A.03.09.04 STRUCTURAL_DC-23-0008.pdf
PDF 32 MB Posted
- Solicitation number
- W912GB23R0025
- Issued by
-
Department of the Army European Command
About this file
This document provides details on a forthcoming federal contract solicitation for construction services. The U.S. Army Corps of Engineers Europe District will issue solicitation number W912GB23R0025 seeking a contractor to construct a 78-unit Army Lodge facility at the Baumholder Military Community in Germany. The project scope includes construction of lodging, reception, and support areas along with associated site work and utilities. The contract type will be firm-fixed-price, with a performance period of approximately 1100 calendar days. The estimated value of construction is between $40-70 million. The solicitation will be posted to SAM.gov and issued on an unrestricted full and open basis without set-asides due to the overseas location. The primary point of contact for questions is the listed Contract Specialist and Contracting Officer.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL STRUCTURAL NOTES ALLGEMEINE STATIK HINWEISE
DESIGN STANDARDS BEMESSUNGSGRUNDLAGE
SITE CHARACTERISTICS STANDORTEIGENSCHAFTEN
DESIGN LOADS
STATIKLASTEN
MATERIALS MATERIALEIGENSCHAFTEN
GEOTECHNICAL CHARACTERISTICS GEOTECHNISCHE EIGENSCHAFTEN
REFER TO STRUCTRAL CALCULATIONS.
1. IMPOSED LOADS (BUILDING)
CATEGORY OCCUPANCY Q(kN/m²) Q(kN/m) Q(KN) CODE
A2 RESIDENTIAL (HOTELS AND MULTIFAMILY 2,70 - DIN EN 1991-1-1/NA
DWELINGS) + PARTITON WALLS
H ORDINARY FLAT ROOF - MAINENTRANCE 1,00 1,00 DIN EN 1991-1-1/NA
T2 STAIRS AND EXITS 5,00 2,00 DIN EN 1991-1-1/NA
B2 CORRIDORS SERVING HOTEL AND MULTIFALMILY DWELLING 3,00 3,00 DIN EN 1991-1-1/NA
C3 LOBBIES AND GROUND FLOOR CORRIDORS 5,00 4,00 DIN EN 1991-1-1/NA
HANDRAILS AND GUARDS - 1,0 0,89 DIN EN 1991-1-1/NA
TYPE ELEMENT Q(kN/m²)
ARCHITECTURAL LAYER FLAT ROOF 0,50
TYPICAL FLOOR CORRIDORS 2,00
TYPICAL FLOOR ALL OTHERS 1,50
GROUND FLOOR 1,60
MECHANICAL EQUIPMENT AHU 5,50
TYPE ELEMENT Q(kN/m²)
MECHANICAL EQUIPMENT 10,00
TYPE ELEMENT Q(kN/m²)
ARCHITECTURAL LAYER ROOF 0,60
NACH STATIKANALYSIS.
1. NUTZLASTEN (GEBAEUDE)
KATEGORIE NUTZUNG Q(kN/m²) Q(kN/m) Q(kN) CODE
A2 WOHNGEBAEUDE ( HOTEL UND MEHRFAMILIENHAEUSER)
+ TRENNWAENDE 2,70 - DIN EN 1991-1-1/NA
H NORMALES FLACHDACH - WARTUNG 1,00 1,00 DIN EN 1991-1-1/NA
T2 TREPPEN UND AUSGAENGE 5,00 2,00 DIN EN 1991-1-1/NA
B2 HOTEL FLURE UND MEHRFAMILIENHAUESER 3,00 3,00 DIN EN 1991-1-1/NA
C3 LOBBYS UND ERDGESCHOSS FLURE 5,00 4,00 DIN EN 1991-1-1/NA
GELAENDER UND BRUESTUNGEN - 1,00 0,89 DIN EN 1991-1-1/NA
TYPE ELEMENT Q(kN/m²)
ARCHITEKONISCHE SCHICHT FLACHDACH 0,50
FLUR 2,00
FLUR 1,50
EG 1,60
MECHANISCHE GERAETE AHU 5,50
TYPE ELEMENT Q(kN/m²)
MECHANISCHE GERAETE 10,00
TYPE ELEMENT Q(kN/m²)
ARCHITEKTONISCHE SCHICHT DACH 0,60
2. EIGENLASTEN (GEBAUEDE)
3. EIGENLASTEN (PLATTFORM AUS STAHL)
4. EIGENLASTEN (UEBERDACHUNG)
2. DEAD LOADS (BUILDING))
3. DEAD LOADS (STEELPLATFORM)
4. DEAD LOADS (CANOPY)
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
G
E N
ER
AL
N O
TE
S
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-001
S
TA
TI
K
A
LL
G E
M E
IN
H
IN
W
E
IS
E
1 DIMENSIONS SHALL BE VERIFIED IN CONJUNCTION WITH THE EXISTING SITUATION, AND THE DESIGNER SHALL BE NOTIFIED IN CASE OF UNFORESEEN
DISCREPANCIES.
1 DIE ABMESSUNGEN SIND IM ZUSAMMENHANG MIT DER BESTEHENDEN SITUATION ZU UEBERPRUEFEN UND BEI UNVORHERGESEHEN ABWEICHUNGEN DEM DESIGNER
MITZUTEILEN.
2 THIS DRAWING SHALL BE USED FOR CONSTRUCTION ONLY AFTER BEING APPROVED BY AN APPROVAL ENGINEER. THE RESPECTIVE COMPANY IS RESPONSIBLE
FOR EXECUTION ACCORDING TO THE UNCHECKED PLAN.
2 DIESER PLAN GILT ERST NACH DER FREIGABE EINES PRUEFINGENIEURS. FUER AUSFUEHRUNGEN NACH DEM UNGEPRUEFTEN PLAN IST DIE JEWEILIGE FIRMA
VERANTWORTLICH.
3 ON THE ENTIRE EXECUTION PERIOD, ALL PERMANENT AND TEMPORARY WORKS, INCLUDING WORKS INVOLVING EXCAVATIONS AND SOIL SUPPORT, SHALL BE CARRIED OUT ACCORDING TO RELATING HEALTH AND SAFETY AND FIRE PREVENTION LEGISLATIVE NORMS AND REGULATIONS.
3 WAEHREND DER GESAMTEN AUSFUEHRUNGSDAUER DER GEBAEUDE SIND ALLE PERMANENTEN UND TEMPORAEREN ARBEITEN, EINSCHLIESSLICH DER ARBEITEN IM ZUSAMMENHANG MIT AUSGRABUNGEN UND BODENBEFESTIGUNGEN, NACH DEN GESUNDHEIT UND SICHERHEIT SOWIE FUER DEN BRANDSHUTZ NORMEN
DURCHZUFUEHREN.
4 ALL LEGAL REQUIREMENTS AND PROCEDURES REGARDING EXISTING CONSTRUCTIONS PROTECTION IN THE PROXIMITY OF THE SITE SHALL BE RESPECTED. 4 ALLE GESETZLICHEN ANFORDERUNGEN UND VERFAHREN BEZUEGLICH DES BESTEHENDEN BAUTENSCHUTZES IN DER NAEHE DES STANDORTS SIND ZU BEACHTEN.
5 UNLESS NOTED OTHERWISE ALL DIMENSIONS IN PLAN AND CROSS-SECTIONS ARE IN METERS AND CENTIMETERS AND LEVELS IN METERS. DRAWINGS WILL NOT
BE SCALED.
5 SOFERN NICHTS ANDERS ANGEGEBEN, SIND ALLE ABMESSUNGEN IN PLAN UND QUIERSCHINITTEN IN METER UND ZENTIMETER UND EBENEN IN METER. ZEICHNUNGEN
WERDEN NICHT SKALIERT.
6 THE FOLLOWING OPENINGS ARE RELEVANT TO THE STRUCTURAL SYSTEM AND HAVE TO BE PRESENTED COMPREHENSIVELY BY THE END OF THE DESIGN
PLANNING PROCESS.
• OPENINGS WITH AN EDGE OF 40 CM OR LARGER.
• ALL SLAB OPENING CLOSE TO COLUMNS, WALL ENDS AND WALL CORNERS, WITH A DISTANCE SMALLER THAN 6X SLAB THICKNESS.
• OPENINGS IN BEAMS WITH A DIAMETER BIGGER THAN THE 1/4 OF THE HEIGHT OF THE WEB.
6 FOLGENDE DURCHBRUECHE SIND STATISCH RELEVANT UND VOLLSTAENDIG ZUM ABSCHLUSS DER ENTWURFSPLANUNG ANZUGEBEN.
• DURCHBRUECHE MIT EINER KANTENLAENGE VON 40 CM UND GROESSER.
• ALLE DECKENDURCHBRUECHE AN STUETZEN,WANDENDEN UND WANDECKEN IM ABSTAND KLEINER 6X DECKENDICKE.
• DURCHBRUECHE IN UNTER-UND UEBERZUENGEN MIT DURCHMESSER GROESSER ALS 1/4 DER STEGHOEHE.
7 IN CASES OF CONFLICT BETWEEN STRUCTURAL DRAWINGS AND OTHER DISCIPLINES, CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONALS AND OBTAIN
CLARIFICATION BEFORE PROCEEDING WITH WORK.
