUNGEN MUESSEN DEN NATIONALEN NORMEN UND REGELN DER ELEKTROTECHNIK ENTSPRECHEN.
18. HAUSTECHNISCHE ANLAGEN NICHT DURCH ELEKTRO- ODER KOMMUNIKATIONSRAEUME FUEHREN, MIT AUSNAHME VON LEITUNGEN UND ANLAGEN, DIE SPEZIELL FUER DEN
JEWEILIGEN RAUM BESTIMMT SIND.
19. ALLE LUEFTUNGSKANAELE UND ROHRLEITUNGEN SIND MIT ELEKTRO-, KOMMUNIKATIONSLEITUNGEN UND MIT DEM TRAGWERK ZU KOORDINIEREN
20. ZUGANG ZU BRANDSCHUTZKLAPPEN, KONSTANTEN UND VARIABLEN VOLUMENSTROMREGLERN, ANLAGEN ETC. DIE MASSE DER REVISIONSOEFFNUNGEN MUESSEN MINDESTENS 300 mm x 300 mm FUER DEN ZUGANG ZU BRANDSCHUTZKLAPPEN UND VOLUMENSTROMREGLERN BETRAGEN UND 450 MM X 450 MM FUER DEN ZUGANG ZU GERAETEN
BETRAGEN.
21. ALLE FUER DIE ARBEIT ERFORDERLICHEN SCHNITT- UND AUSBESSERUNGSARBEITEN SIND DURCHZUFUEHREN. DIE AUSBESSERUNGEN MUESSEN IM BEZUG AUF MATERIAL, TEXTUR, OBERFLAECHE UND QUALITAET MIT BESTEHENDEN ANGRENZENDEN OBERFLAECHEN UEBEREINSTIMMEN.
22. TRAGENDE BAUTEILE DUERFEN NICHT GESCHLITZT ODER DURCHBROCHEN WERDEN, ES SEI DENN, ES IST IN DEN VERTRAGSUNTERLAGEN AUSDRUECKLICH SO ANGEGEBEN.
23. LAGE, AUSRICHTUNG UND GROESSE ALLER BODEN-, WAND- UND DACHOEFFNUNGEN SIND MIT ANDEREN GEWERKEN ABZUSTIMMEN.
24. ALLE DURCHBRUECHE UND OEFFNUNGEN DURCH BRANDWAENDE, DIE DURCH LUEFTUNGSKANAELE, ROHRLEITUNGEN, LEITUNGEN ETC. VERURSACHT WERDEN, MUESSEN MIT EINER UL-ZUGELASSENE BRANDSCHUTZVORRICHTUNG, DIE DER FEUERBESTAENDIGKEIT DER BRANDWAND ENTSPRICHT, AUSGEFUEHRT WERDEN. BEZIEHEN SICH AUF DIE
BRANDSCHUTZZEICHNUNGEN, UM ZU SICHERSTELLEN, DASS DIE BESTIMMTEN BRANDSCHUTZGRÖSSEN BEI DER BAUWEISE EINGEHALTEN SIND.
25. ALLE LUEFTUNGSKANAELE, ROHRLEITUNGEN UND ANLAGEN, DIE AN DEM STAHLTRAGWERK MONTIERT SIND BZW. VOM TRAGWERK ABGESTUETZT SIND, SIND MIT DEM GENERALUNTERNEHMER ABZUSTIMMEN. ALLE BEFESTIGUNGEN AN STAHLUNTERZUEGEN, FACHWERKTRAEGERN ODER BINDERN MUESSEN SICH AN DEN KNOTEN BEFINDEN.
KLEMMVERBINDUNGEN FUER STAHLTRAEGER SIND NACH MSS-NORMEN BEREITZUSTELLEN. SCHWEISSARBEITEN AN BAUTEILEN UND TRAGWERK SIND NICHT ZULAESSIG. DIE
VERWENDUNG VON C-KLEMMEN IST NICHT ZULAESSIG.
26. ALLE ANLAGEN, ROHRLEITUNGEN, LUEFTUNGSKANAELE ETC. MUESSEN GEMAESS DEN VORGABEN UND ANFORDERUNGEN MONTIERT WERDEN, UM EINE VIBRATIONSFREIE
INSTALLATION ZU GEWAEHRLEISTEN.
27. DER AUFTRAGNEHMER MUSS DEN AUFTRAGGEBER VOR DEM BESCHAFFUNGSPROZESS UEBER JEGLICHE AENDERUNGEN VON VORSCHRIFTEN, NORMEN ODER RICHTLINIEN INFORMIEREN, DIE EINFLUSS AUF DIE IN DER PLANUNGSPHASE AUSGEWAEHLTE ANLAGEN HABEN KOENNTEN.
28. KOMBI- BRANDSCHOTTS DURCH BAUELEMENTE MIT FEUERWIDERSTAND SIND ERLAUBT SOFERN:
1- DIE GEEIGNETE ZERTIFIKATE DAFUER ZUR GENEHMIGUNG VORGELEGT WERDEN.
2- DIE INSTALLATION GEMAESS HERSTELLERVORGABEN ERFOLGT.
29. DIE SCHNITTSTELLEN ZWISCHEN LUEFTUNGSGERAETE UND DER GEBÄUDEMANAGEMENTSYSTEM GLT IST VOR DER INSTALLATION ZU KOORDINIEREN.
30. REVISIONSOEFFNUNGEN SIND AN SCHMUTZ- UND REGENWASSERLEITUNGEN GEMAESS DIN EN 1986-100 ZU INSTALLIEREN.
31. DAS ISOLIERMATERIAL ERLAUBT BEI DER DURCHFUEHRUNG DURCH EINE FEUERBESTAENDIGE WAND EINEN NULLABSTAND ZWISCHEN ANDEREN AEHNLICH ISOLIERTEN HKLS
BAUTEILEN.
GENERAL MECHANICAL NOTES ALLGEMEINE HINWEISE ZU DEN HKLS-GEWERKEN
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
.1
1.
3:
:4
M
EC
H
AN
IC
AL
G
EN
ER
AL
N O
TE
S
(I)
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
M-001
H
LK
A
LL
G E
M E
IN
E
H
IN
W E
IS
E
(I
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL WORKS REQUIRED TO INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AND IN
ACCORDANCE WITH THE RELEVANT STANDARDS AND CODES.
2. ELEVATIONS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURIZED PIPING AND THE INVERT OF ALL GRAVITY PIPING.
3. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE OR SOFFIT WITH SPACE FOR INSULATION IF REQUIRED.
4. ALL PIPEWORK IS TO BE INSTALLED FREE OF ANY TENSIONING OR FORCING.
5. ALL PIPEWORK IS TO BE INSTALLED CLEAR AND NOT IN FRONT OF DOORS AND WINDOWS.
6. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
7. HYDRONIC PIPING SHALL HAVE AIR VENTS AT ALL HIGH POINTS. COCKS AT THE BOTTOM OF VERTICAL RISER PIPES AND AT LOW POINTS OF THE SYSTEM.
8. CLEANOUT OPENINGS ARE TO BE THE SAME SIZE AS THE DIAMETER OF THE PIPEWORK THEY ARE CONNECTED TO.
9. ANY PENETRATIONS THROUGH FLOOR SLABS ARE TO BE FIRE STOPPED.
10. FIRESTOP SYSTEMS AND DEVICES SHALL BE FIRE RATED NOT LESS THAN 1 ½ HOUR, AND NEVER LESS THAN THE REQUIRED FIRE RATING OF THE FIRE BARRIER PENETRATED.
11. IN ACCORDANCE WITH THE NFPA AND LAR GUIDANCES, ANY INSULATED NON-COMBUSTIBLE PIPE OR PIPE FOR NON-COMBUSTIBLE MEDIA WITH AN EXTERNAL DIAMETER OF <160 mm CAN PENETRATE FIRE RATED WALLS IF THE INSULATION IS REMOVED AND REPLACED WITH A FIRE RATED SLEEVE OF MINIMAL THICKNESS AND MINIMAL LENGTH FROM
THE FIRE WALL AND THE RING GAP BETWEEN PIPE AND STRUCTURE IS SUITABLY SEALED.
