A.2.11.3 Att3PPQ.docx

DOCX document 36 KB Posted

Attached to
RFI Amendment
Solicitation number
W912GB-16-R-0036
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
A.2.11.3_Request_for_Information.docx DOCX document
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
01 00 15 Design After Award.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
Construction Signs.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.2.11.3_Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.2.11.3_Att1expovervw.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 32 01.00 15 Project Schedule —
A.2.11.3_Att8BLA.Template.docx DOCX document
A.2.11.3 Att1expovervw.docx DOCX document
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
A.2.11.3 Att5letterofcommit.docx DOCX document
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.2.11.3_Att3PPQ.docx DOCX document
A.2.11.3_Att6BidSchedule.docx DOCX document
01 35 26 Safety and Occupational Health Requirements —
A.2.11.3 Att2expinfosheet.docx DOCX document
00 73 15 General Conditions —
A.2.11.3 Att4KeyPersResume.docx DOCX document
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
Construction Signs.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 78 23 Operation and Maintenance Data.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

PROJECT TITLE: Construct IDP School PROJECT LOCATION: Lachin Chirag Village, Baku, Azerbaijan

SOLICITATION NUMBER: W912GB-16-R-0036

USACE PAST PERFORMANCE QUESTIONNAIRE ATTACHMENT 3

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name:

Address:

Phone Number:

Email Address:

Point of Contact:Contact Phone Number:
CAGE Code:

DUNS Number:

2. Work Performed as: ❑ Prime Contractor Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

❑ Sub
Contractor❑ Joint
Venture❑ Other (Explain)

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

❑ Other (Please specify):

Contract Type: ❑ Firm Fixed Price ❑ Cost Reimbursement Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:
Complexity of Work ❑ High❑ Med❑ Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client's role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client's Signature:

NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM

TO BE COMPLETED BY CLIENT - ATTCHMENT 3

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR'S PERFORMANCE.

E = EXCELLENT, VG = VERY GOOD, S = SATISFACTORY, M = MARGINAL,

U = UNSATISFACTORY, N= NOT APPLICABLE

1. QUALITY:

a) Quality of technical data/report preparation efforts
E
VG
S
M
U
N
b) Ability to meet quality standards specified for technical performance
E
VG
S
M
U
N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E
VG
S
M
U
N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E
VG
S
M
U
N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E
VG
S
M
U
N
b) Rate the contractor's use of available resources identified in the contract
E
VG
S
M
U
N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
E
VG
S
M
U
N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E
VG
S
M
U
N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E
VG
S
M
U
N
d) Overall customer satisfaction
E
VG
S
M
U
N

4. MANAGEMENT PERSONEL/LABOR:

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force.
E
VG
S
M
U
N
b) Ability to hire, apply, and retain a qualified workforce to this effort
E
VG
S
M
U
N
c) Government Property Control
E
VG
S
M
U
N
d) Knowledge/expertise demonstrated by contractor personnel
E
VG
S
M
U
N
e) Utilization of Small Business concerns
E
VG
S
M
U
N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E
VG
S
M
U
N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E
VG
S
M
U
N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E
VG
S
M
U
N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)
E
VG
S
M
U
N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E
VG
S
M
U
N
c) If this is/was a Government cost type contract, please rate the Contractor's timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E
VG
S
M
U
N
d) Is the Contractor's accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
E
VG
S
M
U
N
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
E
VG
S
M
U
N

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

YES

NO

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E
VG
S
M
U
N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E
VG
S
M
U
N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E
VG
S
M
U
N
b) Compliance with contractual terms/provisions (explain if specific issues)
E
VG
S
M
U
N

c) Would you hire or work with this firm again? (If no, please explain below)

YES

NO

d) In summary, provide an overall rating for the work performed by this contractor.
E
VG
S
M
U
N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments, which may assist our office in evaluating performance risk (attach additional pages if necessary):