A.2.11.3_Att6BidSchedule.docx

DOCX document 30 KB Posted

Attached to
RFI Amendment Federal contract opportunity
Solicitation number
W912GB-16-R-0036
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

Solicitation Attachment 06

View the file

Other files for this federal contract opportunity

Other files attached to RFI Amendment, newest first.
File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
A.2.11.3_Request_for_Information.docx DOCX document
A.07.23 W912GB-16-R-0036.pdf PDF
A.2.11.3_Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.2.11.3_Att1expovervw.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 32 01.00 15 Project Schedule —
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
A.2.11.3 Att3PPQ.docx DOCX document
01 00 15 Design After Award.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
Construction Signs.pdf PDF
A.2.11.3_Att8BLA.Template.docx DOCX document
A.2.11.3 Att1expovervw.docx DOCX document
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
A.2.11.3 Att5letterofcommit.docx DOCX document
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.2.11.3_Att3PPQ.docx DOCX document
01 35 26 Safety and Occupational Health Requirements —
A.2.11.3 Att2expinfosheet.docx DOCX document
00 73 15 General Conditions —
A.2.11.3 Att4KeyPersResume.docx DOCX document
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
Construction Signs.pdf PDF
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 78 23 Operation and Maintenance Data.pdf PDF
Show all 50

RFI Amendment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Request for Proposal (RFP) Azerbaijan IDP School Project Lachin Chirag Village, Baku, Azerbaijan 15 July 2016

The Offeror shall bid on all base bid and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the bid schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.

See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or Bid Schedule including interim completion dates for individual facilities.

Base Bid Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP).

Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 120 calendar days following issuance of NTP for the base bid work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10 “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, they must be completed within the base period of performance of 365 calendar days.

This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.

Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday. Work on local holidays and outside of these hours shall not be performed without prior approval from the Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours CET, except U.S. holidays.

Prices: All prices are to be proposed in U.S. Dollars.

Liquidated Damages: Liquidated damages shall be assessed in the amount of 900 US Dollars per calendar day of delay beyond the required completion date of the contract.

BASE ITEMS: The base items include all labor, transportation, equipment, materials, and any other services necessary for the design and construction of the IDP Lachin-Chirag School as described in the Statement of Work and specifications except the work described in the options below.

CLIN 0001

Base Item 1: Construct New School

All work associated with the design and construction of an IDP school building and boiler building. The new school facility shall accommodate 270 students and 20 staff per shift with eleven classrooms (10 designed to accommodate 24 students and 1 designed to accommodate 30 students). The work under this item includes the design and construction of a single-story masonry/concrete school building with sloped roofs, adequately sized restrooms, natural ventilation, a separate boiler building, plumbing, electrical and communication systems. It also includes performance of all required surveys, mobilization and demobilization of necessary equipment, site clearance, required demolition, earthwork and grading, installation, adaptation or relocation of underground utilities, design and construction of site drainage features, and any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.
$____________

CLIN 0002

Base Item 2: Fence and Gates

All work associated with the replacement of the existing perimeter fence and the pedestrian gate and the installation of a new pedestrian gate (south west corner of the site), in lieu of a wall section (to be demolished); any other work directly related to this item as described in the statement of work and specifications except those items defined in the options.
$____________

CLIN 0003

Base Item 3: Demolition of Existing Facility

All work associated with the demolition of an existing metal structure located aside of the existing toilet building to remove significant health and safety hazards.
$____________

BASE ITEMS TOTAL:

OPTIONAL ITEMS:

CLIN

Option Item 1: Asphalt Walkways and Pedestrian surfaces

All work associated with design and construction of asphalt walkways and pedestrian surfaces. All new pavements shall meet handicapped accessibility requirements that comply with current Host Nation codes and standards.
$____________

CLIN

Option Item 2: Asphalt Athletic Surface

All work associated with design and construction of a new athletic surface made of asphalt.
$____________

CLIN

Option Item 3: Landscaping

All work associated with the provision of green spaces by lawn seeding and with the protection/replacement of existing/damaged vegetation if any.
$____________
OPTION ITEMS TOTAL:
$____________
TOTAL PRICE – ALL BASE AND OPTION ITEMS:
$____________

File details come from the government source that posted it. Updated .