FOR NON-COMBUSTIBLE PIPES WITHOUT INSULATION THE RING GAP IS TO BE SEALED WITH INTUMESCENT MATERIAL IN ACCORDANCE WITH SECTION 4.1.2 OF THE NFPA GUIDANCE -
OR - ACCORDING TO SECTION 4.3.1 D) WITH CEMENT MORTAR OR CONCRETE.
12. WHERE THE BUILDERSWORK PENETRATIONS ARE TO BE EXECUTED AND TESTED/AUDITED AS PART OF AN INSTALLATION, THEY ARE TO BE TESTED AND CLASSIFIED IN ACCORDACE WITH ASTEM EI 19.FIRE TEST METHODS FOR BUILDINGS AND MATERIALS OR THE STANDARD ANSI/UL 263. FOR FIRE TEST METHODS FOR BUILDINGS AND MATERIALS. BUILDERSWORK PENETRATIONS ARE TO BE FIRE SEALED IN ACCORDANCE WITH AN APPROVED PROCEDURE AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS.
13. THE CONTRACTOR IS TO LIAISE WITH THE CLIENT PRIOR TO SITE COMMENCEMENT OF ANY PIPING WORKS FOR THE PURPOSE OF A SITE SURVEY TO ENSURE THE SUCCESS OF THE
PROJECT.
14. A PVC DRIP TRAY SHALL BE INSTALLED TO ANY PIPEWORK THAT IS ROUTED ABOVE ANY CABLE CONTAINMENT OR ELECTRICAL EQUIPMENT TO ENSURE LEAK PROTECTION.
15. REFER TO MECHANICAL SERVICES DRAWINGS FOR FURTHER INFORMATION ON INSULATION.
16. VERTICAL AND HORIZONTAL PLASTIC PIPES SHALL BE SUPPORTED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND SHALL ALSO BE SUPPORTED AT
CHANGES OF DIRECTION OR ELEVATION.
17. VERTICAL AND HORIZONTAL STAINLESS STEEL PIPES SHALL BE SUPPORTED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS BUT AT NOT GREATER DISTANCES
AS LISTED BELLOW:
VERTICAL PIPES- BETWEEN EACH FLOOR'S HORIZONTAL PIPE AT 3 METERS HORIZONTAL PIPE- 3 METERS CENTERS, CHANGES OF DIRECTION AND BRANCH CONNECTION.
18. HEATING WATER TOWEL RADIATORS WILL HAVE THE THERMOSTATIC SENSOR HEAD TO CONTROL THE RADIATOR FLOW INSTALLED ON THE SUPPLY SIDE.
19. MINIMUM DISTANCE BETWEEN PIPES IN THE FIELD OF PLUMBING & HEATING, INCLUDING THE INSULATION, ALONG THE SHAFTS MUST BE AT LEAST 50 mm. INSULATION ACROSS FIRE RATED SLAB PENETRATION WILL BE NON-COMBUSTIBLE IN A LENGTH OF AT LEAST ONE METER.
20. ROOF SLOPES SHALL COMPLY WITH ASME A112.6.4 REQUIREMENTS AND INCLUDE ANY DECK CLAMPS OR OTHER AIDS REQUIRED FOR INSTALLATION.
21. SPRINKLER TANK DRAINAGE MUST BE COORDINATED WITH TANK OVERFLOW PRIOR TO INSTALLATION.
1. ALLE MATERIALIEN UND GERAETE SIND ZUR VERFUEGUNG ZU STELLEN UND ALLE ARBEITEN DURCHZUFUEHREN, DIE ERFORDERLICH SIND, UM KOMPLETTE UND FUNKTIONSFAEHIGE ROHRLEITUNGSSYSTEME GEMAESS DEN ZEICHNUNGEN, DES LEISTUNGSVERZEICHNISSES UND DEN ANERKANNTEN REGELN DER TECHNIK ZU INSTALLIEREN.
2. DIE AUF DEN ZEICHNUNGEN DARGESTELLTEN HOEHENANGABEN BEZIEHEN SICH AUF DIE ROHRACHSE ALLER DRUCKLEITUNGEN UND DIE ROHRSOHLE ALLER FREISPIEGELLEITUNGEN.
3. SOFERN NICHT ANDERS ANGEGEBEN, SIND ALLE ROHRLEITUNGEN UEBER KOPF, DICHT AN DER UNTERSEITE DER KONSTRUKTION BZW. DER DECKE MIT PLATZ FUER DIE DAEMMUNG (FALLS ERFORDERLICH), ZU INSTALLIEREN.
4. ALLE ROHRLEITUNGEN SIND OHNE EINWIRKUNG VON SPANNUNG ODER KRÄFTEN ZU INSTALLIEREN.
5. ALLE ROHRLEITUNGEN MUESSEN TUEREN UND FENSTER FREIHALTEN UND DIESE NICHT EINSCHRAENKEN.
6. ALLE ROHRLEITUNGSARBEITEN SIND MIT ALLEN ANDEREN GEWERKEN ZU KOORDINIEREN. VERSAETZE IN ROHRLEITUNGEN UM HINDERNISSE HERUM SIND OHNE ZUSAETZLICHE KOSTEN FUER DEN
AUFTRAGGEBER AUSZUFUEHREN.
7. ROHRLEITUNGSSYSTEME FUER WASSER MUESSEN AN ALLEN OBENLIEGENDEN STELLEN MIT ENTLUEFTUNGSVENTILEN VERSEHEN SEIN. ABLASSVENTILE SIND UNTERHALB VON VERTIKALEN
ROHRSTEIGLEITUNGEN UND AN TIEFPUNKTEN DER ANLAGE VORZUSEHEN.
8. ALLE REINIGUNGSOEFFNUNGEN SOLLTE ENTSPRECHEND DEM DURCHMESSER DES ROHRES BEMESSEN SEIN, AN DAS SIE MONTIERT SIND.
9. ALLE BODENDURCHBRUECHE MUESSEN BRANDGESCHOTTET WERDEN.
10. BRANDSCHUTZSYSTEME UND -VORRICHTUNGEN MUESSEN MINDESTENS 90MIN UND MINDESTENS DIE ERFORDERLICHE FEUERWIDERSTANDSDAUER DES BAUTEILS MIT BS QUALITAET AUFWEISEN.
11. GEMAESS NFPA UND LAR KANN JEDE NICHT BRENNBARE ROHRLEITUNG ODER ROHRLEITUNG FUER NICHT BRENNBARE MEDIEN MIT EINEM AUSSENDURCHMESSER VON <160 mm EINE BRANDWAND DURCHDRINGEN, WENN DIE DAEMMUNG DURCH EINE ROHRSCHALE MIT AUSREICHENDEM DURCHMESSER UND BIS ZU EINER AUSREICHENDEN ENTFERNUNG VON DER WAND GEFUEHRT WIRD UND DIE
RINGSPALT ZWISCHEN ROHR UND WAND ANGEMESSEN ABGEDICHTET WIRD.
BEI NICHT BRENNBAREN ROHRLEITUNGEN OHNE WAERMEDAEMMUNG IST DER RINGSPALT NACH ABSCHNITT 4.1.2 DES NFPA RICHTLINIEN UND GEMAESS DER ZULASSUNG DES INTUMESZIERENDEN MATERIALS ABZUDICHTEN - ODER - GEMAESS ABSCHNITT 4.3.1 D MIT ZEMENTMOERTEL ODER BETON ABZUDICHTEN.
12. WO DURCHBRUECHE DURCHGEFUEHRT WERDEN UND ALS TEIL DER INSTALLATION GEPRUEFT WERDEN, SIND DIESE GEMAESS DEM ASTEM EI 19. ODER DEM ANSI/UL 263. STANDARD BRANDPRUEFVERFAHREN FUER BAUWERKE UND WERKSTOFFE ZU PRUEFEN. DURCHBRUECHE SIND NACH EINEM ZUGELASSENEN VERFAHREN BRANDSCHUTZTECHNISCH ABZUDICHTEN UND GEMAESS
DEN ANWEISUNGEN DES HERSTELLERS INSTAND ZU HALTEN.
13. VOR DER AUSFUEHRUNG JEGLICHER ROHRLEITUNGARBEITEN HAT DER AUFTRAGNEHMER MIT DEM AUFTRAGGEBER EINEN TERMIN ZUR BESICHTIGUNG ZU VEREINBAREN UM EINEN ERFOLGREICHEN
PROJEKTABLAUF SICHER ZU STELLEN.
14. EINE PVC-WANNE SOLLTE AN ROHRLEITUNGEN BEFESTIGT WERDEN, DIE UEBER EINER KABELTRASSE ODER EINER ELEKTRISCHEN EINRICHTUNG INSTALLIERT SIND, UM EINEN LECKAGESCHUTZ ZU
GEWAEHRLEISTEN.
15. WEITERE INFORMATIONEN ZUR WAERMEDAEMMUNG FINDEN SIE IN DEN HKLS-PLAENEN.
16. VERTIKALE UND HORIZONTALE KUNSTSTOFFROHRE SIND GEMAESS DEN EMPFEHLUNGEN DES HERSTELLERS ZU BEFESTIGEN UND AUCH BEI RICHTUNGS- ODER HOEHENAENDERUNGEN ZU BEFESTIGEN.
17. VERTIKALE UND HORIZONTALE EDELSTAHLROHRE SIND GEMAESS DEN EMPFEHLUNGEN VOM HERSTELLER ZU BEFESTIGEN, JEDOCH IN NICHT GROESSEREN ABSTAENDEN, WIE UNTEN AUFGEFUEHRT:
VERTIKALE ROHRE - IN JEDEM STOCKWERK.
HORIZONTALE ROHRE - 3 METER INTERVALLE, RICHTUNGSAENDERUNGEN UND ABZWEIGVERBINDUNGEN..
18. BEI HANDTUCH-HEIZKOERPERN WIRD DER THERMOSTAT-FUEHLERKOPF ZUR REGELUNG DES HEIZKÖRPERDURCHFLUSSES AUF DER VERSORGUNGSSEITE INSTALLIERT.
19. DER MINIMALE ABSTAND ZWISCHEN ROHRLEITUNGEN IM BREICH SANITAER & HEIZUNG INKLUSIVE DAEMMUNG ENTLANG DES SCHACHTES MUSS MINDENSTENS 50 mm BETRAGEN. DIE DAEMMUNG DURCH FEUERSCHUTZWAENDE MUSS MINDESTENS MIT EINEM METER NICHT BRENNBARER DAEMMUNG SEIN.
20. DACHABLAEUFE MUESSEN DEN ASME A112.6.4 AUFLAGEN ENTSPRECHEN UND ALLE DECKSKLEMMEN ODER ANDERE HILFSMITTEL UMFASSEN, DIE FUER DEN EINBAU ERFORDERLICH SIND
21. DIE ENTLEERUNG DES SPRINKLERTANKS MUSS VOR DER INSTALLATION MIT DEM TANKUEBERLAUF KOORDINIERT WERDEN
GENERAL MECHANICAL NOTES ALLGEMEINE HINWEISE ZU DEN HKLS-GEWERKEN
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
.1
2.
4:
:1
M
EC
H
AN
IC
AL
G
EN
ER
AL
N O
TE
S
(II
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
M-002
H
LK
A
LL
G E
M E
IN
E
H
IN
W E
IS
E
(I I)
SYSTEM ABBREVIATIONS MECHANICAL /
SYSTEM ABKUERZUNGEN HLK
HEATING WATER SUPPLY
HEIZUNG VORLAUFHWS
HEATING WATER RETURN
HEIZUNG RUECKLAUFHWR
CWS
CWR COOLING WATER RETURN
KAELTE RUECKLAUF
COOLING WATER SUPPLY
KAELTE VORLAUF
GVS GENERAL VENTILATION SUPPLY
ZULUFT
GVR GENERAL VENTILATION RETURN
ABLUFT
GVE GENERAL VENTILATION EXHAUST
FORTLUFT
FAI FRESH AIR INTAKE
AUSSENLUFT
ABBREVIATIONS MECHANICAL /
ABKUERZUNGEN HLK
NOMINAL DIAMETER
NENNDURCHMESSERDN
EXPANSION VESSEL
AUSDEHNUNGSGFAESSEXV
PUMP
PUMPEP
HEAT EXCHANGER
WAERMETAUSCHERHE
BUFFERSTORAGE
PUFFERSPEICHERBT
RADIANT FLOOR MANIFOLD
FUSSBODENHEIZKREISVERTEILERMHS
TEMPERATURE SENSOR
TEMPERATUR SENSORTS
3-PORT CONTROL VALVE
MOTORISIERTES 3-WEGE VENTIL3-WV
2-PORT CONTROL VALVE
MOTORISIERTES 2-WEGE VENTIL2WV
ENERGY METER
WAERMEMENGENZAEHLEREMR
FLOW
STROEMUNGQ
AIR HANDLING UNIT
LUEFTUNGSGERAETAHU
DIRECT DIGITAL CONTROL
DIREKTE DIGITALE STEUERUNGDDC
ELECTRICAL HEATER
ELEKTRISCHER HEIZEREH
CENTRELINE
ROHRACHSERA
ABOVE UNFINISHED FLOOR LEVEL
OBERKANTE ROHFUSSBODENOKRFB
SS STEAM SUPPLY
DAMPFVERSORGUNG
CR CONDENSATE RECIRCULATION
KONDENSATRUECKFUEHRUNG
LEGEND VENTILATION FLOOR PLAN /
LEGENDE LUEFTUNG GRUNDRISS
GENERAL VENTILATION SUPPLY
ZULUFT
GENERAL VENTILATION EXHAUST
FORTLUFT
DIRECTIONAL INDICATIONS THROUGHOUT
RICHTUNGSHINWEISE HINDURCHGEHEND
BEGINNING RUNNING UP / DOWN
BEGINNEND AUF- / ABWAERTS VERLAUFEND
COMMING AND ENDING FROM ABOVE
VON OBEN KOMMEND UND ENDEND
SUPPLY AIR DISC VALVE
ZULUFT TELLERVENTIL
EXTRACT AIR DISC VALVE
ABLUFT TELLERVENTIL
FLEXIBLE AIR DUCT
FLEXIBLER KANAL
SUPPLY AIR GRILLE
ZULUFTGITTER
EXTRACT AIR GRILLE
ABLUFTGITTER
VOLUME FLOW CONTROLLER CONSTANT
VOLUMENSTROMREGLER KONSTANT
VOLUME DAMPER
DROSSELKLAPPE
FIRE DAMPER RECTANGULAR
BRANDSCHUTZKLAPPE RECHTECKIG
FIRE DAMPER ROUND
BRANDSCHUTZKLAPPE RUND
CONCEALED FAN COIL UNIT
FAN COIL VERDECKT
OVERFLOW
UEBERSTROEMUNG
AIR HANDLING UNIT ROOF (AHU)
RLT GERAET DACH
SUPPLY / EXTRACT AIR DIFFUSER
ZU- ABLUFT DRALLDURCHLASS
ROOF FAN
DACHVENTILATOR
AIR HANDLING UNIT MECHANICAL ROOM (AHU)
RLT GERAET TECHNIKRAUM
LEGEND COOLING FLOOR PLAN /
LEGENDE KAELTE GRUNDRISS
CHILLED WATER SUPPLY 6°C
KAELTE VORLAUF 6°C
CHILLED WATER RETURN 12°C
KAELTE RUECKLAUF 12°C
DIRECTIONAL INDICATIONS THROUGHOUT
RICHTUNGSHINWEISE HINDURCHGEHEND
BEGINNING RUNNING UP / DOWN
BEGINNEND AUF- / ABWAERTS VERLAUFEND
COMMING AND ENDING FROM ABOVE
VON OBEN KOMMEND UND ENDEND
CONCEALED FAN COIL UNIT
VERDECKTER UMLUFTGERAET
CEILING CASSETTE
DECKENKASSETTE
CHILLED WATER WALL MOUNTED UNIT
KALTWASSER-WANDGERAET
REFRIGERATION WATER SUPPLY
KAELTEMITTEL VORLAUF
REFRIGERATION WATER RETURN
KAELTEMITTEL RUECKLAUF
REFRIGERATION WALL MOUNTED UNIT
KAELTEMITTEL-WANDGERAET
MULTISPLIT CONDENSING UNIT
MULTISPLIT VERFLUESSIGUNGSSATZ
SYSTEM ABBREVIATIONS VENTILATION /
SYSTEM ABKUERZUNGEN LUEFTUNG
FAN COIL UNIT
FAN COIL UNITFCU
AIR HANDLING UNIT
RLT GERAETAHU
GVS
GVE GENERAL VENTILATION EXHAUST
ABLUFT
GENERAL VENTILATION SUPPLY
ZULUFT
FD FIRE DAMPER
BRANDSCHUTZKLAPPE (BSK)
LEGEND HEATING FLOOR PLAN /
LEGENDE HEIZUNG GRUNDRISS
FLOW HEATING PIPE 70°C
HEIZUNG VORLAUF 70°C
RETURN HEATING PIPE 50°C
HEIZUNG RUECKLAUF 50°C
PANEL RADIATOR
PLATTENHEIZKOERPER
TOWEL RADIATOR
HANDTUCH-HEIZKOERPER
DIRECTIONAL INDICATIONS THROUGHOUT
RICHTUNGSHINWEISE HINDURCHGEHEND
BEGINNING RUNNING UP / DOWN
BEGINNEND AUF- / ABWAERTS VERLAUFEND
COMMING AND ENDING FROM ABOVE
VON OBEN KOMMEND UND ENDEND
CEILING CASSETTE
DECKENKASSETTE
HEATING PIPE EXPANSION LOOP
HEIZUNGSROHR DEHNUNGSBOGEN
FLOOR CONVECTOR
BODENKONVEKTOR
CONCEALED FAN COIL UNIT
VERDECKTER UMLUFTGERÄT
LEGEND STEAM / DISTRICT HEATING DIAGRAM /
LEGENDE DAMPF / FERNWAERME SCHEMA
DISTRICT HEATING SUPPLY
FERNWAERME VORLAUF
DISTRICT HEATING RETURN
FERNWAERME RUECKLAUF
SHUT-OFF VALVE
ABSPERRVENTIL
2-WAY MOTORIZED VALVE
2 WEGE-VENTIL MOTORISIERT
STRAINER WITH FINE SIEVE
SCHMUTZFAENGER MIT FEINSIEB
PUMP
PUMPE
NON-RETURN VALVE
RUECKSCHLAGKLAPPE
TEMPERATURE SENSOR
TEMPERATUR SENSOR
TS
TI
PI
SF
M
R/B
THERMOMETER
THERMOMETER
PRESSURE GAUGE
MANOMETER
HEATING STEAM HIGH PRESSURE
FERNWAERME DAMPF VORLAUF
HEATING STEAM LOW PRESSURE
FERNWAERME DAMPF RUECKLAUF
DOMESTIC COLD WATER
TRINKWASSER KALT
STEAM/WATER TUBE BUNDLE HEAT EXCHANGER
DAMPF/WASSER ROHRBUENDEL WAERMETAUSCHER
EXPANSION VESSEL
AUSDEHNUNGSGEFAESS
CONDENSATE TRAP
KONDENSATABSCHEIDER
CONDENSATE CONTROL VALVE
KONDENSATKONTROLLVENTIL
B
TEMPERATURE REGULATOR / LIMITER
TEMPERATURREGLER / -BEGRENZER
SAFETY TEMPERATURE LIMITER
SICHERHEITSTEMPERATURBEGRENZER
SAFETY PRESSURE LIMITER
SICHERHEITSDRUCKBEGRENZERMAX B
SAFETY VALVE
SICHERHEITSVENTIL
VAPOSCOPE
VAPOSKOPE
MOTORIZED SAFETY VALVE
MOTORISIERTES SICHERHEITSVENTIL
DRAIN VALVE
ABLASSVENTIL
M
LOCKSHIELD VALVE
KAPPENVENTIL
LEGEND STEAM / DISTRICT HEATING FLOOR PLAN /
LEGENDE DAMPF / FERNWAERME GRUNDRISS
DISTRICT HEATING SUPPLY
FERNWAERME VORLAUF
DISTRICT HEATING RETURN
FERNWAERME RUECKLAUF
HEATING STEAM HIGH PRESSURE
FERNWAERME DAMPF VORLAUF
HEATING STEAM LOW PRESSURE
FERNWAERME DAMPF RUECKLAUF
STEAM/WATER TUBE BUNDLE HEAT EXCHANGER
DAMPF/WASSER ROHRBUENDEL WAERMETAUSCHER
STRAINER WITH FINE SIEVE
SCHMUTZFAENGER MIT FEINSIEB
MOTORIZED SHUT OFF VALVE
MOTORISIERTES ABSPERRVENTIL
SAFETY VALVE
SICHERHEITSVENTIL
EXPANSION TANK
AUSDEHNUNGSTANK
PUMP
PUMPE
BUTTERFLY VALVE
ABSPERRKLAPPE
LEGEND VENTILATION DIAGRAMS /
LEGENDE LUEFTUNG SCHEMA
GENERAL VENTILATION SUPPLY
ZULUFT
GENERAL VENTILATION EXHAUST
FORTLUFT
DIRECTIONAL INDICATIONS THROUGHOUT
RICHTUNGSHINWEISE HINDURCHGEHEND
BEGINNING RUNNING UP / DOWN
BEGINNEND AUF- / ABWAERTS VERLAUFEND
COMMING AND ENDING FROM ABOVE
VON OBEN KOMMEND UND ENDEND
SUPPLY AIR DISC VALVE
ZULUFT TELLERVENTIL (TVZ)
EXTRACT AIR DISC VALVE
ABLUFT TELLERVENTIL (TVA)
AIR HANDLING UNIT
RLT GERAET
AIR SUPPLY GRILLE
ZULUFTGITTER
GENERAL VENTILATION SUPPLY (RECTANGULAR DUCT)
ZULUFT (RECHTECKIGER KANAL)
GENERAL VENTILATION RETURN (RECTANGULAR DUCT)
ABLUFT (RECHTECKIGER KANAL)
GENERAL VENTILATION EXHAUST (ROUND DUCT)
FORTLUFT (KANAL RUND)
GENERAL VENTILATION SUPPLY (ROUND DUCT)
ZULUFT (KANAL RUND)
FLEXIBLE SUPPLY AIR DUCT
FLEXIBLER ZULUFTKANAL
FLEXIBLE EXTRACT AIR DUCT
FLEXIBLER ABLUFTKANAL
FIRE DAMPER
BRANDSCHUTZKLAPPE (BSK)
CONCEALED FAN COIL UNIT
FAN COIL, VERDECKT
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
.1
1.
