A.2.11.3 Att1expovervw.docx

DOCX document 26 KB Posted

Attached to
RFI Amendment Federal contract opportunity
Solicitation number
W912GB-16-R-0036
Issued by
Department of the Army Corps of Engineers Engineering District Europe

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to RFI Amendment, newest first.
File Type Posted
A.2.11.3_Request_for_Information_2.docx DOCX document
W912GB-16-R-0036_Lachin_IDP_School_AZ_Pre-Proposal_Conf_26Jul16.pptx PPTX presentation
A.2.11.3_Request_for_Information.docx DOCX document
00 73 15.50 General Conditions —
A.2.11.3_Att5letterofcommit.docx DOCX document
A.2.11.3 Att6BidSchedule.docx DOCX document
A.2.11.3 Att3PPQ.docx DOCX document
01 00 15 Design After Award.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
Construction Signs.pdf PDF
A.2.11.3_Att8BLA.Template.docx DOCX document
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
A.2.11.3 Att5letterofcommit.docx DOCX document
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.2.11.3_Att3PPQ.docx DOCX document
A.2.11.3_Att6BidSchedule.docx DOCX document
01 35 26 Safety and Occupational Health Requirements —
A.2.11.3 Att2expinfosheet.docx DOCX document
A.07.23 W912GB-16-R-0036.pdf PDF
A.2.11.3_Att2expinfosheet.docx DOCX document
A.2.11.3_Att4KeyPersResume.docx DOCX document
A.2.11.3_Att1expovervw.docx DOCX document
A.2.11.3 Att9BLG.Template.doc DOC document
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 78 00 Completion Procedures.pdf PDF
01 32 01.00 15 Project Schedule —
00 73 15 General Conditions —
A.2.11.3 Att4KeyPersResume.docx DOCX document
A.2.11.3 Att8BLA.Template.docx DOCX document
A.2.11.3 Att7AzerbaijanTaxInfo.pdf PDF
01 32 01.00 15 Project Schedule —
A.07.24 SOW Att 3 - Gift Sign.pdf PDF
00 73 15.50 General Conditions —
01 00 15 Design After Award.pdf PDF
01 78 00 Completion Procedures.pdf PDF
A.07.24 SOW Att 2 - Functional Layout.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
02 41 00 Demolition and Deconstruction.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.07.23 W912GB-16-R-0036.pdf PDF
A.07.24 SOW Att 1 - Site Layout.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
Construction Signs.pdf PDF
00 73 15 General Conditions —
01 35 26 Safety and Occupational Health Requirements —
01 78 23 Operation and Maintenance Data.pdf PDF
Show all 50

RFI Amendment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

PROJECT TITLE: IDP School Building PROJECT LOCATION Lachin Chirag Village, Baku, Azerbaijan

SOLICITATION NUMBER: W912GB-16-R-0036

Project Name
Prime
Sub
Joint Venture
Key Subcontractor
Total $ Amount
Project Start Date
Project Completion Date
a) (from list below)
b)
c)
d)

e)

SAMPLE Building Renovation, Base XXX X

X

750
1-Jul-05
1-Jul-05
X
X

X

a) Design-build experience.

b) Demonstrate experience working in any of the European countries with projects performed in Azerbaijan being considered most relevant

c) Demonstrate experience in building schools.

d) Demonstrate experience in electrical and controls work to include transformer installation, buried electrical and control cables, control panels, disconnect switches, grounding protection, etc.

e) Demonstrate experience in minor earthwork, grading, and roadway surface repair

File details come from the government source that posted it. Updated .