7 BEI KONFLIKTEN ZWISCHEN DEN STATISCHEN ZEICHNUNGEN UND ANDEREN DISZIPLINEN MUSS DER BAUUNTERNEHMER DIE PLANUNGSFACHLEUTE BENACHRICHTIGEN UND EINE KLAERUNG HERBEIFUEHREN, BEVOR ER MIT DEN ARBEITEN FORTFAEHRT.
8 OPENINGS SHOWN IDENTIFY THE VOIDS IN THE STRUCTURAL ELEMENTS. RECONCILE THEIR EXACT SIZE AND LOCATION WITH ARCHITECTURAL BEFORE
PROCEEDING WITH WORK.
8 DIE DARGESTELLTEN OEFFNUNGEN KENNTEICHNEN DI HOLRAEUME IN DEN STRUKTURELEMENTEN. STIMMEN SIE IHRE GENAUE GROESSE UND LAGE MIT DEN
ARCHITEKTONISCHEN BEVOR SIE MIT DEN ARBEITEN FORTFAHREN.
9 THE CENTRE LINES OF THE STRUCTURAL ELEMENTS COINCIDE WITH THE INTERSECTIONS OF THE GRID LINES, UNLESS OTHERWISE SPECIFIED. 9 DIE MITTELLINIEN DER STRUKTURELEMENTE MIT DEN SCHNITTPUNKTEN DER GITTERLINIEN UEBEREINSTIMMEN, SOFERN NICHTS ANDERES ANGEGEBEN IST.
10 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE STRUCTURAL SUPPORT OF CONSTRUCTION LOADS (SHORING) DURING ALL PHASES OF
CONSTRUCTION.
10 DER AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, WAEHREND ALLER BAUPHASEN FUER EINE ANGEMESSENE STATISCHE UNTERSTUETZUNG DER BAULASTEN
(ABSTUETZUNG) ZU SORGEN.
11 THE CONTRACTOR IS SOLELY RESPONSIBLE TO MEASURE AND QUANTIFY ALL PROJECT REQUIREMENTS. 11 DER AUFTRAGNEHMER IST ALLEIN FUER DIE MESSUNG UND QUANTIFIZIERUNG ALLER PROJEKTANFORDERUNGEN VERANTWORTLICH.
1 DESIGN IS BASED ON THE LASTEST EDITION OF THE FOLLOWING EUROPEAN CODES, TOGETHER WITH THEIR CORRESPONDING NATIONAL ANNEX:
• DIN EN 1990 & NA: BASIS OF STRUCTURAL DESIGN;
• DIN EN 1991 & NA: ACTIONS ON STRUCTURES;
• DIN EN 1992 & NA: DESIGN OF CONCRETE STRUCTURES;
• DIN EN 1993 & NA: DESIGN OF STEEL STRUCTURES;
• DIN EN 1997 & NA: GEOTECHNICAL DESIGN;
1 BEI DEM STATIK DESIGN SIND ALLE GUELTIGEN UND NEUESTEN AUSGABEN DER EUROCODE EINZUHALTEN; ZUSAMMEN MIT DEM ENTSPRECHENDEN NATIONALEN
ANHANG:
• DIN EN 1990 & NA: GRUNDLAGEN DER TRAGWERKSPLANUNG;
• DIN EN 1991 & NA: EINWIRKUNGEN AUF TRAGWERKE;
• DIN EN 1992 & NA: BEMESSUNG UND KONSTRUKTION VON STAHLBETON-UND SPANNBETONTRAGWERKEN;
• DIN EN 1993 & NA: BEMESSUNG UND KONSTRUKTION VON STAHLBAUTEN;
• DIN EN 1997 & NA ENTWURF, BERECHNUNG UND BEMESSUNG IN DER GEOTECHNIK;
2 UFC 3-301-01 STRUCTURAL ENGINEERING 2 UFC 3-301-01 STRUCTURAL ENGINEERING
3 ANTITERRORISM DESIGN:
• UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (AUGUST 2020)
• HQ USEUCOM AT OPORD 20-12
3 ANTITERRORISM DESIGN:
• UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (AUGUST 2020)
• HQ USEUCOM AT OPORD 20-12
4 THIS PROJECT WAS DETERMINED TO TRIGGER ANTITERRORISM/ FORCE PROECTION (ATFP) REQUIREMENTS. ALL ATFP, INCLUDING PROGRESSIVE COLLAPSE
RESISTENCE MEASURES HAVE BEEN INCORPORATED INTO THE DESIGN.
4 BEI DIESEM PROJEKT WURDE FESTGESTELLT, DASS ES ANFORDERUNGEN ZUR ANTITERRORISM/ FORCE PROECTION (ATFP) ERFUELLT. ALLE ATFP-ANFORDERUNGEN, EINSCHLIESSLICH DER MASSNAHMEN ZUM PROGRESSIVE COLLAPSE RESISTENCE, WURDEN IN DEN ENTWURF AUFGENOMMEN.
1 THE BUILDING IS LOCATED IN BAUMHOLDER, GERMANY.
• SNOW (ACCORDING TO DIN EN 1991-1-3) sk = 1.65 kN/m²,
• WIND (ACCORDING TO DIN EN 1991-1-4) qb = 0.32 kN/m²,
• SEISMIC (ACORDING TO DIN EN 1998-1) agR = 0,164m/s² SEISMIC HAZARD NOT APPLICABLE WHEN THE PEAK GROUND ACCELERATION IS SMALLER THAN 0,40m/s²
• FIRE RESISTANCE CLASS 4.
1 DAS GEBAEUDE BEFINDET SICH IN BAUMHOLDER, DEUTSCHLAND.
• SCHNEE (NACH DIN EN 1991-1-3) sk = 1.65 kN/m²,
• WIND (NACH DIN EN 1991-1-4) qb = 0.32 kN/m²,
• ERDBEBEN (NACH DIN EN 1998-1) agR = 0,164m/s² ERDBENEN NACHWEIS NICHT ERFORDERLICH WENN DIE REFERENZSPITZENWERTE DER BODENBESCHLEUNIGUNG KLEINER ALS 0,40m/s² SIND.
• FEUERWIDERSTANDSKLASSE 4.
1 BLINDING CONCRETE C16/20 1 ESTRICHBETON C16/20
2 STRUCTURAL CONCRETE
• STRIP FOUNDATIONS, FOUNDATION SLABS C30/37
• SUPERSTRUCTURES ELEMENTS C30/37
2 BETON
• STREIFENFUNDAMENT, BODENPLATTE C30/37
• OBERBAUELEMENTE C30/37
3 REINFORCEMENT B500 (A,B) 3 BEWEHRUNGSTAHL B500 (A,B)
4 STRUCTURAL STEEL S235; S355 4 TRAGWERK STAHL S235; S355
5 ALL CONCRETE CONSTRUCTION JOINTS WILL BE PROPERLY PREPARED BEFORE CONCRETE POURING; 5 ALLE BETONARBEITSFUGEN WERDEN VOR DEM BETONIEREN ORDNUNGSGEMAESS VORBEREITET;
6 DEVIATIONS FROM MATERIAL TYPE OR QUALITY CLASS ARE NOT PERMITTED WITHOUT DESIGNER WRITTEN APPROVAL; 6 ABWEICHUNGEN VON DER MATERIALART ODER QUALITAETSKLASSE SIND OHNE SCHRIFTLICHE GENEHMIGUNG DES PRUEFINGENIEUR NICHT ZULAESSIG 7 ALL WELDS WILL BE FACTORY EXECUTED, IN CONTROLLED ENVIRONMENT, USING AN APPROVED TECHNOLOGY; 7 ALLE SCHWEISSNAEHTE WERDEN WERKSEITIG AUSGEFUEHRT, IN KONTROLLIERTER UMGEBUNG, UNTER VERWENDUNG EINER ZUGELASSENEN TECHNOLOGIE;
8 WELDING ON SITE IS NOT PERMITTED WITHOUT THE WRITTEN APPROVAL OF THE DESIGNER. 8 SCHWEISSEN VOR ORT IST OHNE DIE SCHRIFTLICHE ZUSTIMMUNG DES PRUEFINGENIEURS SIND NICHT ZULAESSIG.
1 IF, DURING THE EXECUTION OF THE INFRASTRUCTURE WORKS, THE GEOTECHNICAL CONDITIONS FOUND ON SITE WILL BE DIFFERENT FROM THE ONES CONSIDERED THROUGHOUT THE PROJECT, EXECUTION WILL STOP AND THE GEOTECHNICAL ENGINEER AND THE DESIGNER WILL BE CONTACTED TO ANALYZE
AND FIND A SOLUTION ADJUSTED TO THE REAL CONDITIONS.
1 WENN DIE VOR ORT FESTGESTELLTEN GEOTECHNISCHEN BEDINGUNGEN VON DENEN DES GESAMTEN PROJEKTS UNTERSCHIEDEN WIRD, WIRD DIE ARBEIT UNTERBROCHEN UND DER GEOTECHNIKER UND DER PRUEFINGENIEUR WERDEN KONTAKTIERT,UM EINE ANGEPASSTE LOESUNG AN DIE REALEN BEDINGUNGEN ZU
ANALYSIEREN UND ZU FINDEN.
