A.2.11.3 Att4KeyPersResume.docx

DOCX document 28 KB Posted

Attached to
RFI Amendment Federal contract opportunity
Solicitation number
W912GB-16-R-0036
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to RFI Amendment, newest first.
File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
A.2.11.3_Request_for_Information.docx DOCX document
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
A.2.11.3 Att3PPQ.docx DOCX document
01 00 15 Design After Award.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
Construction Signs.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.2.11.3_Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.2.11.3_Att1expovervw.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 32 01.00 15 Project Schedule —
A.2.11.3_Att8BLA.Template.docx DOCX document
A.2.11.3 Att1expovervw.docx DOCX document
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
A.2.11.3 Att5letterofcommit.docx DOCX document
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.2.11.3_Att3PPQ.docx DOCX document
A.2.11.3_Att6BidSchedule.docx DOCX document
01 35 26 Safety and Occupational Health Requirements —
A.2.11.3 Att2expinfosheet.docx DOCX document
00 73 15 General Conditions —
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
Construction Signs.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 78 23 Operation and Maintenance Data.pdf PDF
Show all 50

RFI Amendment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

PROJECT TITLE: Construct IDP School PROJECT LOCATION: Lachin Chirag Village, Baku, Azerbaijan

SOLICITATION NUMBER: W912GB-16-R-0036

KEY PERSONNEL RESUME

Provide information, listed below, on separate sheets showing qualifications of: prime contractor’s project manager responsible for design and construction, and the Designers of Record.

Use a continuation sheet, if needed.

NOTE: Match the positions on this page to the list of key personnel in the narrative submission requirements and evaluation criteria.

(a) Your Name and Title______________________________________________________________________

(b) Your Assignment on this Project_____________________________________________________________

(c) Name of Your Firm______________________________________________________________________

(d) No. of Years: With this Firm__________ With other Firms____________

(e) Education: Degree(s)/Year/Specialization__________________________________________________

(f) MUST COMPLETE: Active Registration/Certification, if any: No._______, State(s) ______, Countries_______, First Year/ Current Year ______/______ , N/A, please describe how designs will be registered/certified in order to meet the solicitation requirements.

(g) Describe Your Specific Experience and Qualifications Relevant to this Project:

File details come from the government source that posted it. Updated .