3:
:5
M
EC
H
AN
IC
AL
G
EN
ER
AL
LE
G
EN
D
S
AN
D A
BB
R
EV
IA
TI
O
N S
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
M-003
H
LK
A
LL
G E
M E
IN
E
LE
G
E N
D E
N U
N D
A B
K U
E R
ZU
N
G E
N
DD
W W
D
DD
D
L
K
J
H
G
F
E
D
C
B
A
1 2 3 3.5 4 5 5.5 6 7 8 9 10 10.5 11 12 12.5 13 14 15 16
MH411
MH412
MH413
L
K
J
H
G
F
E
D
C
B
A
1 2 3 3.5 4 5 5.5 6 7 8 9 10 10.5 11 12 12.5 13 14 15 16
MH421
MH421
GRAPHIC SCALE
MASSSTABSBALKEN
40 128 16
1:200
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:5
M
EC
H
AN
IC
AL
V
EN
TI
LA
TI
O
N O
VE
R
AL
L
PL
AN
S G
R O
U N
D F
LO
O
R A
N D
T
YP
IC
AL
G U
ES
T
FL
O
O R
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH101
H
LK
L U
E
FT
U N
G G
R U
N D
R
IS
S P
LA
E
N E
E R
D -U
N D
R E
G E
LG
E
S C
H O
S S
SCALE / MASSSTAB: 1 : 200
LUEFTUNG, GRUNDRISSPLAN, ERDGESCHOSS
VENTILATION, OVERALL PLAN, GROUND FLOOR1
SCALE / MASSSTAB: 1 : 200
LUEFTUNG, GRUNDRISSPLAN, REGELGESCHOSS
MH121-Overview2
L
K
J
H
G
F
E
D
C
B
A
1 2 3 3.5 4 5 5.5 6 7 8 9
029B
BED
031B
BED
FAMILY SUITE 02
265 m³/h
031A
BATH
EXTENDED STAY 01
(ABA)
170 m³/h
EXTENDED STAY 03
(ABA)
170 m³/h
FAMILY SUITE 01
265 m³/h
FAMILY SUITE 03
265 m³/h 026B
BED
025B
BED
FAMILY SUITE 05
265 m³/h
FITNESS
310 m³/h
BREAKFAST
AREA/DINING
610 m³/h
EXTENDED STAY 02
(ABA)
170 m³/h
FAMILY SUITE 04
265 m³/h 033B
BED
034B
BED
FAMILY SUITE 06
265 m³/h
CORRIDOR
033A
BATH
034A
BATH
TOILET
TOILET
CORR.
LOBBY
VESTIBULE
028A
BATH
032A
BATH
027A
BATH
029A
BATH EL-2
ELEV.
MH301
ST-1
STAIR 038
FAS/MNS
CORRIDOR
JANITOR
200ø
UKK= 3145 OKRFB
600x300
UKK= 3200 OKRFB
450x400
UKK= 3050 OKRFB
026A
BATH
350 m³/h
025A
BATH
40 m³/h160ø 160ø
350 m³/h
40 m³/h
40 m³/h
160ø
UKK= 3109 OKRFB
160ø
UKK= 3109 OKRFB
UKK= 3125 OKRFB
265 m³/h
40 m³/h
200ø
UKK= 3084 OKRFB
200ø
UKK= 3148 OKRFB
350 m³/h
300x300
265 m³/h 40 m³/h
0ø
U
KK
O
KR
FB
250ø
UKK= 3100 OKRFB
220 m³/h
240 m³/h
220 m³/h
210 m³/h
210 m³/h
350x300
200x200
200x200 300x250
250x250
250x250300x250 350 m³/h
240 m³/h
220 m³/h
60 m³/h
60 m³/h
265 m³/h 40 m³/h
40 m³/h40 m³/h265 m³/h
220 m³/h
200 m³/h 200 m³/h
200 m³/h
200 m³/h
0ø
170 m³/h
265 m³/h
GF-FD-02
GF-MD-02
GF-FD-02
200x150250x200
155 m³/h
200x200
200ø 200ø
200ø
160ø
UKK= 2761 OKRFB
0ø
0ø
0ø
0ø
350x200
UKK= 3320 OKRFB
0ø
0ø
0ø
160ø 265 m³/h
170 m³/h
0ø
0ø
160ø
160ø
160ø
160ø
0ø
0ø
0ø160ø
160ø
160ø
0ø
300x300
350x300
400x350
0ø
200ø
610 m³/h
350x300
0ø
0ø
5ø ø
160 m³/h
160 m³/h
160 m³/h
160 m³/h
200ø
200ø
400x350
200ø
UKK= 3500 OKRFB
0ø
200ø
200ø
200ø
200ø
0ø
U
KK
O
KR
FB
200ø
200ø
250ø
0ø
0ø
U
KK
U
KR
D
250ø
UKK= 3475 OKRFB
160ø
UKK= 2761 OKRFB
250x200
UKK= 3050 OKRFB
01 02
02 02
03 03
03 03
03 03 03
03 03
03 03
06 06
10 14
00 60
520 710 1070 460
1090 2920 1090 1150
820 420 1190
0ø
U
KK
O
KR
FB
155 m³/h
155 m³/h
155 m³/h
160ø
160ø
1140 1810
3110 2440
1660 340
1600 1100 1180
1600 1100 1180
1160 400340 1360
2020 570570 2020
170 m³/h
640 1230
1270 330
590 1220 870 2410
200ø
1040 120
250ø
UKK= 3475 OKRFB
990 520 1540 510
09301200
640 1220 2340 1140 1100 1100 1140 2300 1270 330
GRAPHIC SCALE
MASSSTABSBALKEN
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:4
M
EC
H A
N
IC
AL
V
EN
TI
LA
TI
O N
PA
R
TI
AL
P
LA
N G
R O
U N
D F
LO
O
R P
AR
T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH111
H
LK
L U
E
FT
U N
G P
LA
N
TE
IL
E R
D G
E S
C H
O S
S T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
LUEFTUNG, PLANTEIL, ERDGESCHOSS TEIL 1 VON 2
VENTILATION, PARTIAL PLAN, GROUND FLOOR PART 1 OF 21
01 SHADOW JOINT SCHATTENFUGE
02 DOOR UNDERCUT FOR AIR
TRANSFER
TUERUNTERSCHNITT FUER
LUFTDURCHLASS
03 PENETRATION THROUGH FIRE
RATED WALL
WANDDURCHFUEHRUNG
04 LOUVRES WETTERSCHUTZGITTER
05 GRID IN THE WALL 1300x550 GITTER IN DER WAND 1300x550
R
EF
ER
T
O D
R
AW
IN
G
M H
R
EF
ER
T
O D
R
AW
IN
G
M H
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 255 m3/h BEDROOM +/- 127 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
WOHNZIMMER +/- 255 m3/h SCHLAFZIMMER +/- 127 m3/h
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 426 m3/h BEDROOM +/- 209 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
WOHNZIMMER +/- 426 m3/h SCHLAFZIMMER +/- 209 m3/h
K
J
H
G
F
E
D
C
B
A
9 10 10.5 11 12 12.5 13 14 15 16
ELECTRICAL 016A
HOUSEKEEPING
OFFICE
80 m³/h
HOUSEKEEPING/
LAUNDRY
1480 m³/h
MAINTENANCE
170 m³/h
MECH.
006C
MANAGER'S OFFICE
90 m³/h
VESTIBULE
FRONT DESK
EL-1
ELEV.
SERVICE
CORRIDOR
006B
CASH
60 m³/h 006A
LUGGAGE
60 m³/h
ADMINISTRATION
260 m³/h
UNISEX ABA TLT.
187 m³/h
COMM
MEN'S RESTROOM
540 m³/h
WOMEN'S
RESTROOM
540 m³/h
RECEIVING
012A
RECEIVING OFFICE
80 m³/h
BULK STORAGE
320 m³/h
ELEV. EQUIP.
BREAKROOM
520 m³/h
GENERAL STORAGE
80 m³/h
EL-2
ELEV.