2 THE FREEZING DEPTH CONSIDERED IS 80 cm. 2 DIE BETRACHTETE GEFRIERTIEFE BETRAEGT 80 cm.
3 SOIL PARAMETERS:
- MOIST UNIT WEIGHT γk=19-21 kN/m³
- SATURATED UNIT WEIGHT γk=21-23 kN/m³
3 BODENKENNWERTE:
- ERDFEUCHTE WICHTE γk=19-21 kN/m³
- WASSERGESAETTIGTE WICHTE γk=21-23 kN/m³
4 •ACCORDING TO THE GEOTECHNICAL REPORT FROM OCTOBER 18, 2021 DEVELOPED BY AECOM, IN ORDER TO KEEP SEDIMENTS AND SEDIMENTATION DIFFERENCES WITHIN A TOLERABLE RANGE, A SOIL EXCHANGE PAD UNDER FOUNDATION SYSTEM OF AT LEAST 2.5m IS RECOMMENDED (ELEVATION DEPTH -3.67m).
A MIXED-GRAIN, STANDARDIZED, FROST-PROOF MATERIAL (E.G. FROST PROTECTION MATERIAL 0/45 MM) SHOULD BE SELECTED AS THE SOIL REPLACEMENT
CUSHION.
•THE SOIL HORIZON BELOW THE BALLAST PAD SHOULD HAVE, AT A MINIMUM, A STIFF CONSISTENCY OR MEDIUM-DENSITY BEDDING. IF DURING CONSTRUCTION, THE SOIL HORIZON IS FOUND TO HAVE A SOFT CONSISTENCY, THE BALLAST CUSHION SHOULD BE BROUGHT DOWN TO DEPTHS WHERE AT LEAST A STIFF CONSISTENCY
IS ACHIEVED.
•A PRESSURE SPREAD ANGLE OF 45° MUST BE CONSIDERED WHEN INSTALLING THE SOIL REPLACEMENT MATERIAL UNDER THE FOUNDATION SYSTEM. THE LOAD-BEARING CAPACITY AND COMPACTION MUST BE VERIFIED BY MEANS OF STATIC PLATE PRESSURE TESTS. THE SOIL REPLACEMENT MUST BE INSTALLED AND
COMPACTED IN LAYERS.
•WHEN PERFORMING STATIC LOAD PLATE TESTS, THE FOLLOWING LOAD-BEARING CAPACITY AND COMPACTION REQUIREMENTS MUST BE ACHIEVED ON THE
SURFACE OF THE SOIL REPLACEMENT:
DEFORMATION MODUL Ev2 ≥ 100 MN/m², Ev2/Ev1 < 2,3 WHEN PERFORMING DYNAMIC LOAD PLATE TESTS, THE FOLLOWING LOAD-BEARING CAPACITY AND COMPACTION REQUIREMENTS MUST BE ACHIEVED:
DEFORMATION MODUL Evd ≥ 50 MN/m² •AECOM RECOMMENDS CARRYING OUT AT LEAST ONE STATIC TEST AS A REFERNCE FOR ANY FURTHER DYNAMIC TESTS, AS EXPERIENCE HAS SHOWN THAT
DYNAMIC TESTS HAVE ONLY LIMITED INFORMATIVE VALUE ABOUT THE COMPACTION SUCCESS.
4 •GEMAESS DEM VON AECOM ERSTELLTEN GEOTECHNISCHEN REPORT VOM 18. OKTOBER 2021 WIRD EIN BODENAUSTAUSCHPOLSTER VON MINDESTENS 2,5m EMPFOHLEN, UM SETZUNGEN UND SETZUNGSUNTERSCHIEDE IN EINER VERTRAEGLICHEN GROESSENORDNUNG ZU HALTEN (HOEHE TIEFE -3.67m). ALS BODENAUSTAUSCHPOLSTER SOLLTE EIN GEMISCHTKOERNIGES, GENORMTES, FROSTSICHEREN MATERIAL (Z.B. FROSTSCHUTZMATERIAL 0/45 MM) GEWAEHLT WERDEN.
•DER BODENHORIZONTSOLLTE UNTERHALB DES SCHOTTERPOLSTERS EINE MINDESTENS STEIFE KONSISTENZ BZW. MITTELDICHTE LAGERUNG AUFWEISEN. WERDEN WAEHREND DER BAUAUSFUEHRUNG BEREICHE UNTERHALB DES SCHOTTERPOLSTERS GEFUNDEN, DIE EINE WEICHPLASTISCHE KONSISTENZ BZW. LOCKERE LAGERUNG AUFWEISEN, IST DAS SCHOTTERPOLSTER BIS IN TIEFEN ZU FUEHREN IN DEM MINDESTENS EINE STEIFE KONSISTENZ BZW. MITTELDICHTE LAGERUNG
VORHERRSCHT.
•ES IST EIN DRUCKAUSBREITUNGSWINKEL VON 45° BEIM EINBAU DES BODENAUSTAUSCHMATERIALS ZU BERUECKSICHTIGEN. DIE TRAGFAEHIGKEIT UND VERDICHTUNG IST MITTELS STATISCHEN PLATTENDRUCKVERSUCHE NACHZUWEISEN. DIE BODENAUSTAUSCHSCHICHT IST JEWEILS LAGENWEISE EINZUBAUEN UND ZU VERDICHTEN.
•AUF DER OBERFLAECHE DES BODENAUSTAUSCHES SIND BEI AUSFUEHRUNG STATISCHER LASTPLATTENVERSUCHE DIE FOLGENDEN TRAGFAEHIGKEITS- UND
VERDICHTUNGSANFORDERUNGEN EINZUHALTEN:
VERFORMUNGSMODUL VON Ev2 ≥ 100 MN/m², Ev2/Ev1<2,3 •BEI DER AUSFUEHRUNG DYNAMISCHER LASTPLATTENVERSUCHE SIND DIE FOLGENDEN TRAGFAEHIGKEITS- UND VERDICHTUNGSANFORDERUNGEN EINZUHALTEN:
VERFORMUNGSMODUL VON Evd ≥ 50 MN/m² •AECOM EMPFIEHLT MINDESTENS EINEN STATISCHEN VERSUCH ALS REFERENZ FUER EVENTUELL WEITERE DYNAMISCHE VERSUCHE DURCHZUFUEHREN, DA DYNAMISCHE VERSUCHE ERFAHRUNGSGEMAESS NUR BEGRENZTE AUSSAGEKRAFT UEBER DEN VERDICHTUNGSERFOLG HABEN.
5 FOR CONSTRUCTION OF EXCAVATION PITS, A SLOPE ANGLE OF MAXIMUM 45° IS TO BE MAINTAINED. 5 BEI DER ERRICHTUNG VON BAUGRUBEN, IST EIN BOESCHUNGSWINKEL VON MAXIMAL 45° EINZUHALTEN.
