W912ER23R0001 Bulk POL AM 0002 Specifications.pdf

PDF 1 MB Posted

Attached to
W91ER23R0001 Amendment 0007 Bulk POL Storage Facility, Amman Jordan
Solicitation number
W912ER23R0001
Issued by

View the file

Other files

File Type Posted
W912ER-23-R-0001 Bulk POL_AM 0006 Solicitation_Final.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0006_Specifications.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0006_Drawings.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0005_Drawings.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0005 Solicitation_Final.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0005_Specifications.pdf PDF
W912ER-23-R-0001 Bulk POL_AM 0005_Site Photos.pptx PPTX presentation
W912ER23R0001- Bulk POL AMD 0004 Solicitation_Final.pdf PDF
W912ER23R0001 - Bulk POL AMD 0003 Bid Schedule 01062023.pdf PDF
W912ER23R0001- Bulk POL AMD 0003 Solicitation_Final 01062023.pdf PDF
W912ER23R0001 - Bulk POL AMD 003 Cost Breakdown 01062023.pdf PDF
W912ER23R0001 Bulk POL AM 0002 Solicitation_Final.pdf PDF
W912ER23R0001 Bulk POL_AM 0002_Drawings.pdf PDF
W912ER230001 Jordan Bulk POL_AMD 0001 Specs 11.17.22.pdf PDF
W912ER230001 Jordan Bulk POL_AMD 0001 Solicitation_Final.pdf PDF
Jordan POL_CID - FFE_CDC Submittal.pdf PDF
FY23 MSAB Bulk POL - Cost Breakdown.pdf PDF
Vol 2 _Jordan POL_Specifications_CDC.pdf PDF
FY23 MSAB Bulk POL Bid Schedule.pdf PDF
Vol 1 _Jordan POL_Drawings_CDC_HALFSIZE.pdf PDF
W912ER23R0001 Bulk POL - Proposal Schedule and Cost Breakdown.xls XLS spreadsheet
Jordan POL_CID - SID_CDC Submittal.pdf PDF
Vol 3 _Jordan POL_Specifications_CDC.pdf PDF
W912ER23R0001 Bulk POL Storage final.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bulk POL Storage, UD 2.4, Jordan 479505

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/19 SUMMARY OF WORK

01 14 00 10/17 WORK RESTRICTIONS

01 15 00.12 10 10/15 SUPPLEMENTARY REQUIREMENTS

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 23.33 08/18 AVIATION FUEL SYSTEM SPECIFIC

SUBMITTAL REQUIREMENTS

01 35 26 11/15 (June 2020 MED) GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 02/14 METRIC MEASUREMENTS

01 45 00.00 10 02/10 QUALITY CONTROL

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 50 00 08/09 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.12 10 05/20 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19 PROJECT IDENTIFICATION

01 78 00 08/11 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 23.33 08/18 OPERATION AND MAINTENANCE MANUALS FOR

AVIATION FUEL SYSTEMS

01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING

DI VI SI ON 03 - CONCRETE

03 30 00 02/19 CAST-IN-PLACE CONCRETE

03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE

DI VI SI ON 05 - METALS

05 12 00 08/18 STRUCTURAL STEEL

05 30 00 05/15 STEEL DECKS

05 40 00 05/15 COLD-FORMED METAL FRAMING

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17 METAL STAIRS

05 51 33 02/16 METAL LADDERS

05 52 00 02/18 METAL RAILINGS

05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING

VAULTS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/16 ROUGH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11 BITUMINOUS DAMPPROOFING

07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING

07 21 13 02/16 BOARD AND BLOCK INSULATION

07 22 00 02/16 ROOF AND DECK INSULATION

PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment 0002 W912ER23R0001

07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM

07 42 13 05/11 METAL WALL PANELS

07 51 13 05/12 BUILT-UP ASPHALT ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 61 14.00 20 08/16 STEEL STANDING SEAM ROOFING

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 02/10 STEEL DOORS AND FRAMES

08 51 23 08/11 STEEL WINDOWS

08 71 00 02/16 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 05/11 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16 GYPSUM BOARD

09 51 00 08/17 ACOUSTICAL CEILINGS

09 65 00 08/10 RESILIENT FLOORING

09 67 23.16 08/10 FUEL RESISTIVE RESINOUS FLOORING,

5-COAT SYSTEM

09 90 00 05/11 PAINTS AND COATINGS

09 97 13.00 40 11/14 STEEL COATINGS

09 97 13.15 02/15 LOW VOC POLYSULFIDE INTERIOR COATING

OF WELDED STEEL PETROLEUM FUEL TANKS

09 97 13.17 02/10, CHG 1: 08/17 THREE COAT EPOXY INTERIOR COATING OF

WELDED STEEL PETROLEUM FUEL TANKS

09 97 13.27 02/21 HIGH PERFORMANCE COATING FOR STEEL

STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 08/17 EXTERIOR SIGNAGE

10 14 00.20 08/17 INTERIOR SIGNAGE

10 26 00 08/17 WALL AND DOOR PROTECTION

10 28 13 08/17 TOILET ACCESSORIES

10 44 16 05/15 FIRE EXTINGUISHERS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS

EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,

AND EXHAUST SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

23 05 48.19 05/18 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS

23 23 00 10/07 REFRIGERANT PIPING

23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS FIRE, LIFE, SAFETY

25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS UTILITY MONITORING

CONTROL SYSTEM TO INCLUDE PLCS AND UPS

FOR POL FUEL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 11 16 02/10, CHG 2: 11/19 SECONDARY UNIT SUBSTATIONS

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 24 13 05/15 SWITCHBOARDS

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

26 32 15.00 10 10/07 DIESEL-GENERATOR SET STATIONARY

100-2500 KW, WITH AUXILIARIES

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES

26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM

(SACRIFICIAL ANODE)

26 42 17.00 10 11/08 CATHODIC PROTECTION SYSTEM (IMPRESSED

CURRENT)

26 42 19.00 20 04/06 CATHODIC PROTECTION BY IMPRESSED

CURRENT

26 51 00 05/16 INTERIOR LIGHTING

26 56 00 05/13 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 64.00 10 08/09 FIRE DETECTION AND ALARM SYSTEM,

ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 08/08 EARTHWORK

31 05 19 08/08 GEOTEXTILE

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 08/17 AGGREGATE BASE COURSES

PROJECT TABLE OF CONTENTS Page 3

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT

SEALANT

32 16 19 05/18 CONCRETE CURBS AND SIDEWALKS

32 17 23 08/16 PAVEMENT MARKINGS

32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK) AND

GATES

DI VI SI ON 33 - UTI LI TI ES

33 01 50.55 02/21 CLEANING OF PETROLEUM STORAGE TANKS

33 08 53 08/18 AVIATION FUEL DISTRIBUTION SYSTEM

START-UP

33 09 55 08/18 AVIATION FUEL PUMP CONTROL AND

ANNUNCIATION SYSTEM (CUT AND COVER

TANKS)

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 32 17 02/11 REMOTE CONTAINMENT BASINS

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 52 23.15 11/18 POL SERVICE PIPING WELDING

33 52 43.11 08/18 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.12 08/18 AVIATION FUEL PANTOGRAPHS

33 52 43.13 08/18 AVIATION FUEL PIPING

33 52 43.14 08/18 AVIATION FUEL CONTROL VALVES

33 52 43.23 08/18 AVIATION FUEL PUMPS

33 52 43.28 08/18 FILTER SEPARATOR, AVIATION FUELING

SYSTEM

33 52 80 02/10 LIQUID FUELS PIPELINE COATING SYSTEMS

33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS

33 56 21.17 11/18 SINGLE WALL ABOVEGROUND FIXED ROOF

STEEL POL STORAGE TANK

33 57 55 11/18 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

33 58 00 04/08 LEAK DETECTION FOR FUELING SYSTEMS

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 99 PAGES

Bulk POL Storage, UD 2.4, Jordan

01 14 00 SD-01 Preconstruction Submittals

1.4.9 G M/RPersonnel and Vehicular Access

Plan

1.4.1.1 G M/RList of Contact Personnel

SD-03 Product Data

1.4.10.2 G MRadio Specifications

01 15 00.12 10 SD-01 Preconstruction Submittals

1.2 G M/RProof of Degrees and Licensing

1.3.1 G M/RSite Security Plan

1.3.2.2 G M/ROperational Safety Plan

1.5.2 G M/RRequests for Digging Permits

1.7 G M/RProposed Means of Providing

Project Security

1.19.2 G M/RRequests for Hot Work Permits

1.20.2 G M/RShipping Documents

1.21 G M/RForeign Objects Damage Control

SD-07 Certificates

1.8Certificates Of Compliance

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 G M/RSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 99 PAGES

01 35 26 1.7 G MAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.3 G MAccident Reports

1.12.2 G MEpidemic/Pandemic Reporting

1.12.4LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G MStandard Lift Plan

1.7.2.3 G MCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.5Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G M/RContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 G M/RConstruction Site Plan

01 57 19.12 10 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.8 G M/REnvironmental Protection Plan

1.4.1 G M/REmployee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 99 PAGES

01 57 19.12 10 SD-06 Test Reports

3.2.1.1Inspection Reports

1.7.1 G M/RSolid Waste Management Report

SD-07 Certificates

1.4.1 G REmployee Training Records

1.4.1 G RECATTS Certificate Of

Completion

1.5.5Certificate of Competency

1.5.5Erosion and Sediment Control

Inspector Qualifications

SD-11 Closeout Submittals

3.2.1.2 G M/RStormwater Pollution Prevention

Plan Compliance Notebook

3.7.1 G M/RWaste Determination

Documentation;

3.7.3.6 G RDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G RAssembled Employee Training

Records

1.7.1 G RSolid Waste Management Report

3.8.1 G RContractor Hazardous Material

Inventory Log

3.7.3.1 G RHazardous Waste/Debris

Management

1.5.2 G RRegulatory Notifications

3.7.2.1 G RSales Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 99 PAGES

01 57 19.12 10 3.7.2.1Contractor Certification

3.2.1.3As-Built Topographic Survey

01 58 00 SD-02 Shop Drawings

1.3.1 G MSign Legend Orders

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.4Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.8 G ROperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G M/RAs-Built Schedule

3.2 G M/RAs-Built Drawings

3.3.1 G M/RRecord Drawings

3.4 G M/RRecord Drawings

3.7 G M/RAs-Built Record of Equipment

and Materials

3.5 G M/RFinal Approved Shop Drawings

3.6 G M/RConstruction Contract

Specifications

3.10 G MInterim Dd Form 1354

3.10 G MChecklist For Dd Form 1354

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 99 PAGES

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G M/RO&M Database

3.1.1 G M/RTraining Plan

3.1.3 G M/RTraining Outline

3.1.2 G M/RTraining Content

SD-11 Closeout Submittals

3.1.4 G M/RTraining Video Recording

3.1.6 G M/RValidation of Training Completion

01 78 23.33 SD-10 Operation and Maintenance

Data

2.1.1 G RSystem Instructions

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G M/RCommissioning Firm

1.7.1 G M/RLead Commissioning Specialist

1.7.2 G M/RTechnical Commissioning

Specialists

SD-06 Test Reports

3.2 G MDesign Review Report

3.1.2.1 G MInterim Construction Phase

Commissioning Plan

3.1.2.2 G MFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G MTemplate Building Envelope

Inspection Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 99 PAGES

01 91 00.15 10 3.1.4.2 G MBuilding Envelope Inspection

Checklists

3.1.4.3 G MPre-Functional Checklists

1.8 G MIssues Log

3.2 G MCommissioning Report

3.3.1 G MPost-Construction Trend Log

Report

SD-07 Certificates

1.9Certificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 G RTraining Plan

3.1.5 G RTraining Attendance Rosters

3.1.6 G MSystems Manual

3.1.7 G RMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2 G M/RFinal Commissioning Report

3.1.2.2 G M/RFinal Construction Phase

Commissioning Plan

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1 G M/RConcrete Curing Plan

1.6.5 G M/RQuality Control Plan

1.6.6 G M/RQuality Control Personnel

Certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 99 PAGES

03 30 00 1.6.6 G M/RQuality Control Organizational

Chart

1.6.8 G M/RLaboratory Accreditation

1.6.2.1 G M/RForm Removal Schedule

3.3.9 G M/RMaturity Method Data

SD-02 Shop Drawings

1.6.2.1 G MFormwork

1.6.2.2 G MReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.6Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 99 PAGES

03 30 00 SD-05 Design Data

1.6.1.2 G MConcrete Mix Design

1.6.1.1 G MFormwork Calculations

SD-06 Test Reports

1.6.1.2 G MConcrete Mix Design

1.6.4.1 G MAggregates

3.13.2.3 G MCompressive Strength Tests

3.13.2.4 G MAir Content

3.13.2.1 G MSlump Tests

2.3.2 G MWater

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compounds

03 45 00 SD-01 Preconstruction Submittals

1.11.5 G M/RPre-Installation Meeting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 99 PAGES

03 45 00 SD-02 Shop Drawings

1.11.1 G MPrecast Drawings

SD-03 Product Data

2.3Cast-In Embedded Items And

Connectors

2.3.2Connection Devices

2.2.4Admixtures

2.5Gasket

2.7Bearing Pads

SD-04 Samples

1.11.2 G RConcrete Wall Panel Surface

Finish

1.11.4 G RMock-up

2.4.1 G RForm Liner

1.11.2 G RFull Size Sample Wall Panel

SD-05 Design Data

1.5.4 G MDesign Calculations

2.1.1 G MContractor-Furnished Mix Design

2.4.9 G MRepair of Surface Defects

1.5.5 G MThermal Calculations

SD-06 Test Reports

1.10.2 G MStrength Tests

1.10.2 G MSlump

1.10.2 G MAir Content

1.10.1 G MTest for Concrete Materials

2.2.5 G MWater

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 99 PAGES

03 45 00 3.6.4 G MTesting Precast Units for Strength

SD-07 Certificates

1.4Manufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

SD-08 Manufacturer’s Instructions

3.3Installation

3.8Cleaning

SD-11 Closeout Submittals

1.11.3 G M/RBatch Ticket Information

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G M/RErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G MFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

2.2.1Recycled Content for Structural

Steel

2.2.2Recycled Content for Structural

Steel Tubing

2.2.3Recycled Content for Steel Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 99 PAGES

05 12 00 SD-05 Design Data

1.4.3 G MDesign Calculations for Steel

Connections

1.4.2 G MShoring and Temporary Bracing

SD-06 Test Reports

2.3 G MBolts, Nuts, and Washers

3.7.1.2 G MWeld Inspection Reports

3.7.2.1 G MDirect Tension Indicator Washer

Inspection Reports

3.7.3.1 G MBolt Testing Reports

3.7.4 G MEmbrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 99 PAGES

05 30 00 SD-02 Shop Drawings

1.3.3 G MFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

3.2.4.1Galvanizing Repair Paint

2.2.12Mechanical Fasteners

SD-04 Samples

2.1.1 G RMetal Roof Deck Units

2.2.3 G RFlexible Closure Strips

SD-05 Design Data

2.1 G MDeck Units

SD-07 Certificates

1.3.2.1Fire Safety

1.3.2.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 G MFraming Components

SD-03 Product Data

2.1Studs

2.1Recycled Content of Steel

Products

SD-05 Design Data

1.6.2 G MMetal Framing Calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 99 PAGES

05 40 00 1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.7 G MFloor Gratings

2.8 G MBollards/Pipe Guards

2.10 G MRoof Hatches

SD-03 Product Data

2.4Corner Guards

2.7Floor Gratings

2.10Roof Hatches

2.1Recycled Content

SD-07 Certificates

2.1Certificates of Compliance

2.2Certified Mill

05 51 00 SD-02 Shop Drawings

2.1 G MIron and Steel Hardware

2.1 G MSteel Shapes, Plates, Bars, and

Strips

2.2.1 G MMetal Stair System

SD-03 Product Data

2.4.1Structural-Steel Plates, Shapes, and Bars

2.4.3Hot-Rolled Carbon Steel Sheets and Strips

2.4.2Hot-Rolled Carbon Steel Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 99 PAGES

05 51 00 2.3.2Concrete Inserts

2.2.3Protective Coating

2.3.1Steel Stairs

SD-05 Design Data

1.3.5 G MMetal Stair Calculations

SD-07 Certificates

1.3.1Welding Procedures

1.3.1Welder Qualification

SD-08 Manufacturer’s Instructions

2.2.3Protective Coating

05 51 33 SD-02 Shop Drawings

2.3 G MLadders

SD-03 Product Data

2.3Ladders

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G MFabrication Drawings

3.2 G MIron and Steel Hardware

3.2 G MSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1Structural-Steel Plates, Shapes, and Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 99 PAGES

05 52 00 2.2.2Hot-Rolled Carbon Steel Bars

2.2.4Concrete Inserts

2.2.6Steel Railings and Handrails

1.2.1Anchorage and Fastening

Systems

SD-07 Certificates

1.4.1Welding Procedures

1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 59 10 SD-01 Preconstruction Submittals

2.6.2 G M/RAssembly Tests

3.3 G M/RAcceptance Testing

SD-02 Shop Drawings

1.4.3 G MDetail Drawings

SD-03 Product Data

2.1.7Wheel Assemblies

1.4.3Materials List

2.4Welding

2.4.2Welding of Aluminum

2.4.4Steel Welding Repairs

SD-07 Certificates

1.4.1Welder Qualifications

2.4.2Welding of Aluminum

06 10 00 SD-02 Shop Drawings

1.7 G MBlocking

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 99 PAGES

06 10 00 SD-06 Test Reports

1.4.2 G MPreservative-treated

SD-07 Certificates

1.8.1Certificates of Grade

2.1.1Certified Sustainably Harvested

Virgin Lumber

1.7Preservative Treatment

2.2.2Indoor Air Quality for Non-aerosol

Adhesives

SD-10 Operation and Maintenance

Data

3.3 G RTake-back Program

06 41 16.00 10 SD-02 Shop Drawings

2.6 G MShop Drawings

3.1 G MInstallation

SD-03 Product Data

2.1Wood Materials

1.5.2Certification

SD-04 Samples

2.2 G RPlastic Laminates

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

07 05 23 SD-01 Preconstruction Submittals

1.4 G M/RWork Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 99 PAGES

07 05 23 2.2Thermal Imaging Camera

SD-05 Design Data

3.2 G MEnvelope Surface Area

Calculations

SD-06 Test Reports

3.5 G MPressure Test Procedures

1.6.4 G MAir Leakage Test Report

3.5.6 G MAir Leakage Test Report

1.6.4 G MDiagnostic Test Report

3.6.5 G MDiagnostic Test Report

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

07 11 13 SD-07 Certificates

1.3Materials

07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details

2.2Elastomeric Waterproofing Sheet

Material

2.4Protection Board

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 99 PAGES

07 13 53 2.2 G MElastomeric Waterproofing Sheet

Material

3.6 G MField Quality Control

3.7 G MProtective Covering

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

1.4Protective Coverings

1.8Special Warranties

1.8Special Warranties

2.1.1Certificates Of Compliance

2.1.2Certificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4Primers, Adhesives, and Mastics

2.2Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1 G M/RCertificates Of Compliance

2.1.2 G M/RCertificates Of Compliance

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.1Block or Board Insulation

2.2Pressure Sensitive Tape

2.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 99 PAGES

07 21 13 2.1.4Recycled Content for Block or

Board Insulation

SD-07 Certificates

2.1Block or Board Insulation

1.8Special Warranties

1.8Special Warranties

2.1.5Indoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.3.1Adhesive

07 22 00 SD-02 Shop Drawings

1.3 G MInsulation Board Layout

1.3 G MVerification of Existing Conditions

SD-03 Product Data

2.1Insulation

1.4Cover Board

2.4Fasteners

2.3Moisture Control

2.3.1.1Asphalt

2.1.2Recycled Content For Insulation

SD-06 Test Reports

1.7.1 G MFlame Spread Rating

SD-07 Certificates

1.6Installer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 99 PAGES

07 22 00 1.6Certificates Of Compliance For

Felt Materials

2.1.3Indoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.4Fasteners

2.1Insulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 G MAir Barrier System Shop

Drawings

SD-03 Product Data

2.1Air Barrier System Product Data

SD-04 Samples

3.1.2 G RMock-Up

2.1 G RMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 G MDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 G MDesign Review Report

3.1.3 G MTesting and Inspection

SD-07 Certificates

1.7Air Barrier Inspector

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G M/RQualification of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 99 PAGES

07 42 13 1.5.4 G M/RQualification of Installation

Contractor

1.8 G M/RWarranty

SD-02 Shop Drawings

1.5.1.1 G MInstallation Drawings

SD-03 Product Data

2.2.1Wall Panels

2.2.2Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

2.7Aluminized Steel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

2.2.1 G RWall Panels

1.5.3.1 G RFasteners

2.5.3 G RMetal Closure Strips

2.2.2.5 G RColor chart

SD-05 Design Data

1.5.1.2 G MWind load design analysis

SD-06 Test Reports

3.7.2 G MLeakage Tests

1.3.2 G MWind Load Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 99 PAGES

07 42 13 2.2.2.6 G MCoating

2.2.2.6 G MChalking

1.3.2 G MSeismic Tests

SD-07 Certificates

1.5.3.1Coil Stock

1.5.3.1Fasteners

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3Installation

SD-09 Manufacturer’s Field

Reports

3.8.1Manufacturer's Field Reports

SD-11 Closeout Submittals

1.8 G M/RWarranty

1.5.6 G M/RMaintenance Instructions

1.8.1 G M/R20 year 'No Dollar Limit' warranty

for labor and material

07 51 13 SD-03 Product Data

1.4.3Wind Uplift Calculations

2.4Asphalt

3.3.3Felts

3.3.3Felts

2.5.1Granule Surface Modified

Bitumen Cap Sheet

2.3Flashing Membrane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 99 PAGES

07 51 13 2.10Fasteners

2.6Primer

2.7Asphalt Roof Cement

2.12Walkpad Materials

2.8Cant Strips

2.11Pre-Manufactured Accessories

2.11Pre-Manufactured Accessories

1.8Warranties

SD-06 Test Reports

3.5.3 G MSamples of Built-Up Roofing

SD-07 Certificates

1.5.1Bill of Lading

1.4.1Qualifications of Applicator

SD-08 Manufacturer’s Instructions

3.3.3Felts

3.3.3Felts

3.5.2Flashings

3.3.6Modified Bitumen Cap Sheet

2.4Asphalt

2.6Primer

3.2.1.2Roof Cement

2.10Fasteners

SD-11 Closeout Submittals

1.8 G M/RWarranty

3.6 G M/RInformation Card

07 60 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 99 PAGES

07 60 00 2.2.1 G MExposed Sheet Metal

3.1.16 G MGutters

3.1.17 G MDownspouts

3.1.22Expansion Joints

2.2.1 G MGravel Stops and fascia

3.1.18 G MSplash Pans

3.1.10 G MBase Flashing

3.1.11 G MCounter-flashing

3.1.23 G MFlashing at Roof Penetrations

and Equipment Supports

2.2.6 G MReglets

3.1.15 G MDrip Edges

3.1.19 G MOpen Valley Flashing

3.1.20 G MEave Flashing

2.1 G MRecycled Content

SD-04 Samples

1.4.2 G RFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

3.5Quality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 G RCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.2 G MRoofing

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 99 PAGES

07 61 14.00 20 2.1Roofing Panels

2.1Energy Star Label for Steel

Roofing Product

2.1.1Recycled Content for Steel

Roofing Product

2.3Attachment Clips

2.4.1Closures

2.4Accessories

2.4.2Fasteners

2.4.3Sealants

1.7Warranty

SD-04 Samples

2.1 G RPanel

2.4 G RAccessories

2.4.3 G RSealants

2.2 G RIntermediate Support

SD-05 Design Data

1.5 G MDesign Calculations

SD-06 Test Reports

3.6 G MField Inspection

1.3.3 G MStructural Performance

1.6.6 G MFinish

SD-07 Certificates

1.6.3Manufacturer's Technical

Representative

1.6.4Installer's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 99 PAGES

07 61 14.00 20 2.1Coil Stock

SD-08 Manufacturer’s Instructions

3.3Installation

SD-11 Closeout Submittals

3.8 G M/RInformation Card

1.7 G M/RWarranty

07 84 00 SD-02 Shop Drawings

2.1 G MFirestopping System

SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3 G MInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond Breakers

2.4Backstops

SD-06 Test Reports

3.1 G MField Adhesion

SD-07 Certificates

2.1.1Indoor Air Quality For Interior

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 99 PAGES

07 92 00 2.1.3Indoor Air Quality For Interior

Floor Joint Sealants

2.5Indoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.2 G MDoors

2.2 G MRecycled Content for Steel Door

Product

2.7 G MFrames

2.7 G MRecycled Content for Steel Frame

Product

2.5 G MAccessories

2.8 G MWeatherstripping

SD-03 Product Data

2.2Doors

2.7Frames

2.5Accessories

08 51 23 SD-02 Shop Drawings

2.2 G MWindows

SD-03 Product Data

2.1.1Steel Framing Materials

2.1.1Recycled Content for Steel

Framing Materials

2.6.2Fasteners

2.2Accessories

2.6Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 99 PAGES

08 51 23 SD-04 Samples

2.7.2 G RColor Coating

SD-06 Test Reports

1.3.1 G MAir Infiltration

1.3.1 G MWater Infiltration

1.3.2 G MMullion and Transom Bar Wind

Load

SD-10 Operation and Maintenance

Data

2.2 G RWindows

08 71 00 SD-02 Shop Drawings

1.3 G MManufacturer's Detail Drawings

1.3 G MVerification of Existing Conditions

1.5 G MHardware Schedule

2.3.6 G MKeying System

SD-03 Product Data

2.3Hardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G RHardware Schedule

SD-11 Closeout Submittals

1.6.1 G M/RKey Bitting

08 81 00 SD-03 Product Data

1.4Insulating Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 99 PAGES

08 81 00 1.3Glazing Accessories

2.2.2.1Sealants

2.2.3Joint Backer

SD-04 Samples

1.4 G RInsulating Glass

2.2.1 G RGlazing Compound

2.2.4.1 G RTape

2.2.2.1 G RSealing Tapes

SD-07 Certificates

1.4Insulating Glass

SD-08 Manufacturer’s Instructions

2.2Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1 G M/RInsulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4 G MWall louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 G RWall louvers

09 22 00 SD-02 Shop Drawings

2.1 G MMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 99 PAGES

09 22 00 2.1Recycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.7Accessories

2.1.1Gypsum Board

2.1.1Recycled Content for Gypsum

Board

2.1.1Recycled Content for Paper

Facing and Gypsum Cores

2.1.4VOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1Indoor Air Quality for Gypsum

Board

09 51 00 SD-02 Shop Drawings

2.1 G MApproved Detail Drawings

SD-03 Product Data

1.9Acoustical Ceiling Systems

2.2.1.1Recycled Content for Type III

Ceiling Tiles

2.2.1.1Recycled Content for Type IV

Ceiling Tiles

2.3Recycled Content for Suspension

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 99 PAGES

09 51 00 SD-04 Samples

2.2 G RAcoustical Units

2.2.1.1 G RAcoustical Ceiling Tiles

SD-06 Test Reports

2.1.1 G MCeiling Attenuation Class and

Test

SD-07 Certificates

2.2.1.1Indoor Air Quality for Type III

Ceiling Tiles

2.2.1.1Indoor Air Quality for Type IV

Ceiling Tiles

2.2.1.1Indoor Air Quality for Type X

Ceiling Tiles

1.3.1.2Adhesives

2.8Indoor Air Quality for Sealants

09 65 00 SD-02 Shop Drawings

2.7 G MResilient Flooring and

Accessories

SD-03 Product Data

2.7Resilient Flooring and

Accessories

2.3Adhesives

SD-04 Samples

2.7 G RResilient Flooring and

Accessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 99 PAGES

09 65 00 3.3 G MMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1Indoor Air Quality for Wall Base

2.3Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.7 G RResilient Flooring and

Accessories

09 67 23.16 SD-04 Samples

1.3.1.1 G RJoint Sealant

1.3.2.3 G RJoint Sealant

1.3.1.2 G REpoxy Mortar Flooring System

1.3.2.4 G REpoxy Mortar Flooring System

1.3.3.2 G REpoxy Mortar Flooring System

2.3 G RWhite Aluminum Oxide Non-Skid

Grit

SD-06 Test Reports

1.3.1.1 G MJoint Sealant

1.3.2.3 G MJoint Sealant

1.3.1.2 G MEpoxy Mortar Flooring System

1.3.2.4 G MEpoxy Mortar Flooring System

1.3.3.2 G MEpoxy Mortar Flooring System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 99 PAGES

09 67 23.16 1.3.1.3 G MPrimer

1.3.1.4 G MGrout Coat

1.3.1.5 G MUrethane Topcoat

2.3 G MWhite Aluminum Oxide Non-Skid

Grit

1.7 G MPatch Test Demonstration

1.3.1.6 G MDaily Inspection Report

3.10.3 G MAdhesion Testing

SD-07 Certificates

1.3.2.1Work Plan

1.3.2.2Flooring System Applicator

Qualifications

1.3.1.1Joint Sealant

1.3.2.3Joint Sealant

1.3.1.2Epoxy Mortar Flooring System

1.3.2.4Epoxy Mortar Flooring System

1.3.3.2Epoxy Mortar Flooring System

1.3.2.5Warranty

SD-08 Manufacturer’s Instructions

1.3.1.1Joint Sealant

1.3.2.3Joint Sealant

1.3.1.2Epoxy Mortar Flooring System

1.3.2.4Epoxy Mortar Flooring System

1.3.3.2Epoxy Mortar Flooring System

1.3.3.3Water-Based Alkaline Degreaser

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 99 PAGES

09 67 23.16 3.10.2.2 G M/RInspection Logbook

09 90 00 SD-02 Shop Drawings

3.11 G MPiping Identification

SD-03 Product Data

2.1Coating

3.2.5Sealant

SD-04 Samples

1.10 G RColor

1.5.2 G RTextured Wall Coating System

1.5.3 G RSample Textured Wall Coating

System Mock-Up

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2Qualification Testing

2.1Indoor Air Quality for Paints and

Primers

2.1Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.7.2Mixing

1.8.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 G RCoatings

09 97 13.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 99 PAGES

09 97 13.00 40 Part 2 G M/RMaterial, Equipment, and Fixture

Lists

1.3 G M/RSafety Plan

SD-03 Product Data

2.1.1Abrasive Blasting Material

2.1.2Sealant Compound

2.1.3.1Inorganic Zinc

2.1.3.1Inhibitive Polyamide Epoxy

2.1.3.1Aliphatic Polyurethane

SD-04 Samples

1.3 G RManufacturer's Standard Color

Charts

3.3.2 G RInspection Forms

SD-05 Design Data

2.1.3 G MMix Designs

2.1.3.1 G MInorganic Zinc

2.1.3.1 G MInhibitive Polyamide Epoxy

2.1.3.1 G MAliphatic Polyurethane

SD-06 Test Reports

3.3.1 G MInspection Reports

2.1.3 G MTest Reports

SD-07 Certificates

2.1.1Abrasive Blasting Material

2.1.2Sealant Compound

3.2.1Inorganic Zinc Coating

2.1.3.1Inhibitive Polyamide Epoxy

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 99 PAGES

09 97 13.00 40 2.1.3.1Aliphatic Polyurethane

SD-08 Manufacturer’s Instructions

2.1.3Protective Coatings

SD-11 Closeout Submittals

1.5 G M/RWarranty

09 97 13.15 SD-05 Design Data

1.4.4.1 G MEnvironmental Control System

1.4.4.2 G MUse of Door Sheet Access Way

SD-06 Test Reports

1.4.5.1 G MCoatings Qualification Inspection

Reports

1.4.5.4 G MNon-metallic Abrasive

Qualification Test Reports

1.4.5.2 G MMetallic Abrasive Qualification

Test Reports

3.1.3 G MCoating Sample Test Reports

3.1.4 G MAbrasive Sample Test Reports

3.9.2.2 G MInspection Report Forms

3.9.2.3 G MDaily Inspection Reports

1.4.5.3 G MRecycled Metallic Abrasive Field

Test Reports (Daily and Weekly)

SD-07 Certificates

1.4.1Contract Errors, Omissions, and

Other Discrepancies

1.4.2.1Corrective Action Procedures

1.4.2.2Implement Corrective Action

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 99 PAGES

09 97 13.15 1.4.3Coating Work Plan

1.4.6.13Coating Materials

1.4.6.14Non-metallic Abrasive

1.4.6.15Metallic Abrasive

1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH)

1.4.6.5Qualifications of Individuals

Performing Abrasive Blasting

1.4.6.6Qualifications of Individuals

Applying Coatings

1.4.6.7Qualifications of Individuals

Operating Plural Component

Equipment

1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating

Inspection Company

1.4.6.4Qualifications of QC Specialist

Coating Inspector

1.4.6.8Qualifications of Testing

Laboratory for Coatings

1.4.6.9Qualifications of Testing

Laboratory for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .