A.2.11.3_Att1expovervw.docx

DOCX document 26 KB Posted

Attached to
RFI Amendment
Solicitation number
W912GB-16-R-0036
Issued by

About this file

Solicitation Attachment 01

View the file

Other files

File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
A.2.11.3_Request_for_Information.docx DOCX document
01 32 01.00 15 Project Schedule —
01 45 01 USACE Quality Control.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
Construction Signs.pdf PDF
A.2.11.3 Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.07.23 W912GB-16-R-0036.pdf PDF
00 73 15 General Conditions —
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
A.2.11.3 Att3PPQ.docx DOCX document
01 00 15 Design After Award.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
01 35 26 Safety and Occupational Health Requirements —
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
Construction Signs.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 78 23 Operation and Maintenance Data.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

PROJECT TITLE: IDP School Building PROJECT LOCATION Lachin Chirag Village, Baku, Azerbaijan

SOLICITATION NUMBER: W912GB-16-R-0036

Project Name
Prime
Sub
Joint Venture
Key Subcontractor
Total $ Amount
Project Start Date
Project Completion Date
a) (from list below)
b)
c)
d)

e)

SAMPLE Building Renovation, Base XXX X

X

750
1-Jul-05
1-Jul-05
X
X

X

a) Design-build experience.

b) Demonstrate experience working in any of the European countries with projects performed in Azerbaijan being considered most relevant

c) Demonstrate experience in building schools.

d) Demonstrate experience in electrical and controls work to include transformer installation, buried electrical and control cables, control panels, disconnect switches, grounding protection, etc.

e) Demonstrate experience in minor earthwork, grading, and roadway surface repair