WOOD
HOLZ
CAST-IN-PLACE REINFORCED CONCRETE
BEWEHRTER ORTBETON
PRECAST CONCRETE
FERTIGBETON
PLAIN CONCRETE
UMBEWERTER ORTBETON
DOUBLE WALL
DOPPELWAND
FILIGREE SLAB
ELEMENTDECKE
EARTH
ERDE
GRAVEL
KIES
MASONRY
MAUERWERK
STEEL
STAHL
SOFT INSULATION
DAEMMSTOFFE
LEGENDS /
LEGENDE
RIGID INSULATION
DICHTSTOFFE
GROUT
MOERTEL
CONSTRUCTION JOINT
ARBEITSFUGE
SPAN OF STRUCTURAL ELEMENTS
SPANNRICHTUNG DER TRAGWERKSELEMENTE
POSITION OF STRUCTURAL ELEMENT
POSITIONS DES TRAGWERKSELEMENTES
N
NORTH ARROW
NORDPFEIL
PLAN SPOT ELEVATION
HOEHENKOTE IM GRUNDRISS
SECTION SPOT ELEVATION
HOEHENKOTE IM SCHNITT
SYMBOLS /
SYMBOLE
BREAK LINE
BRUCHKANTE
X KEY NOTES
HAUPTANMERKUNGEN
XXYY
POSITION NUMBER
POSITIONSNUMMER
POSITION CODE
POSITIONS CODE
MATCH LINE
PLAN SCHNITTLINE
M
AT
C H
L
IN
E
X / X
-X
XX
REFERENCED SHEET
REFERENZBLATT
X
XXX
CALL OUT
DETAILAUSSCHNITT
CONSTRUCTION JOINT
ARBEITSFUGE
PARAPET HEIGHT (FROM TOC)
BRUESSTUNGSHOEHE (AB OKRF)
PH: X,XX m
RADON CERTIFIED VAPOR LAYER
RADON UND DAMPFSPERRE
RECTANGULAR PENETRATION - SECTION
RECHTECKIGE DURCHBRUCH- SCHNITT
PARTIAL RECTANGULAR WALL PENETRATION
RECHTECKIGE TEILWANDAUSSPARUNG
RECTANGULAR PENETRATION - PROJECTION
RECHTECKIGE DURCHBRUCH - PROJEKTION
CIRCULAR PENETRATION
RUNDE DURCHBRUCH
PENETRATION TAG
DURCHBRUCH TAGYY - XXX
FLOOR
STOCK
00 : GROUND FLOOR
EG
01 : 1ST FLOOR
1. OG
02 : 2ND FLOOR
2. OG
03 : 3RD FLOOR
3. OG
04 : ROOF
DACHGESCHOSS
STRUCTURAL OPENING
STRUKTURELLE OEFFNUNG
PERFORATED PIPES FOR RADON
PERFORIERTE ROHRE FUER RADON
REINFORCEMENT STEEL AREA
QUERSCHNITTE VON
FLAECHENBEWEHRUNG
As,xxx top TOP
OBEN
bot BOTTOM
UNTEN
ver VERTICAL
VERTIKALE
hor HORIZONTAL
HORIZONTALE
trans TRANSVERSAL
TRANSVERSALE
XX Ø-- / -- REBAR SHAPE TAG
BIEGEFORMEN TAG
SPACING IN CM
ABSTAND IN CM
BAR DIAMETER IN MM
STABDURCHMESSER IN MM
BAR MARK NUMBER
STABPOSITION NUMMER
EW EXTERIOR WALL
AUSSENWAND
IW INTERIOR WALL
INNENWAND
FN FOUNDATION
FUNDAMENT
SL SLAB
DECKE
CL COLUMN
STUETZE
ST STAIR
TREPPE
BM BEAM
BALKEN
RW RETAINING WALL
STUETZMAUER
RF ROOF
DACH
SC STEEL COLUMN
STAHLSTUETZE
SB STEEL BEAM
STAHLBALKEN
long LONGITUDINAL
LONGITUDINAL
ABBREVIATIONS /
ABKUERZUNGEN
ENGLISH
ENGLISCH
EL ANSICHT
FL FLOOR
GESCHOSS
ELEVATION
RC STAHLBETON
TOC TOP OF THE CONCRETE
OBERKANTE BETON
REINFORCED CONCRETE
GERMAN
DEUTSCH
DG ROOF FLOOR
EG ERDGESCHOSS
GROUND FLOOR
DACHGESCHOSS
OG UPPER FLOOR
OKRF OBERKANTE ROHFUSSBODEN
TOP FACE OF SLAB
OBERGESCHOSS
BOC UNTERKANTE BETON
BOTTOM OF THE CONCRETE
BOF UNTERKANTE FUNDAMENT
BOTTOM OF THE FOUNDATION
TOF TOP OF THE FOUNDATION
OBERKANTE FUNDAMENT
GND ERDBODEN
GROUND
STB STAHLBETON
REINFORCED CONCRETE
PH PARAPET HEIGHT
BRUESSTUNGSHOEHE
ATFP ANTITERRORISMUS UND KRAFTSCHUTZ
ANTITERRORISM AND FORCE PROTECTION
PRC PRECAST
FERTIGTEIL
FT FERTIGTEIL
PRECAST
beff MITWIRKENDE PLATTENBREITE
EFFECTIVE FLANGE WIDTH
PE VAPOR BARRIER (POLYETHYLENE FOIL, 2 LAYERS)
DAMPFBREMSE (PE-FOLIE; ZWEILAGIG)
mm MILLIMETER
MILLIMETERS
WU WASSERUNDURCHLAESSIGEN
WATERTIGHT CONCRETE
OVERLAP. UEBERGREIFUNGSLAENGE
OVERLAP LENGTH
D TIEFE
DEPTH
H HOEHE
HEIGHT
W WIDTH
BREITE
cm ZENTIMETER
CENTIMETERS
GROUND SLAB FOUNDATION
SLAB ABOVE GROUND FLOOR
SLAB ABOVE 1ST FLOOR
SLAB ABOVE X FLOOR
ROOF FLOOR
BODENPLATTE
DECKE UEBER EG
DECKE UEBER 1.OG
DECKE UEBER X.OG
DG
GROUND FLOOR
EG
1ST FLOOR
1.OG
X FLOOR
X.OG
ROOF FLOOR
DG
STRUCTURAL FLOOR PLAN ORIENTATION /
TRAGWERKSPLAN ORIENTIERUNG
STRIP FOUNDATION
STREIFENFUNDAMENT
PHX FLOOR
X.OG
ROOF FLOOR
DG PH
PARAPET HEIGHT /
BRUESSTUNGSHOEHE
ELEVATION
ANSICHT
SECTION
SCHNITT
TOC
OKRF
TOC
OKRF
TOC
OKRF
TOC
OKRF
ROOF PARAPET
ATTIKA
ROOF PARAPET
ATTIKA
PENETRATIONS IN STRUCTURAL ELEMENTS /
DURCHBRUECHE IN TRAGENDEN ELEMENTEN
RECTANGULAR SLAB PENETRATION
RECTANGULAR WALL PENETRATION
CIRCULAR WALL PENETRATION
RECHTECKIGE WANDDURCHBRUCH
RUNDE WANDDURCHBRUCH
RECHTECKIGE DECKEDURCHBRUCH
EL
EV
AT
IO
N
HO
EH
E
EL
EV
AT
IO
N
HO
EH
E
TOC
OKRF
CIRCULAR SLAB PENETRATION
RUNDE DECKEDURCHBRUCH
W
H
D
H
W
D
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
G
EN
ER
AL
LE
G
EN
D S
AN
D
A
BB
R
EV
IA
TI
O N
S
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-002
S
TA
TI
K
A
LL
G E
M E
IN
LE
G E
N D
E U
N D
A B
K U
E R
ZU
N
G E
N
LAYING DISTANCE FOR LINEAR SUPPORTS: s IS AXIAL DIMENSION LAYING DISTANCE FOR POINT SUPPORTS: s APPLIES TO BOTH DIRECTIONS
VERLEGEABSTAND BEI LINIENFOERMIGEN UNTERSTUETZUNGEN: s IST
ACHSMASS
VERLEGEABSTAND BEI PUNKTFOERMIGEN UNTERSTUETZUNGEN: s GILT
FUER BEIDE RICHTUNGEN
CONCRETE REBAR BENDING
BIEGEN VON BETONSTAEHLEN
WHEN DETERMINING THE BENDING ROLL DIAMETER D, DIN 1045-2 MUST BE OBSERVED AND A DISTINCTION MADE ACCORDING TO THE STRUCTURAL
FUNCTION OF THE BEND.
BEI DER BESTIMMUNG DES BIEGEROLLENDURCHMESSERS D IST DIN 1045-2 ZU BEACHTEN UND NACH DER BAUTECHNISCHEN FUNKTION DER BIEGUNG
ZU UNTERSCHEIDEN.
A) BENDING WITH APPLIED FORCE B) CONSTRUCTIVE BENDING
BIEGUNG ZUR KRAFTUMLEITUNG KONSTRUKTIVE BIEGUNG
THE MINIMUM VALUES OF BENDING ROLL DIAMETERS LISTED UNDER A) AND B)
APPLY ONLY WHEN a ≥ 4Ø (a= DISTANCE OF WELDING FROM THE BEGINNING OF CRUMBLING).
DIE UNTER A) UND B) AUFGEFUEHRTEN MINDESTWERTE DER
BIEGEROLLENDURCHMESSER GELTEN NUR, WENN a ≥ 4Ø (a= ABSTAND DER SCHWEISSUNG VOM KRUEMMUNGSBEGINN).
SUPPORTS
UNTERSTUETZUNGEN
SPACERS AND SUPPORTS MUST LIE ON TOP OF EACH OTHER.
ABSTANDHALTER UND UNTERSTUETZUNGEN MUESSEN UEBEREINANDER LIEGEN.
SECURING THE POSITION OF THE UPPER REINFORCEMENT ACCORDING TO THE DBV-DATA SHEET "UNTERSTUETZUNGEN"
BIEGUNG NACH A) BIEGUNG NACH B)
FOR PRODUCTION AND INSPECTION, THE REQUIRED BENDING ROLL DIAMETER
MUST ALWAYS BE INDICATED ON THE BENDING FORM IN THE REINFORCEMENT
PLAN AND ON THE BAR LIST
IF A BENDING ROLL DIAMETER IS NOT SPECIFIED FOR THE BENDING FORM EITHER
IN THE REINFORCEMENT PLAN OR ON THE BAR LIST, THE ERF. D IS TO BE TAKEN
FROM THE ABOVE TABLE.
ZUR HERSTELLUNG UND UEBERPRUEFUNG IST DER ERFORDERLICHE
BIEGEROLLENDURCHMESSER IMMER ANZUGEBEN UND ZWAR AN DER
BIEGEFORM IM BEWEHRUNGSPLAN UND AUF DER STABLISTE
WIRD AN DER BIEGEFORM WEDER IM BEWEHRUNGSPLAN NOCH AUF DER
STABLISTE EIN BIEGEROLLENDURCHMESSER ANGEGEBEN, SO IST DER ERF. D
IN ABHAENGIGKEIT VON DER OBIGEN TABELLE ZU ENTNEHMEN.
FOR REINFORCING STEEL MESH AND WELDED REINFORCEMENT BENT AFTER
WELDING, DIN EN 1992-1-1 MUST ALSO BE OBSERVED. EXECUTION OF LOCKS
ON SUPPORTS:BEI BETONSTAHLMATTEN UND GESCHWEISSTER BEWEHRUNG, DIE NACH DEM
SCHWESSEN GEBOGEN WERDEN, IST ZUSAETZLICH DIN EN 1992-1-1 ZU
BEACHTEN.
