A.2.11.3_Request_for_Information.docx

DOCX document 13 KB Posted

Attached to
RFI Amendment
Solicitation number
W912GB-16-R-0036
Issued by

About this file

Request for Information

View the file

Other files

File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
01 32 01.00 15 Project Schedule —
01 45 01 USACE Quality Control.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
Construction Signs.pdf PDF
A.2.11.3 Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.07.23 W912GB-16-R-0036.pdf PDF
00 73 15 General Conditions —
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
A.2.11.3_Att1expovervw.docx DOCX document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
A.2.11.3 Att3PPQ.docx DOCX document
01 00 15 Design After Award.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
01 35 26 Safety and Occupational Health Requirements —
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
Construction Signs.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 78 23 Operation and Maintenance Data.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information #1

1) As we understood, this is design build project. Who will draw the project?

Answer: The first is that a Designer of Record is required to be provide in the response to the solicitation on page 18 of 197 of the file A.07.23_W912GB-16-R-0036.pdf paragraph 4. Please also see specification section 01_00_15_Design_After_Award.pdf. The design shall be done by a Designer of record with the ability to get it approved in the country of Azerbaijan.

2) According to local laws, every project should pass the examination under Azerbaijan Republic Ministry of Emergency. Whose obligation is to make the project examined? Client's or Offerer?

Answer: See page 131 of 197 of the file A.07.23_W912GB-16-R-0036.pdf FAR 52.237-7 Permits and responsibility. It is the contractor’s responsibility to get all permits.

3) Does the project have the decree from Region Executive Power about site ?

Answer: According to the end user the power company is aware of the project.

4) Have the site got the review from different bodies of Azerbaijan Republic?

Answer: The land belongs to the school. If this pertains to permitting see page 131 of 197 of the file A.07.23_W912GB-16-R-0036.pdf FAR 52.237-7 Permits and responsibility. It is the contractor’s responsibility to get all permits.

5) Have the construction site received the geological review?

Answer: See page 169 of 197 of the file A.07.23_W912GB-16-R-0036.pdf paragraph 2.2.3 Geologic Survey is the responsibility of the contractor.