MH301
MH301
FIRE PUMP ROOM
ST-2
STAIR
160ø
UKK= 3210 OKRFB
100ø
UKK= 3375 OKRFB
200ø
UKK= 3490 OKRFB
160ø
UKK= 3595 OKRFB
160ø
UKK= 3595 OKRFB
300x250
UKK= 3125 OKRFB
300x250
UKK= 3125 OKRFB
1000x400
UKK= 2950 OKRFB
80 m³/h 160 m³/h160 m³/h
260 m³/h
260 m³/h
180 m³/h 180 m³/h180 m³/h
180 m³/h
90 m³/h
740 m³/h
740 m³/h
190 m³/h
80 m³/h
90 m³/h
90 m³/h
60 m³/h
80 m³/h
80 m³/h
80 m³/h
160 m³/h 160 m³/h
260 m³/h
260 m³/h
180 m³/h
180 m³/h
180 m³/h
90 m³/h
90 m³/h
80 m³/h 90 m³/h
740 m³/h
740 m³/h
190 m³/h
80 m³/h
60 m³/h
180 m³/h
80 m³/h
180 m³/h
170 m³/h m
³/h
220 m³/h
240 m³/h
220 m³/h
210 m³/h
60 m³/h
50 m³/h
350 m³/h350 m³/h
60 m³/h
210 m³/h
60 m³/h
50 m³/h100ø
UKK= 3375 OKRFB
250x250
UKK= 3100 OKRFB
1000x400
UKK= 3024 OKRFB
160ø
UKK= 3145 OKRFB
160ø
UKK= 3170 OKRFB
350x300
400x350
600x400
600x400
800x400
UKK= 3025 OKRFB
800x400 800x400
180 m³/h
400x350
UKK= 3050 OKRFB
250ø
UKK= 3475 OKRFB
350x300
UKK= 3075 OKRFB
160ø
UKK= 3510 OKRFB
0ø
U
KK
O
KR
FB
300x300
UKK= 3075 OKRFB
300x300
UKK= 3075 OKRFB
7790 7600 7900 3400 900 12100 2500 1500
250ø250ø
350x300 250x250
UKK= 3100 OKRFB
200ø
200ø 160ø
200ø
350 m³/h
170 m³/h
KITCHEN PREP
242 m³/h
125 m³/h 125 m³/h
125 m³/h 125 m³/h
200ø
UKK= 3500 OKRFB
100ø
UKK= 3550 OKRFB
200ø
200ø
0ø
0ø
U
KK
O
KR
FB
0ø
U
KK
O
KR
FB
200ø
200ø
100ø
0ø
0ø
0ø
160ø
160ø
250ø
80ø160ø
180 m³/h
0ø
0ø 180 m³/h 20 0ø
0ø
0ø
0ø
0ø
0ø
1000x400
600x500
500x600
0ø16
0ø
160ø
160ø
700x150
0ø
100ø
100ø
UKK= 3175 OKRFB
100ø
UKK= 3175 OKRFB
200ø315ø
160ø
300x300250x250
250ø
0ø
0ø
U
KK
U
KR
D
250x250
UKK= 3030 OKRFB
160ø
250ø
UKK= 3475 OKRFB
03 03
03 03 03
03 03
03 03 03 0303
820 420 1190 830 650 620
1380 2200730
870 2000
14302400
640 1200
920 500
890 830 720 800 870 730 770
490 1360 1100
830 2420 340 900
1100 750 2670 680
720 2400 760 660
1460 1320 1120
1130 1940 2700 890
2570 1800830 1850
0 1750
1080 450 1500
680 680 830
1420 640 750 2400640 620
390 1160 2230
1610 1100
910 2670 360
160ø
250ø
UKK= 3475 OKRFB
RF-AHU-03
RF-AHU-04
GRAPHIC SCALE
MASSSTABSBALKEN
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:2
M
EC
H A
N
IC
AL
V
EN
TI
LA
TI
O N
PA
R
TI
AL
P
LA
N G
R O
U N
D F
LO
O
R P
AR
T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH112
H
LK
L U
E
FT
U N
G P
LA
N
TE
IL
E R
D G
E S
C H
O S
S T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
LUEFTUNG, PLANTEIL, ERDGESCHOSS TEIL 2 VON 2
VENTILATION, PARTIAL PLAN, GROUND FLOOR PART 2 OF 21
R
EF
ER
T
O D
R
AW
IN
G
M H
R
EF
ER
T
O D
R
AW
IN
G
M H
01 SHADOW JOINT SCHATTENFUGE
02 DOOR UNDERCUT FOR AIR
TRANSFER
TUERUNTERSCHNITT FUER
LUFTDURCHLASS
03 PENETRATION THROUGH FIRE
RATED WALL
WANDDURCHFUEHRUNG
04 LOUVRES WETTERSCHUTZGITTER
05 GRID IN THE WALL 1300x550 GITTER IN DER WAND 1300x550
D
DD
D
L
K
J
H
G
F
E
D
C
B
A
1 2 3 3.5 4 5 5.5 6 7 8 9
130B
BED (PET)
131B
BED (PET)
FAMILY SUITE 02
(PET)
265 m³/h
131A
BATH
EXTENDED STAY 01
(ABA)(PET)
170 m³/h
EXTENDED STAY 01
(PET)
170 m³/h
FAMILY SUITE 01
(PET)
265 m³/h
FAMILY SUITE 03
(PET)
265 m³/h 127B
BED (PET)
126B
BED (PET) 126
FAMILY SUITE 05
(PET)
265 m³/h
EXTENDED STAY 02
(ABA)(PET)
170 m³/h
FAMILY SUITE 04
(PET)
265 m³/h 133B
BED (PET)
134B
BED (PET)
FAMILY SUITE 06
(PET)
265 m³/h
CORRIDOR (PET)
127A
BATH
133A
BATH
126A
BATH
134A
BATH
129A
BATH
130A
BATH
ST-1
STAIR
EXTENDED STAY 03
(PET)
170 m³/h
FAMILY SUITE 08
(PET)
265 m³/h 136B
BED (PET)
EXTENDED STAY 02
(PET)
170 m³/h
GUEST LAUNDRY
135A
BATH
FAMILY SUITE 07
(PET)
265 m³/h 124B
BED (PET)
GENERAL STORAGE
85 m³/h
GENERAL STOR
85 m³/h
136A
BATH
125A
BATH
124A
BATH
MH302
MH302
MH302
200x200
200x200
40 m³/h
40 m³/h
350 m³/h 350 m³/h
40 m³/h
40 m³/h40 m³/h
40 m³/h 40 m³/h
40 m³/h
40 m³/h
40 m³/h
40 m³/h
40 m³/h
40 m³/h
40 m³/h
265 m³/h
265 m³/h
265 m³/h
265 m³/h 265 m³/h
265 m³/h 265 m³/h
265 m³/h
265 m³/h
170 m³/h170 m³/h 170 m³/h
170 m³/h
350 m³/h
40 m³/h
170 m³/h
160ø
UKK= 3125 OKRFB
160ø
UKK= 3125 OKRFB
200ø
UKK= 3105 OKRFB
200ø
UKK= 3105 OKRFB
600x300
UKK= 3200 OKRFB
300x250
300x250
UKK= 3100 OKRFB
160ø
UKK= 3126 OKRFB
160ø
UKK= 3145 OKRFB
160ø
1F-FD-02 1F-FD-02
250x250
250x250
200ø
UKK= 3105 OKRFB
160ø
UKK= 3125 OKRFB
160ø
UKK= 3145 OKRFB
200x200
160ø UKK= 3170 OKRFB200ø
UKK= 3125 OKRFB
160ø
UKK= 3125 OKRFB
1F-MD-02
1F-FD-03
1F-FD-03
1F-MD-021F-MD-02
1F-FD-03
1F-FD-03250x200
1F-FD-06
1F-FD-06
250x250
250x250 200x200
160ø
UKK= 2975 OKRFB
0ø
U
KK
O
KR
FB
1F-MD-02
1F-FD-03
600x300
600x300 550x250
40 m³/h 265 m³/h
305 m³/h
300ø
UKK= 3100 OKRFB
305 m³/h
160ø
UKK= 2761 OKRFB
160ø
UKK= 2761 OKRFB
250x200
0ø 160ø
160ø
0ø
600x300
UKK= 3014 OKRFB
0ø 16
0ø
160ø
UKK= 2761 OKRFB
250x250
UKK= 3080 OKRFB
0ø
160ø 160ø
160ø UKK= 2761 OKRFB 160ø
UKK= 2761 OKRFB
0ø
0ø 16
0ø
0ø
0ø
0ø
160ø
160ø
0ø
0ø
0x
U
KK
O
KR
FB
0x
U
KK
O
KR
FB
0ø10
0ø
0ø
0ø
160ø20 0ø
U
KK
O
KR
FB
160ø
160ø01
02 02
02 02
03 03
03 03 03
03 03
03 03
0 76
1600 1100 1140 2300 1260
2240 570570 1560 490590 640 1220
0ø
1150 1100 1450 1460 1090 1150 1270
650440 1130 1560
1870 1030 740 1080 1080
340490
1100 1830
290 2880 560
650490 940
1270 340
1450 1110 11401140 1110 1450
2400 2680
640 1220
340 1140 990 12101260 4101600 1100 1140
0 11
GRAPHIC SCALE
MASSSTABSBALKEN
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:1
M
EC
H
AN
IC
AL
V E
N
TI
LA
TI
O N
PA
R
TI
AL
P
LA
N
FI
R
ST
F
LO
O R
P
AR
T
O F
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH121
H
LK
L U
E
FT
U N
G P
LA
N
TE
IL
1.
O
B E
R G
E S
C H
O S
S T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
LUEFTUNG, PLANTEIL, 1.OBERGESCHOSS TEIL 1 VON 2
VENTILATION, PARTIAL PLAN, FIRST FLOOR PART 1 OF 21
01 SHADOW JOINT SCHATTENFUGE
02 DOOR UNDERCUT FOR AIR
TRANSFER
TUERUNTERSCHNITT FUER
LUFTDURCHLASS
03 PENETRATION THROUGH FIRE
RATED WALL
WANDDURCHFUEHRUNG
04 LOUVRES WETTERSCHUTZGITTER
05 GRID IN THE WALL 1300x550 GITTER IN DER WAND 1300x550
R
EF
ER
T
O D
R
AW
IN
G
M H
R
EF
ER
T
O D
R
AW
IN
G
M H
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 255 m3/h BEDROOM +/- 127 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
WOHNZIMMER +/- 255 m3/h SCHLAFZIMMER +/- 127 m3/h
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 426 m3/h BEDROOM +/- 209 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
D
DD
D L
K
J
H
G
F
E
D
C
B
A
9 10 10.5 11 12 12.5 13 14 15 16
115B
BED (PET)
FAMILY SUITE 14
(PET)
115A
BATH
FAMILY SUITE 12
(PET)
112B
BED (PET)
FAMILY SUITE 10
(PET)
265 m³/h
FAMILY SUITE 13
(PET)
265 m³/h 119B
BED (PET)
120B
BED (PET)
FAMILY SUITE 11
(PET)
265 m³/h
EXTENDED STAY 05
(PET)
EXTENDED STAY 06
(PET)
ST-2
STAIR
FAMILY SUITE 09
(PET)
111B
BED (PET)
GUEST LAUNDRY
HOUSEKEEPING
80 m³/h
GENERAL STOR
85 m³/h
GST STOR
EL-1
ELEV.
136A
BATH
111A
BATH
FAMILY SUITE 15
(PET)
116A
BATH
116B
BED (PET)
124A
BATH
EXTENDED STAY 04
(PET)
170 m³/h
113B
BED (PET)
120A
BATH
112A
BATH
119A
BATH
113A
BATH
MH302
40 m³/h
40 m³/h
265 m³/h
40 m³/h
160ø
UKK= 2975 OKRFB
600x300
550x250
40 m³/h
305 m³/h305 m³/h
550x250
1F-FD-041F-FD-04
300ø
UKK= 3100 OKRFB
300ø
UKK= 3100 OKRFB
550x250
UKK= 3125 OKRFB
550x250
UKK= 3125 OKRFB
200ø
UKK= 3105 OKRFB
160ø
UKK= 3125 OKRFB
200ø
UKK= 3105 OKRFB
160ø
UKK= 3125 OKRFB
40 m³/h
265 m³/h
265 m³/h
200ø
UKK= 3105 OKRFB
200ø
UKK= 3105 OKRFB
160ø
UKK= 3125 OKRFB
160ø
UKK= 3125 OKRFB
40 m³/h 40 m³/h
40 m³/h 40 m³/h 350 m³/h 350 m³/h
170 m³/h
265 m³/h
40 m³/h
350 m³/h
40 m³/h
265 m³/h
40 m³/h 40 m³/h
170 m³/h
265 m³/h
265 m³/h
600x300
UKK= 3200 OKRFB
600x300
UKK= 3000 OKRFB
300x250
300x250
250x250
UKK= 3100 UKRD
200x200 20 0ø
200ø
0ø
0ø
160ø
UKK= 3145 OKRFB
1F-FD-02 1F-FD-02
1F-FD-03
40 m³/h
305 m³/h 305 m³/h
160ø
1F-FD-03
0ø
0ø
0ø
0ø
250x250
0ø
250x250
0ø
0ø
160ø
300ø
125ø
40 m³/h 100ø
160ø
200ø 200ø
250x250
250x250
UKK= 3100 UKRD
160ø
UKK= 3145 OKRFB
160ø 160ø
0ø 16
0ø
0ø
550x700
550x700
200x200 250x200
250x200
200ø
0ø
160ø
0ø
160ø
160ø
170 m³/h
02 02 02
03 03
03 03 03 03
03 03
03 03
1210 1800 2080
230 1360
1150 1090 1460 1460 1090 1150
90 78
1300 590
590620 1530 600 610 1520 650 490590
1380 1150 1070 1620
160ø
UKK= 2761 OKRFB
1140 1080 1620270 1380870 490
1300 5901460 1100 1140
2490 2490
1140 1100 1460230 1360
1050 790 1100 1630340 18801830
GRAPHIC SCALE
MASSSTABSBALKEN
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:5
M
EC
H
AN
IC
AL
V E
N
TI
LA
TI
O N
PA
R
TI
AL
P
LA
N
FI
R
ST
F
LO
O R
P
AR
T
O F
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH122
H
LK
L U
E
FT
U N
G P
LA
N
TE
IL
1.
O
B E
R G
E S
C H
O S
S T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
LUEFTUNG, PLANTEIL, 1.OBERGESCHOSS TEIL 2 VON 2
VENTILATION, PARTIAL PLAN, FIRST FLOOR PART 2 OF 21
01 SHADOW JOINT SCHATTENFUGE
02 DOOR UNDERCUT FOR AIR
TRANSFER
TUERUNTERSCHNITT FUER
LUFTDURCHLASS
03 PENETRATION THROUGH FIRE
RATED WALL
WANDDURCHFUEHRUNG
04 LOUVRES WETTERSCHUTZGITTER
05 GRID IN THE WALL 1300x550 GITTER IN DER WAND 1300x550
R
EF
ER
T
O D
R
AW
IN
G
M H
R
EF
ER
T
O D
R
AW
IN
G
M H
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 255 m3/h BEDROOM +/- 127 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
WOHNZIMMER +/- 255 m3/h SCHLAFZIMMER +/- 127 m3/h
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 426 m3/h BEDROOM +/- 209 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
D
W W
D D
L
K
J
H
G
F
E
D
C
B
A
1 2 3 3.5 4 5 5.5 6 7 8 9
230B
BED
231B
BED
FAMILY SUITE 08
265 m³/h
231A
BATH
EXTENDED STAY 01
170 m³/h
EXTENDED STAY 03
170 m³/h
FAMILY SUITE 07
265 m³/h
FAMILY SUITE 10
265 m³/h 227B
BED
226B
BED
FAMILY SUITE 12
265 m³/h
EXTENDED STAY 02
170 m³/h
FAMILY SUITE 09
265 m³/h 233B
BED
234B
BED
FAMILY SUITE 11
265 m³/h
CORRIDOR
227A
BATH
233A
BATH
226A
BATH
234A
BATH
230A
BATH
ST-1
STAIR
EXTENDED STAY 04
170 m³/h
FAMILY SUITE 13
265 m³/h 236B
BED
FAMILY SUITE 15
265 m³/h
EXTENDED STAY 05
170 m³/h
GUEST LAUNDRY
235A
BATH
FAMILY SUITE 14
265 m³/h 224B
BED
CORRIDOR
GENERAL STORAGE
GENERAL STORAGE
236A
BATH
225A
BATH
224A
BATH
350 m³/h
40 m³/h
40 m³/h
265 m³/h
170 m³/h
265 m³/h
170 m³/h
170 m³/h
265 m³/h
350 m³/h
40 m³/h 40 m³/h
40 m³/h40 m³/h
265 m³/h
265 m³/h
265 m³/h
170 m³/h
40 m³/h
265 m³/h
170 m³/h
40 m³/h
265 m³/h
40 m³/h 265 m³/h
90 m³/h90 m³/h
90 m³/h90 m³/h
40 m³/h
40 m³/h40 m³/h
350 m³/h
200ø
UKK= 3105 OKRFB
160ø
UKK= 3124 OKRFB
250x250
300x250
UKK= 3080 OKRFB
250x250 250x250
250x200
200x200
200x200
300x250 450x250
2F-MD-02
2F-FD-03
2F-FD-03
2F-MD-02
2F-FD-03 2F-FD-03
2F-FD-06
2F-FD-062F-FD-03
2F-MD-02
2F-FD-022F-FD-02
2F-MD-05
2F-MD-05
250x250
250x250
2F -M
D -0
0ø
2F-FD-03
2F-FD-01
2F-FD-03
2F-FD-03
2F-FD-02
2F-FD-01
600x300600x300
600x300 600x300
200ø
UKK= 3100 OKRFB
200ø
UKK= 3120 OKRFB
200ø
160ø
160ø
0ø
0ø
160ø
0ø
0ø
0ø
160ø
350x200
UKK= 3105 OKRFB
600x300
UKK= 3011 OKRFB
600x300
UKK= 3200 OKRFB
0ø
160ø
0ø
0ø
0ø
160ø 160ø
200ø
160ø
160ø
0ø
160ø
UKK= 3124 OKRFB
160ø
UKK= 2760 OKRFB
200x200
0ø
160ø
160ø
0ø
0ø
0ø 16
0ø
160ø
0ø
0ø
700x300
UKK= 2955 OKRFB
700x300
UKK= 2955 OKRFB
600x300
160ø
0ø 10 0ø
0ø
0ø
160ø
305 m³/h
305 m³/h
300ø
02 02
01 01
02 02
01 01
03 03
03 03
03 03
03 03
03 03
00 15
1590 1110 1140 1260
590490 930 570560 1580 490590 640 1220
2550 2720
1150 1100 1450 1450 1100 1150 1270
650490
1560 570430 1950 1030 1810 1090
0 340 270 2560
760 1100 1840700 1680
1820 570650490
1270 3401460 1100 11401140 1100 1460640 1220
490 930 920 670
1260 4001590 1100 1140
GRAPHIC SCALE
MASSSTABSBALKEN
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
NOT FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
A R
R
AC
KS
, U
SA
G
R H
EI
N
LA
N
D -P
FA
LZ
, B
AU
M H
O
LD
ER
, G
ER
M
AN
Y
FY
P N
C
O N
ST
R
U C
T
AR
M Y
LO
D
G
IN
G F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
I.
M
EN
EN
D
EZ
M . D
EI
ER
LE
IN
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
.1
1.
3:
:4
M
EC
H A
N
IC
AL
V
E N
TI
LA
TI
O
N
PA
R
TI
AL
P
LA
N
SE
C
O N
D F
LO
O
R P
AR
T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
A . S
ET
H
I
MH131
H
LK
L U
E
FT
U N
G P
LA
N
TE
IL
2.
O
B E
R G
E S
C H
O S
S T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
LUEFTUNG, PLANTEIL, 2.OBERGESCHOSS TEIL 1 VON 2
VENTILATION, PARTIAL PLAN, SECOND FLOOR PART 1 OF 21
01 SHADOW JOINT SCHATTENFUGE
02 DOOR UNDERCUT FOR AIR
TRANSFER
TUERUNTERSCHNITT FUER
LUFTDURCHLASS
03 PENETRATION THROUGH FIRE
RATED WALL
WANDDURCHFUEHRUNG
04 LOUVRES WETTERSCHUTZGITTER
05 GRID IN THE WALL 1300x550 GITTER IN DER WAND 1300x550
R
EF
ER
T
O D
R
AW
IN
G
M H
R
EF
ER
T
O D
R
AW
IN
G
M H
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 255 m3/h BEDROOM +/- 127 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
WOHNZIMMER +/- 255 m3/h SCHLAFZIMMER +/- 127 m3/h
FAIMILY SUITE FAN COIL UNIT
AIRFLOW RECIRCULATION:
LIVING ROOM +/- 426 m3/h BEDROOM +/- 209 m3/h
FAN COIL UNIT FUER
FAMILIENZIMMER MIT
LUFTSTROMRUECKFUEHRUN
G:
W W
D D
L
K
J
H
G
F
E
D
C
B
A
9 10 10.5 11 12 12.5 13 14 15 16
215B
BED
FAMILY SUITE 21
265 m³/h
215A
BATH
FAMILY SUITE 18
265 m³/h
FAMILY SUITE 19
265 m³/h 213B
BED
212B
BED
FAMILY SUITE 17
265 m³/h
CORRIDOR
219B
BED
220B
BED220
FAMILY SUITE 16
265 m³/h
EXTENDED STAY 08
170 m³/h
EXTENDED STAY 07
170 m³/h
ST-2
STAIR
FAMILY SUITE 15
265 m³/h 211B
BED
GUEST LAUNDRY
HOUSEKEEPING
80 m³/h224B
BED
GENERAL STORAGE
GST STOR
EL-1
ELEV.
236A
BATH
211A
BATH
216B
BED
FAMILY SUITE 20
265 m³/h
216A
BATH
224A
BATH
EXTENDED STAY 06
170 m³/h
220A
BATH
212A
BATH
219A
BATH
213A
BATH
40 m³/h 265 m³/h
90 m³/h
90 m³/h
40 m³/h
2F-FD-01
600x300
600x300 550x250
300x250
UKK= 3100 UKRD
200x200
40 m³/h
265 m³/h
40 m³/h
265 m³/h
350 m³/h350 m³/h
40 m³/h40 m³/h
265 m³/h 265 m³/h
170 m³/h
40 m³/h40 m³/h
170 m³/h
265 m³/h
40 m³/h
350 m³/h
40 m³/h
265 m³/h
170 m³/h
0ø
160ø
UKK= 3125 OKRFB
160ø
UKK= 3125 OKRFB
550x250
550x250
UKK= 3125 OKRFB
550x250
UKK= 3125 UKRD
550x250
0ø
600x300 250x250 250x250
2F-MD-02
2F-FD-03
40 m³/h
2F-MD-02
2F-MD-02
2F-FD-03
250x250
300x250
UKK= 3100 UKRD
2F-MD-04
2F-FD-022F-FD-02
600x300
UKK= 3200 OKRFB
200x150
250x250
2F-FD-03
2F-FD-03
2F-FD-03
2F-FD-02
200x200200x200
2F-FD-02
2F-FD-042F-FD-04
0ø
0ø
0ø
160ø
160ø
0ø
0ø
160ø
160ø
200ø
0ø20
0ø
160ø
305 m³/h 305 m³/h
305 m³/h 305 m³/h
300ø 300ø
300ø
160ø
160ø
160ø
160ø
600x300
UKK= 3000 UKRD
550x800
550x800
0ø
0ø
0ø
0ø
0ø
0ø
160ø 160ø
0ø
0ø
160ø
0ø 200ø
160ø
200ø
UKK= 3075 OKRFB
160ø
UKK= 3145 UKRD
01 01
02 02
02 01
01 01
02 02 02
03 03
03 03
03 03
03 03
1210 1800 2080 2050
125ø
265 m³/h
290 1300
1150 1090 1460 1520 1090 1150
2450 2490
1300 590
590590 1560 570610 1520 580 610470
310 1340 1150 1090 1600
40 80
1140 1100 1600310 1340
870 570
1300 5901460 1100 11401140 1100 1460
290 1300
860 1160 1570280 1940
390 1980 980
GRAPHIC SCALE
MASSSTABSBALKEN
GENERAL SHEET NOTES
ALLGEMEINE PLANHINWEISE
KEY NOTES
HAUPTANMERKUNGEN
1:100
0 1 32 4 5 10
SCALE:
TR
UE
N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .