A22_02_TL_5-7_Snow_Removal_Railroad_Switch.pdf

PDF 436 KB Posted

Attached to
Roads & Grounds Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES-16-R-0005
Issued by

About this file

TL 5-7

View the file

Other files

File Type Posted
Amendment_6_.pdf PDF
Updated_Schedule__.pdf PDF
Amendment_5_.pdf PDF
Amendment_4_.pdf PDF
Amendment_3_.pdf PDF
01_TE_3-2_GFAE_(6_Jul_16)_.xlsx XLSX spreadsheet
Attachments_1_and_2_.pdf PDF
Amendment_2_.pdf PDF
01_TE_1-3_DSL_RG_(10_Jun_16).xlsx XLSX spreadsheet
02_TL_5-5-1_Annex_A-10_Sparta_FMC_Airport_Operations_Manual.docx DOCX document
Amendment_1_.pdf PDF
A22_02_TL_5-8_Grass_Cutting.pdf PDF
A22_02_TL_5-4_Trails_(4_Apr_16).pdf PDF
A22_Solicitation_Fort_McCoy_R G_.pdf PDF
A22_02_TL_5-5_Excess_Snow_and_Snow_Removal.pdf PDF
A22_02_TL_5-2_Culvert_Dam_Bridge.pdf PDF
A22_01_TE_1-2_PRS_Description_RG_(7_Apr_16).doc DOC document
A22_CBA_R G_Employees.xls XLS spreadsheet
A22_02_TL_1-1_FMC_DPW_RG_GIS_Data_(11_May_16).xlsx XLSX spreadsheet
A22_01_TE_3-1_GFF_RG_(31_Mar_16).docx DOCX document
A22_02_TL_5-3_Unpaved_Roads.pdf PDF
A22_02_TL_5-9_Railroad_Crossing_Clearing_and_Pavement_Sweeping.pdf PDF
A22_02_TL_4-1_State_of_WI_Form_TR-WM-118.pdf PDF
A22_02_TL_5-6_Snow_Removal_Hydrants.pdf PDF
A22_MCC_Form_451.xlsx XLSX spreadsheet
A22_02_TL_5-1_Paved_Roads.pdf PDF
A22_02_TL_5-11_Sediment_Traps.pdf PDF
A22_01_TE_1-3_DSL_RG_(20_May_16).xlsx XLSX spreadsheet
A22_CBA_01_CBA_FMC_2014-2017.pdf PDF
A22_02_TL_5-10_Borrow_Concrete_Rock_Crusher_Wood_Grinding_Sites_(4_Apr_16).pdf PDF
A22_02_TL_4-2_FMC_Tank_Inspection_Form_372.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

NUMBER:

SHEET 3 of 5

D es ig ne d by

Jo hn A da m s D w n by

R C

V

R ev ie w ed b y:

Su bm itt ed b y:

R

EV

-B Y

SU

B

-B Y

FO

RT

M cC

O Y

DI

RE

CT

OR

AT

E

O F

PU

BL

IC

W

OR

KS

S

OU

TH

TH

A

VE

FO

RT

M C

CO

Y, W I 5

P er fo rm an ce

W or k S ta te m en t R ai lro ad In sp ec tio n

P re ve nt iv e M ai nt en an ce S w itc h Lo ca tio ns

D

AT

E M

O D

DPW

FORT MCCOY, WI

Turnout #2

Turnout #1

Turnout #3

Turnout #4

Turnout #5

Turnout #6

Turnout #7 Turnout #8

Turnout #9

Turnout #10

Turnout #11

Turnout #12

Turnout #20 Turnout #19

Turnout #14

Turnout #13

Turnout #17

Turnout #18

Engine House

Engine House 2

Turnout Canadian Pacific Railway

South J Street

St at e H w y

By pa ss R oa d

Rail Road East

TBD

R ai l B ed

R oa d

Rail Road West

So ut h Fi fth A ve

So ut h S ix th

A ve

So ut h Fo ur th

A ve

Am m o S to ra ge P er im et er

So ut h 1s t A ve nu e

Am m o S to ra ge

So ut h 2n d Av en ue

So ut h S ev en th A ve

South F Street

So ut h E ig ht h A ve

South H Street

South M Street

South E Street

South K Street

So ut h Th ird A ve

Rail Dock North

South N inth Ave

South G Street

TB

D

TB

D

TB

D

South M Street

TB

D

TB

D

Rail Dock North

HGFEDCBA

HGFEDCBA

Na me

: S he et3 _S wi tch

Lo ca tio ns

.m xd

Da te:

2/

/20

Pa th

: X :\G is M ap s a nd D oc um en ts\

Pr oje cts \2

2_

Pr oj ec ts\

_R ail ro ad

_I ns

_M an ite na nc e\

M

XD

\S he et 3_

Sw itc hL oc at ion s.m xd

1 i nc h

0 f ee t

Turnout Name Track Switch Location (ft) Orientation Direction Frog Type Frog Size Engine House Main Track 32+68 Facing Point Left Hand Rail Bound Manganese 8 Engine House 2 Main Track 34+66 Facing Point Left Hand Rail Bound Manganese 8 Turnout #01 Lead Track 6+75 Facing Point Left Hand Rail Bound Manganese 10 Turnout #02 Lead Track 25+25 Trailing Point Right Hand Rail Bound Manganese 10 Turnout #03 East Y 15+45 Trailing Point Left Hand Rail Bound Manganese 10 Turnout #04 Main Track 1+21 Facing Point Left Hand Rail Bound Manganese 8 Turnout #05 Track F 1+14 Facing Point Left Hand Rail Bound Manganese 8 Turnout #06 Track F 29+04 Trailing Point Right Hand Rail Bound Manganese 8 Turnout #07 Main Track 31+33 Trailing Point Right Hand Rail Bound Manganese 8 Turnout #08 Main Track 35+80 Facing Point Left Hand Rail Bound Manganese 8 Turnout #09 Main Track 38+11 Facing Point Left Hand Rail Bound Manganese 9 Turnout #10 Track 1 28+40 Trailing Point Right Hand Rail Bound Manganese 8 Turnout #11 Main Track 41+30 Facing Point Left Hand Rail Bound Manganese 8 Turnout #12 Main Track 43+60 Facing Point Left Hand Solid Self Guarded Manganese 8 Turnout #13 Track 2 9+65 Facing Point Right Hand Rail Bound Manganese 10 Turnout #14 Track 3 0+00 Facing Point Right Hand Solid Self Guarded Manganese 8 Turnout #17 Track 7 7+52 Facing Point Left Hand Rail Bound Manganese 8 Turnout #18 Track 7 11+73 Facing Point Left Hand Solid Self Guarded Manganese 8 Turnout #19 Main Track 48+83 Facing Point Left Hand Rail Bound Manganese 9 Turnout #20 Track A 0+00 Facing Point Left Hand Rail Bound Manganese 8

TURNOUTS

donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Highlight donald.s.peterson Typewritten Text Highlights are Heated Switches donald.s.peterson Typewritten Text donald.s.peterson Typewritten Text donald.s.peterson Typewritten Text nathan.j.sobojinski Polygon nathan.j.sobojinski Polygon nathan.j.sobojinski Callout Ensure switch stand and switch rod are clear of snow and ice to ballast rock level.

nathan.j.sobojinski Oval nathan.j.sobojinski Text Box Red is the area required for snow/ice removal. Purple is what the switch heaters can handle.

robin.k.senn Typewritten Text robin.k.senn Typewritten Text robin.k.senn Typewritten Text TL 5-7 Snow Removal Railroad Switch w/Switch Heater robin.k.senn Typewritten Text robin.k.senn Typewritten Text robin.k.senn Typewritten Text robin.k.senn

Text Box Red is the area required for snow/ice removal.

nathan.j.sobojinski Polygon nathan.j.sobojinski Callout Ensure no ice is between the main rail and switch points.

nathan.j.sobojinski Line nathan.j.sobojinski Callout Ensure switch, switch stand, and switch rod are clear of snow and ice to ballast rock level.

robin.k.senn Typewritten Text robin.k.senn

TL 5-7 Snow Removal Railroad Switch w/out Switch Heater

Text Box Red is the area required for snow/ice removal. Purple is what the switch heaters can handle.

nathan.j.sobojinski Polygon nathan.j.sobojinski Polygon nathan.j.sobojinski Callout Ensure switch stand and switch rod are clear of snow and ice to ballast rock level.

02 TL 5-7 Snow Removal Railroad Switch Locations (11 Feb 16)
02 TL 5-7 Snow Removal Railroad Switch Requirement (28 Jan 16)

File details come from the government source that posted it. Updated .