AUSFUEHRUNG VON
BUEGELSCHLOESSER
N BEI STUETZEN:
MINIMUM VALUES OF THE CONCRETE
COVER PERPENDICULAR TO THE
CURVATURE PLANE
BENDING ROLL DIAMETER D
IN MM BAR DIAMETER Ø IN MM
BENDING ROLL DIAMETER D
IN MM
MINDESTWERTE DER BETONDECKUNG
RECHTWINKLING ZUR RUEMMUNGSEBENE
BIEGEROLLENDURCHMESSER D
IN MM
STABDURCHMESSER Ø IN MM BIEGEROLLENDURCHMESSER D
IN MM
> 100 MM AND/UND > 7 ØS MIN D = 10 ØS
6, 8, 10, 12 4 ØS MIN D = 40 MM
> 50 MM AND/UND > 3ØS MIN D = 15 ØS
14, 16 4 ØS MIN D = 64 MM
≤ 50 MM AND/UND < 3ØS MIN D = 20 ØS
20, 25, 28 7 ØS MIN D = 175 MM
BENDING AFTER A) BENDING AFTER B)
LAGESICHERUNG DER OBEREN BEWEHRUNG NACH DEM DBV-MERKBLATT "UNTERSTUETZUNGEN"
FOR COMPONENT THICKNESSES UP TO APPROX. 50 CM, THE DBV-DATA SHEET SPECIFIES THE REQUIREMENTS FOR THE SUPPORTS AND REGULATES THEIR
APPLICATION.
BEI BAUTEILDICKEN BIS CA. 50 CM LEGT DAS DBV-MERKBLATT DIE ANFORDERUNGEN AN DIE UNTERSTUETZUNGEN FEST UND REGELT DEREN ANWENDUNG.
FOR SUPPORTS, CERTIFIED ACCORDING TO DBV-DATA SHEET, THE FOLLOWING LOADS FRD ARE PERMISSIBLE:
FUER UNTERSTUETZUNGEN, ZERTIFIZIERT GEMAESS DBV-MERKBLATT, SIND FOLGENDE LASTEN FRD ZULAESSIG:
LINEAR SUPPORTS (SUPPORT BASKETS, - SNAKES) POINT SUPPORTS (SUPPORT BLOCKS)
LINIENFOERMIGE UNTERSTUETZUNGEN (UNTERSTUETZUNGSKOERBE, -
SCHLANGEN) PUNKTFOERMIGE UNTERSTUETZUNGEN (UNTERSTUETZUNGSBOECKE)
Pzul = 0,67 kN/m
MAXIMUM LAYING DISTANCE s FOR SUPPORTS MAXIMUM LAYING DISTANCE s FOR SUPPORTS MAXIMALER VERLEGEABSTAND s FUER UNTERSTUETZUNGEN MAXIMALER VERLEGEABSTAND s FUER UNTERSTUETZUNGEN BAR DIAMETER Øs OF TOP
REINFORCEMENT LINEAR SUPPORT
BAR DIAMETER Øs OF TOP
REINFORCEMENT POINT SUPPORT
STABDURCHMESSER Øs DER
OBEREN BEWEHRUNG
LINIENFOERMIGE
UNTERSTUETZUNG
STABDURCHMESSER Øs DER
OBEREN BEWEHRUNG
PUNKTFOERMIGE
UNTERSTUETZUNG
≤ 6,5 MM s = 50 CM ≤ 6,5 MM s = 50 CM 6,5 MM < ds ≤ 12 MM s = 70 CM 6,5 MM < ds ≤ 12 MM s = 70 CM
Øs > 12 MM *) s = 70 CM Øs > 12 MM *) s = 70 CM
*) IF THE SUPPORTING BARS ARE Øs > 12 MM, THE LAYING DISTANCE CAN BE
VERIFIED BY CALCULATION.
*) IF THE SUPPORTING BARS ARE Øs > 12 MM, THE LAYING DISTANCE
CAN BE VERIFIED BY CALCULATION.
*) SIND DIE UNTERSTUETZENDEN STAEBE Øs > 12 MM, KANN EIN
RECHNERISHER NACHWEIS DES VERLEGEABSTANDES DURCHGEFUEHRT
WERDEN.
*) SIND DIE UNTERSTUETZENDEN STAEBE Øs > 12 MM, KANN EIN
RECHNERISHER NACHWEIS DES VERLEGEABSTANDES
DURCHGEFUEHRT WERDEN.
D D
⌀s
⌀s
D
⌀s
D
D
⌀s
⌀s
D D
⌀s a a
S S S S
S
S
GENERAL NOTES ALLGEMEINE HINWEISE
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
S
TR
U C
TU
R
AL
G
EN
ER
AL
R
EB
AR
N O
TE
S
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-003
S
TA
TI
K
A
LL
G E
M E
IN
B
E W
E H
R U
N G
H
IN
W E
IS
E
1. DETAILED REINFORCEMENT FOR PREFABRICATED ELEMENTS IS FOR
INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE TO
PROVIDE SHOP DRAWINGS ACCORDING TO THE MANUFACTURER
REQUIREMENTS; BASED ON 100% APPROVED DRAWINGS.
CONTRACTOR IS RESPONSIBLE TO GET THE SHOP DRAWINGS
APPROVED BY THE PROOFING ENGINEER IN CHARGE.
1. DETAILLIERTE BEWEHRUNGSANGABEN FUER VORGEFERTIGTE
ELEMENTE DIENEN NUR ZU INFORMATIONSZWECKEN. DER
AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, WERKPLANUNG
GEMAESS DEN ANFORDERUNGEN DES HERSTELLERS ZU ERSTELLEN;
DIE AUF 100% GENEHMIGTEN ZEICHNUNGEN BASIEREN. DER
AUFTRAGNEHMER IST DAFUER VERANTWORTLICH, DASS DIE
WERKPLANUNG VOM ZUSTANENDIGEN PRUEFINGENIEUR GENEHMIGT
WERDEN.
2. THE CONTRACTOR IS SOLELY RESPONSIBLE TO MEASURE AND
QUANTIFY ALL PROJECTS REQUIREMENTS.
2. DER AUFTRAGNEHMER IST ALLEIN FUER DIE MESSUNG UND DIE
QUANTIFIZIERUNG ALLER PROJEKTANFORDERUNGEN
VERANTWORTLICH.
3. IN THE AREA OF CONSTRUCTION JOINTS, THE REINFORCEMENT MUST
BE CONTINUES.
3. IM BEREICH VON ARBEITSFUGEN MUSS DIE BEWEHRUNG
DURCHLAUFEND SEIN.
4. CONNECTING IN-SITU CONCRETE (COLUMNS) TO THE DOUBLE WALL
SYSTEM ACCORDING TO SHOP DRAWING / DOUBLE WALL
MANUFACTURER.
4. ANSCHLUESSE ORTBETONTEILE (STUETZEN) AN DOPPLEWAND
GEMAESS WERKSTATTZEICHNUNGEN / DOPPLEWAND HERSTELLER.
A
A1 S-301
3 4 5 6 9
B
D
F
H
J
L
C S-303
C S-303
S-202
S-201
S-203
F S-304
F S-304
E
G
C
K
B2 S-302
M
AT
C H
L
IN
E
/ S
-1
M
AT
C H
L
IN
E
/ S
-1
FN01.2
FN01.1
FN
.1
FN
.1
FN01.1
FN01.2
FN
.1
FN
.1
FN01.1
FN02.1FN02.1
FN02.1
FN
.1
FN01.1
FN01.2
FN
FN08
44,94
525 1,50 6,30 5,20 3,40 15,50 4,36 3,155 5,00
7,55 775 775 7,05 775 775 13,95 775 775 11,74
525525 15,10 775 775 27,24
2, 5 5
4, 3, 4, 5 5
2, 1, 5, 2, 5, 1, 6, 6, 7,55 775 775 7,05 775 775 13,95 775 775 4,575 1,405 1,55 3,525 1,55
1, 1,50 3,50 1,50
1, 5,50
TOF -0,100
BOF -0,350
TOF -0,100
BOF -1,100
TOF -0,100
BOF -1,100
TOF -0,770
BOF -1,170
1, 1, 1, FN13
FN21
TOF -0,770
BOF -1,170
FN21
FN12
FN11
FN
.2
FN02.1
FN09
FN01.2
FN
.2
FN
.2
FN
.2
FN
.2
FN
.2
FN
.2
FN01.3 FN01.4
,6
4, TOF -0,470
BOF -1,270
2,47 2,50 5,865 2,25
2, 1, 1, 1,75
1,25 775 775 30,265 2,47 1,25 1,25 6,905
525525 11,70 775 775 1,85 775 775 27,24
PERFORATED PIPES FOR RADON
PERFORIERTE ROHRE FUER RADON
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
GRAPHIC SCALE
MASSSTABSBALKEN
1:100
0 1 32 4 5 10
SCALE:
GENERAL SHEET NOTES
ALLGEMEINE PLANHINWEISE
TR
U
E N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
FO
U N
D
AT
IO
N
P
LA
N
ST
R
IP
F O
U N
D
AT
IO
N
, P
AR
T
O F
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-101
S
TA
TI
K
FU
N
D A
M E
N
TP
LA
N
S
TR
E
IF
E N
FU
N
D A
M E
N T, T E
IL
V O
N
SCALE / MASSSTAB: 1 : 100
STREIFENFUNDAMENTPLAN, TEIL 1 VON 2
STRIP FOUNDATION PLAN, PART 1 OF 21
FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37
FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37
FN01.3 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37
FN01.4 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37
FN02.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm 30/37
FN06 PAD FOUNDATION EINZELFUNDAMENT 250x450x80cm C30/37
FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70cm C30/37
FN09 PAD FOUNDATION EINZELFUNDAMENT 175x175x40 cm C30/37 WU
FN11 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37
FN12 PAD FOUNDATION EINZELFUNDAMENT 155x155x40cm C30/37
FN13 SLAB FOUNDATION -
VESTIBULE
BODENPLATTE -
WINGFANG
25cm C30/37
FN21 SOCKET FOUNDATION KOECHERFUNDAMENT 150x150x 100 cm C30/37
1 RADON MITIGATION SYSTEM RADONSCHUTZ
MINDERUNGSSYSTEM
2 MASS CONCRETE C12/16 FUNDAMENTUNTERFANGUNG
C12/16
1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE
FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF
THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN
BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS
FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE
FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO
DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN
RADON PIPES AND DRAINAGE PIPING.
1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE
DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER
AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG
UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE
NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU
INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE
AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER
AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU
KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND
ENTWAESSERUNGSROHREN ZU VERMEIDEN.
2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE
BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING
TO DIN 18451-1.
2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS
WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN
18451-1 AUSZUFUEHREN.
KEY NOTES
HAUPTANMERKUNGEN
POSITION SCHEDULE
POSITIONSLISTE
LEGEND
LEGENDE
9 10 13 14
B
D
F
H
J
L
S-203
S-201
S-202
A2 S-301
11 16
E
G
C
K
B1 S-302
E S-304
E S-304
D S-303
D S-303
M
AT
C H
L
IN
E
/ S
-1
M
AT
C H
L
IN
E
/ S
-1
TOF -0,470
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
1, 5, 2, 5, 1, 7,785 15,50 3,40 5,20 7,80 2,50 1,50 525
7,01 775 775 13,95 775 775 7,05 775 775 11,55
22,51 775 775 14,85 775 775 2,70 525525
5, 3, 2, 2,25 2,405
1,50
1, 7,01 1,55 13,95 1,55 1,85 1,55 3,65 1,55 6,50 1,05 2,95 1,05
TOF -3,400
BOF -3,650
FN01.2
FN02.2
FN
.2
FN08
FN01.1
FN
.2
FN02.2
FN02.2
FN01.2
FN
.1
FN
.2
FN
.1
FN01.1
FN01.2
FN01.2
FN01.1
2 2
FN13
TOF -0,770
BOF -1,170
FN21
FN10FN09
FN16
FN19
FN20
FN01.2
FN02.2
FN
.2
FN
.1
TOF -1,470
BOF -1,870
7,01 1,55 15,50 7,05 1,55 11,55
7,785 15,50 3,40 5,20 7,80 2,50 1,50 525
FN15
FN01.4
FN
.2
FN
.2
FN
.2
FN
.2
FN
.2
FN
.1
FN
.2
,6
FN01.2
1,50
1, 1, 4, 4, 4, 2, 1, 4, 1, 4, 2, 6, 1, 6, 6, 1, 6, 1,55 595 5,545
44,21
2 2
2 2
2 2
PERFORATED PIPES FOR RADON
PERFORIERTE ROHRE FUER RADON
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
GRAPHIC SCALE
MASSSTABSBALKEN
1:100
0 1 32 4 5 10
SCALE:
GENERAL SHEET NOTES
ALLGEMEINE PLANHINWEISE
TR
U
E N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
FO
U N
D
AT
IO
N
P
LA
N
ST
R
IP
F O
U N
D
AT
IO
N
, P
AR
T
O F
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-102
S
TA
TI
K
FU
N
D A
M E
N
TP
LA
N
S
TR
E
IF
E N
FU
N
D A
M E
N T, T E
IL
V O
N
SCALE / MASSSTAB: 1 : 100
STREIFENFUNDAMENTPLAN, TEIL 1 VON 2
STRIP FOUNDATION PLAN, PART 2 OF 21
FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37
FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37
FN01.4 PAD FOUNDATION EINZELFUNDAMENT 155x155x40c m C30/37
FN02.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37
FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37
FN09 PAD FOUNDATION EINZELFUNDAMENT
175x175x40 cm C30/37
WU
FN10 PAD FOUNDATION EINZELFUNDAMENT
175x175x40c m C30/37
WU
FN13 SLAB FOUNDATION -
VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37
FN15 GROUND SLAB FOUNDATION
- SPRINKLER TANK
BODENPLATTE FUNDAMENT
- SPRINKLERTANK
25cm C30/37
WU
FN16 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 100x40cm
C30/37 WU
FN19 PAD FOUNDATION EINZELFUNDAMENT 155x150x40c m C30/37
FN20 PAD FOUNDATION EINZELFUNDAMENT 155x180x40c m C30/37
FN21 SOCKET FOUNDATION KOECHERFUNDAMENT
150x150x 100 cm C30/37
1 RADON MITIGATION SYSTEM RADONSCHUTZ
MINDERUNGSSYSTEM
2 MASS CONCRETE C12/16 FUNDAMENTUNTERFANGUNG
C12/16
1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE
FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF
THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN
BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS
FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE
FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO
DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN
RADON PIPES AND DRAINAGE PIPING.
1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE
DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER
AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG
UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE
NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU
INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE
AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER
AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU
KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND
ENTWAESSERUNGSROHREN ZU VERMEIDEN.
2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE
BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING
TO DIN 18451-1.
2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS
WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN
18451-1 AUSZUFUEHREN.
LEGEND
LEGENDE
POSITION SCHEDULE
POSITIONSLISTE
KEY NOTES
HAUPTANMERKUNGEN
A1 S-301
3 4 5 6 9
B
D
F
H
J
L
C S-303
C S-303
S-202
S-201
S-203
F S-304
F S-304
40 44,54
40 125 1,50 6,30 5,20 3,40 15,50 4,36 3,155 5,00
1, 5, 2, 5, 1, 2, 4, 4, 2, M
AT
C H
L
IN
E
/ S
-1
M
AT
C H
L
IN
E
/ S
-1
E
G
7,55 65 25 65 3,65 65 25 65 1,85 65 25 65 13,95 65 25 65 4,325 25 1,405 345 865 345 3,525
50 685
C
K
B2 S-302
EW16EW08
EW12
EW08
EW04 EW12
EW16
IW04
IW04
IW08
IW08
IW12
IW12
FN03
FN03
FN03
FN03
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
S-503
1, 2, 1,50 3,50 1,50
FN05
FN04
FN05
FN05
FN05
,3
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
40 25 40 11,70 65 25 65 1,85 65 25 65 14,815 55 11,875
TOF -0,770
BOF -1,170
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
FN13
SC01 SC01
EW
EW
40 25 40 15,10 65 25 65 27,24
FN
EW04
EW
EW
EW
EW
EW
EW
EW
EW
IW
IW
IW08
IW
RW01
R W
RW01
CL37
CL37
CL04
CL20 CL28
CL08
CL24
IW04
IW04
IW12
IW12
IW12
IW12
FN09
FN08
FN
FN05
FN21 FN21
A-504
TOF -0,100
BOF -0,350
TOF -0,100
BOF -1,100
TOF -0,100
BOF -1,100
CL12
FN17
6, 6, 1,25 65 25 65 29,715 55 2,47 95 60 95 6,905
6, 1, 1, 1, 6, 4, 7,55 65 25 65 7,05 65 25 65 13,95 65 25 65 11,74
DOPPELWAND
DOUBLE WALL
CAST-IN-PLACE REINFORCED CONCRETE
BEWEHRTER ORTBETON
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
GRAPHIC SCALE
MASSSTABSBALKEN
1:100
0 1 32 4 5 10
SCALE:
GENERAL SHEET NOTES
ALLGEMEINE PLANHINWEISE
TR
U
E N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
FO
U N
D
AT
IO
N
P
LA
N G
R O
U N
D S
LA
B
FO
U
N D
A
TI
O N
, P A
R T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-103
S
TA
TI
K
FU
N
D A
M E
N
TP
LA
N
B O
D E
N P
LA
TT
E , T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
FUNDAMENTPLAN, TEIL 1 VON 2
FOUNDATION PLAN, PART 1 OF 21
CL04 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
CL08 RC COLUMN - GND FL STB STUETZE - EG 28x60 cm C30/37
CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37
CL20 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
CL24 RC COLUMN -GND FL STB STUETZE - EG 28x60 cm C30/37
CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37
CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
EW04 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW08 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW12 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW16 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW21 RC EXTERIOR WALL-
VESTIBULE
STB AUSSENWAND -
WINGFANG
25cm C30/37
FN03 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN04 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN05 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37
FN06 PAD FOUNDATION EINZELFUNDAMENT 250x450x80c m C30/37
FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37
FN09 PAD FOUNDATION EINZELFUNDAMENT
175x175x40 cm C30/37
WU
FN13 SLAB FOUNDATION -
VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37
FN16 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 100x40cm
C30/37 WU
FN17 GROUND SLAB FOUNDATION
- ELEVATOR
BODENPLATTE FUNDAMENT
- AUFZUG
20cm C30/37
WU
FN21 SOCKET FOUNDATION KOECHERFUNDAMENT
150x150x 100 cm C30/37
IW04 RC INTERIOR WALL - GND
FL STB INNENWAND - EG 25cm C30/37
IW08 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37 IW12 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37
RW01 RC RETAINING WALL -
ELEVATOR
STB STUETZWAND -
AUFZUG
25cm C30/37
WU
SC01 STEEL COLUMN - CANOPY STAHLSTUETZE - VORDACH HEB260 355
1 RADON MITIGATION SYSTEM RADONSCHUTZ
MINDERUNGSSYSTEM
1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE
FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF
THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN
BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS
FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE
FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO
DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN
RADON PIPES AND DRAINAGE PIPING.
1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE
DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER
AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG
UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE
NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU
INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE
AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER
AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU
KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND
ENTWAESSERUNGSROHREN ZU VERMEIDEN.
2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE
BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING
TO DIN 18451-1.
2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS
WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN
18451-1 AUSZUFUEHREN.
LEGEND
LEGENDE
POSITION SCHEDULE
POSITIONSLISTE
B
D
F
H
J
L
S-203
S-201
S-202
A2 S-301
1,185
595 255 5,29 65 25 65 13,95 65 25 65 1,85 65 25 65 3,65 65 25 65 11,55
M
AT
C H
L
IN
E
/ S
-1
M
AT
C H
L
IN
E
/ S
-1
TOF -1,250
BOF -1,450
E
G
C
K
43,81 40
,3
B1 S-302
EW16
EW12
EW20
EW04
EW20
EW12
EW16
E S-304
E S-304
IW17
IW18
IW18
7,785 15,50 3,40 5,20 7,80 2,50 1,50 125 40
TOF -0,550
BOF -0,750
FN03 FN03
FN03
FN03
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
A S-505
D S-303
D S-303
S-503
FN01.2
IW19
IW18
73 4,865 8,445 30 4,25 30 4,35 65 25 65 14,85 65 25 65 2,70 40 25 40
FN05
FN05
FN03
FN04
FN03
FN14
FN05
FN05
S-512
TOF -0,100
BOF -1,100
TOF -0,100
BOF -0,350
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
TOF -0,770
BOF -1,170
TOF -0,770
BOF -1,170
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
TOF -0,190
BOF -0,340
TOF -0,770
BOF -1,170
2, 1, FN13
SC01
EW
2,25
2, FN08
STEEL PLATFORM
STAHLPLATTFORM
EW
IW
IW
IW
EW
EW
EW22
EW22
IW
IW
EW
EW
EW
EW
EW
FN14
R W
RW01
RW01
R W
R W
CL36
C L3
CL28
CL16CL12
CL37
CL37IW16 IW17 IW17
IW17 IW18
IW19
IW20
IW20
R W
RW03
RW05
R
W
RW04
A S-507
FN
TOF -1,250
BOF -1,450
A-504
TOF -0,770
BOF -1,170
FN01.1
FN01.1
FN01.2
FN01.2
FN
.1
FN
.1
FN01.2
TOF -0,190
BOF -0,390
FN01.2
EW04
FN03
FN18
FN17
7,01 65 25 65 13,95 65 25 65 7,05 65 25 65 11,55
6,345 97 575 6,525 4,85 21,00 1,05 1,20 65 25 65 1,25
22,51 65 25 65 1,85 65 25 65 11,70 40 25 40 2,95 40 25 40
1, 5, 2, 5, 1, 1, 4, 1, 4, 2, 6, 1, 6, 2, 1, 3, 1, 4, 2, 4, 4, 6, IW17
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
GRAPHIC SCALE
MASSSTABSBALKEN
1:100
0 1 32 4 5 10
SCALE:
GENERAL SHEET NOTES
ALLGEMEINE PLANHINWEISE
TR
U
E N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 1:
P
M
ST
R
U C
TU
R
AL
FO
U N
D
AT
IO
N
P
LA
N G
R O
U N
D S
LA
B
FO
U
N D
A
TI
O N
, P A
R T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-104
S
TA
TI
K
FU
N
D A
M E
N
TP
LA
N
B O
D E
N P
LA
TT
E , T
E
IL
V
O N
SCALE / MASSSTAB: 1 : 100
FUNDAMENTPLAN, TEIL 2 VON 2
FOUNDATION PLAN, PART 2 OF 21
1 RADON MITIGATION SYSTEM RADONSCHUTZ
MINDERUNGSSYSTEM
2 ELEVATOR SHAFT AUFZUGSCHACHT
NON-LOAD BEARING PARTITION
WALL - AERATED CONCRETE
BLOCKS 11,5 cm
NICHT TRAGENDE TRENNWAND -
PORENBETONSTEINE 11,5 cm
CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37
CL16 RC COLUMN - GND FL STB STUETZE 54x25cm C30/37
CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37
CL32 RC COLUMN - GND FL STB STUETZE - EG 50x25cm C30/37
CL36 RC COLUMN - GND FL STB STUETZE - EG 30x25cm C30/37
CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
EW04 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW12 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW16 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW20 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW21 RC EXTERIOR WALL-
VESTIBULE
STB AUSSENWAND -
WINGFANG
25cm C30/37
EW22 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
FN01.1 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 105x40cm C30/37
FN01.2 STRIP FOUNDATION BEAM STREIFENFUNDAMENT 155x40cm C30/37
FN03 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN04 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37 FN05 GROUND SLAB FOUNDATION BODENPLATTE 15cm C30/37
FN08 PAD FOUNDATION EINZELFUNDAMENT 225x225x70c m C30/37
FN13 SLAB FOUNDATION -
VESTIBULE BODENPLATTE - WINGFANG 25cm C30/37
FN14 GROUND SLAB FOUNDATION BODENPLATTE 20cm C30/37
FN17 GROUND SLAB FOUNDATION
- ELEVATOR
BODENPLATTE FUNDAMENT
- AUFZUG
20cm C30/37
WU
FN18 GROUND SLAB FOUNDATION
- ELEVATOR
BODENPLATTE FUNDAMENT
- AUFZUG
20cm C30/37
WU
FN21 SOCKET FOUNDATION KOECHERFUNDAMENT
150x150x 100 cm C30/37
IW16 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37 IW17 RC INTERIOR WALL - GND FL STB INNENWAND EG 25cm C30/37
IW18 RC INTERIOR WALL - GND
FL STB INNENWAND EG 25cm C30/37
IW19 RC INTERIOR WALL - GND
FL STB INNENWAND EG 25cm C30/37
IW20 RC INTERIOR WALL - GND
FL STB INNENWAND EG 25cm C30/37
RW01 RC RETAINING WALL -
ELEVATOR
STB STUETZWAND -
AUFZUG
25cm C30/37
WU
RW02 RC RETAINING WALL -
SPRINKLER TANK
STB STUETZWAND -
SPRINKLERTANK
30cm C30/37
WU
RW03 RC RETAINING WALL -
SPRINKLER TANK
STB STUETZWAND -
SPRINKLERTANK
25cm C30/37
RW04 RC RETAINING WALL -
SPRINKLER TANK
STB STUETZWAND -
SPRINKLERTANK
30cm C30/37
WU
RW05 RC RETAINING WALL -
SPRINKLER TANK
STB STUETZWAND -
SPRINKLERTANK
25cm C30/37
WU
SC01 STEEL COLUMN - CANOPY STAHLSTUETZE - VORDACH HEB260 355
1. RADON PIPING EXTRACTION SYSTEM SUITABLE TO MEET THE
FOOTPRINT OF THE BUILDING: INSTALLATION OF PIPES TO OUTSIDE OF
THE BUILDING WHERE A VERTICAL RISER AND FAN INSTALLATION CAN
BE PLACED IF DEEMED NECESSARY. RADON PIPE ILLUSTRATION IS
FOR INFORMATIONAL PURPOSE ONLY. CONTRACTOR IS RESPONSIBLE
FOR UPDATING THE DESIGN USING THE MOST ADVANCE SOLUTION TO
DATE. CONTRACTOR TO COORDINATE AND AVOID CLASHES BETWEEN
RADON PIPES AND DRAINAGE PIPING.
1. RADONSCHUTZ MINDERUNGSSYSTEM DAS AN DIE GRUNFLAECHE
DES GEBAEUDES ANGEPASST IST: EINBAU DER ROHRE AN DER
AUSSENSEITE DES GEBAEUDES, WO EINE VERTIKALE STEIGLEITUNG
UND EIN VENTILATOR ANGEBRACHT WERDEN KOENNTE, FALLS SIE
NOTWENDIG SIND. DIE ABBILDUNG DER RADONLEITUNG DIENT NUR ZU
INFORMATIONSZWECKEN. DER AUFTRAGNEHMER IST FUER DIE
AKTUALISIERUNG DES ENTWURFS UNTER VERWENDUNG DER
AKTUELLSTEN LOESUNG VERANTWORTLICH. AUFTRAGNEHMER ZU
KOORDINIEREN UND KOLLISIONEN ZWISCHEN RADONROHREN UND
ENTWAESSERUNGSROHREN ZU VERMEIDEN.
2. ALL CONCRETE SURFACES IN CONTACT WITH THE GROUND ARE TO BE
BUILT AS WATERTIGHT CONCRETE WITH WATERSTOPS ACCORDING
TO DIN 18451-1.
2. ALLE ERDBERUEHRTEN BETONFLAECHEN SIND ALS
WASSERUNDURCHLAESSIGER BETON MIT FUGENBLECHEN NACH DIN
18451-1 AUSZUFUEHREN.
KEY NOTES
HAUPTANMERKUNGEN
POSITION SCHEDULE
POSITIONSLISTE
A1 S-301
3 4 5 6 9
B
D
F
H
J
L
C S-303
C S-303
S-202
S-201
S-203
F S-304
F S-304
44,54
7,80 8,85 15,25 12,64
25 7,55 25 8,35 25 15,25 25 12,39
M
AT
C H
L
IN
E
/ S
-1
M
AT
C H
L
IN
E
/ S
-1
7,80 8,85 15,25 12,64
25 7,55 25 8,35 25 15,25 25 12,39
E
G
7,80 5,20 3,40 15,50 7,515 5,00
TOC 4,100
BOC 3,800
TOC 4,100
BOC 3,800
TOC 4,100
BOC 3,800
1,81 1,50 1,00 2,105
1,50 2,00 885 1,34
1,50 2,00 2,175
1,50 2,00 1,34 1,02
1,50 2,00 2,46
1,50 1,00 2,59
1,50 1,00 2,46
1,50 2,00 72 975
1,50 2,00 2,25
2,94 5,55 1,865
ST08
ST07
SL
SL
BM13
BM13
BM13
BM14
BM13 BM13
BM13
BM13
BM13
BM08
BM07CL24
CL08
CL28
CL12
C
K
TOC 4,100
BOC 3,800
TOC 4,100
BOC 3,800
TOC 4,100
BOC 3,800
TOC 4,100
BOC 3,800
1,81 1,50 1,00 2,105
1,50 2,00 885 1,34
1,50 2,00 2,40
2,325
1,01 2,105 1,02 1,50 2,00 2,46
1,50 1,00 2,59
1,50 1,00 2,46
1,50 2,00 72 5,225
2,94 2,00 5,415
B2 S-302
EW04
EW08
EW12
EW16
EW04
EW08
EW12
EW16
SL
SL
IW04
IW04
IW08
IW08 IW12
IW12
S-509
S-511
2, 6, 1, 6, 2, 4, 3, 8, 2, 6, 1, 6, 2, 5, 2, 1, 1, 1, 8, 1, 2, 2, TOC 3,250
BOC 3,000
3, 5, 1, 5, 2, 5, 1, ,5
,5
2, BOC 3,550 BOC 3,400
SL
BOC 3,550
BOC 3,550
BOC 3,550
BOC 3,550 BOC 3,550
BOC 3,550
BOC 3,550
BOC 3,550 BOC 3,400
1,75 2,03 2,77 1,44 3,99 1,405
2,325
1,01 3,745 2,77 7,03 2,27 50 1,005 40 3,97 60 7,64 60
1,50 25 2,03 2,77 1,44 2,54 3,415 2,455 1,74 2,77 7,03 2,77 1,005 40 3,97 60 7,50 25 105
BM08
BM07
BOC 3,400
BOC 3,400
RF09
EW
EW
S-411
BM
EW
BM
EW
EW
IW
IW
IW
EW
08EW
EW
EW
EW
EW
BM16* BM15*
BM15* BM15*
BM15* BM16* BM16* BM15*
BM15* BM10
BM11
BM16*BM15*
BM15*BM16*BM16*BM15*
BM16*BM15*
BM15*BM16*
BM34*
CL04
CL20
CL37
CL37
IW04
IW04
IW12
IW12
IW24
IW
DOPPELWAND
DOUBLE WALL
CAST-IN-PLACE REINFORCED CONCRETE
BEWEHRTER ORTBETON
PLANS ARE IN ACCORDANCE WITH THE APPROVED ORIGINAL COPY OF
THE APPROVAL ENGINEER OF RECORD (RELEASE DATE 11.11.2022)
PLAENE STIMMEN MIT DEM GEPRUEFTEN EXEMPLAR DES
PRUEFINGENIEURS UEBEREIN (FREIGEGEBEN AM 11.11.2022)
GRAPHIC SCALE
MASSSTABSBALKEN
1:100
0 1 32 4 5 10
SCALE:
TR
U
E N
PLAN
NORTH
US Army Corps of Engineers
C R O
M W
E L L
SHEET ID
D R
AW
N
B Y
C H
EC
KE
D B
Y
SU
BM
IT
TE
D B
Y
D
ES
IG
N
ED
B
Y
SI
ZE
IS
SU
E D
AT
E
P
LO
TT
ED
/ P
LA
N D
AT
U
M
/ G R
O E
SS
E
/ G
EZ
EI
C
H N
E T:
/ G
EP
R U
E
FT
/ V O
R G
E
LE
G T:
/ G
EN
E H
M
IG
T:
/ BLATT
/ R E
V / D
AT
U
M / B
ES
C
H R
E
IB
U N
G M
AR
K
D
AT
E D
ES
C
R
IP
TI
O
N
SO
LI
C
IT
AT
IO
N N
O
AU
FT
R A
G S
-N R
C O
N
TR
AC
T
N O
/ V
E R
TR
A
G S-
N R
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EU
R
O
PE
D
IS
TR
IC
T -C
O N
TR
AC
TI
N
G D
IV
IS
IO
N
KO
N
R
AD
A D
EN
AU
ER
R
IN
G
W
IE
SB
A D
EN
G
ER
M
A N
Y
IS
O
A
SEAL
FOR
CONSTRUCTIO
N
SEAL
NORTH ARROW
NORDPFEIL
SM
IT
H B
AR
R
AC
KS
, U
SA
G R
H
EI
N
LA
N D
-P
FA
LZ
, B
AU
M
H O
LD
ER
, G
ER
M
AN
Y
FY
P
N
C O
N
ST
R U
C T
AR
M
Y
LO
D G
IN
G
F
AC
IL
IT
Y
C O
R R
EC
TE
D
N O
V
EM
B
ER
W
2G B
F0
W
2G B1
9D
CUI//REL TO DEU
C U
I// R
EL
T
O D
EU
C U
I// R
EL
T
O D
EU
CUI//REL TO DEU
±0.000 GROUND FLOOR-EG = 509.7 ASL / UEBER NN
/1
1/
:3 2:
P
M
ST
R
U C
TU
R
AL
FR
AM
IN
G P
LA
N
SL
AB
A
BO
VE
G
R O
U N
D F
LO
O
R , P
AR
T
O
F
A
EC
O M
D
ES
IG
N
T
EA
M
M . D
E
IE
R
LE
IN
I.
M
IK
LO
S
I.
M
E N
EN
D
EZ
S-111
S
TA
TI
K
TR
A
G E
W E
R K
S P
LA
N
D E
C K
E U
E B
E R
E R
D E
G E
S C
H O
S S
, T E
IL
V O
N
SCALE / MASSSTAB: 1 : 100
DECKE UEBER ERDEGESCHOSS, TEIL 1 VON 2
SLAB ABOVE GROUND FLOOR, PART 1 OF 21
BM07 RC T-BEAM - 1ST FL STB PLATTENBALKEN - 1OG bx25x70cm C30/37
BM08 RC T-BEAM - 1ST FL STB PLATTENBALKEN - 1OG bx25x70cm C30/37
BM10 RC BEAM GND FL STB BALKEN EG 25x95cm C30/37
BM11 RC BEAM GND FL STB BALKEN EG 25x70cm C30/37
BM13 TYPICAL RC BEAM BETWEEN
INTERIOR WALLS
TYPISCHER STB BALKEN
ZWISCHEN INNENWAENDE
25x55cm C30/37
BM14 RC BEAM STB BALKEN 25x55cm C30/37
BM15* LINTEL REINFORCEMENT STURZBEWEHRUNG 25x35cm C30/37
BM16* LINTEL REINFORCEMENT STURZBEWEHRUNG 25x35cm C30/37
BM21 RC BEAM-WALL - GND FL STB BALKEN - EG 25x135cm C30/37
BM29* LINTEL REINFORCEMENT STURZBEWEHRUNG 25cm C30/37 BM34* LINTEL REINFORCEMENT STURTZBEWEHRUNG 25cm C30/37
CL04 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
CL08 RC COLUMN - GND FL STB STUETZE - EG 28x60 cm C30/37
CL12 RC COLUMN - GND FL STB STUETZE - EG 50x25 cm C30/37
CL20 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
CL24 RC COLUMN -GND FL STB STUETZE - EG 28x60 cm C30/37
CL28 RC COLUMN - GND FL STB STUETZE - EG 28x60cm C30/37
CL37 RC COLUMN - GND FL STB STUETZE - EG 25x40cm C30/37
EW04 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW08 RC EXTERIOR WALL - GND
FL STB AUSSENWAND - EG 25cm C30/37
EW12 RC EXTERIOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .