Bulk POL Storage, UD 2.4, Jordan 479505
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/19 SUMMARY OF WORK
01 14 00 10/17 WORK RESTRICTIONS
01 15 00.12 10 10/15 SUPPLEMENTARY REQUIREMENTS
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 23.33 08/18 AVIATION FUEL SYSTEM SPECIFIC
SUBMITTAL REQUIREMENTS
01 35 26 11/15 (June 2020 MED) GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 10 02/10 QUALITY CONTROL
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 50 00 08/09 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.12 10 05/20 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19 PROJECT IDENTIFICATION
01 78 00 08/11 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 78 23.33 08/18 OPERATION AND MAINTENANCE MANUALS FOR
AVIATION FUEL SYSTEMS
01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE
DIVISION 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING
VAULTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11 BITUMINOUS DAMPPROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
PROJECT TABLE OF CONTENTS Page 1
W912ER23R0001-0001
Dated 17 NOV,2022
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 42 13 05/11 METAL WALL PANELS
07 51 13 05/12 BUILT-UP ASPHALT ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 61 14.00 20 08/16 STEEL STANDING SEAM ROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 51 23 08/11 STEEL WINDOWS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 05/11 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 51 00 08/17 ACOUSTICAL CEILINGS
09 65 00 08/10 RESILIENT FLOORING
09 67 23.16 08/10 FUEL RESISTIVE RESINOUS FLOORING,
5-COAT SYSTEM
09 90 00 05/11 PAINTS AND COATINGS
09 97 13.00 40 11/14 STEEL COATINGS
09 97 13.15 02/15 LOW VOC POLYSULFIDE INTERIOR COATING
OF WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.17 02/10, CHG 1: 08/17 THREE COAT EPOXY INTERIOR COATING OF
WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.27 02/21 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/17 INTERIOR SIGNAGE
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 05/15 FIRE EXTINGUISHERS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS
EQUIPMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
W912ER23R0001
23 05 48.19 05/18 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS
23 23 00 10/07 REFRIGERANT PIPING
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE, LIFE, SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY MONITORING
CONTROL SYSTEM TO INCLUDE PLCS AND UPS
FOR POL FUEL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 11 16 02/10, CHG 2: 11/19 SECONDARY UNIT SUBSTATIONS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15 SWITCHBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 32 15.00 10 10/07 DIESEL-GENERATOR SET STATIONARY
100-2500 KW, WITH AUXILIARIES
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM
(SACRIFICIAL ANODE)
26 42 17.00 10 11/08 CATHODIC PROTECTION SYSTEM (IMPRESSED
CURRENT)
26 42 19.00 20 04/06 CATHODIC PROTECTION BY IMPRESSED
CURRENT
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 64.00 10 08/09 FIRE DETECTION AND ALARM SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
31 05 19 08/08 GEOTEXTILE
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 08/17 AGGREGATE BASE COURSES
PROJECT TABLE OF CONTENTS Page 3
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 16 19 05/18 CONCRETE CURBS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK) AND
GATES
DI VI SI ON 33 - UTI LI TI ES
33 08 53 08/18 AVIATION FUEL DISTRIBUTION SYSTEM
START-UP
33 09 55 08/18 AVIATION FUEL PUMP CONTROL AND
ANNUNCIATION SYSTEM (CUT AND COVER
TANKS)
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 32 17 02/11 REMOTE CONTAINMENT BASINS
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 52 43.11 08/18 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.12 08/18 AVIATION FUEL PANTOGRAPHS
33 52 43.13 08/18 AVIATION FUEL PIPING
33 52 43.14 08/18 AVIATION FUEL CONTROL VALVES
33 52 43.23 08/18 AVIATION FUEL PUMPS
33 52 43.28 08/18 FILTER SEPARATOR, AVIATION FUELING
SYSTEM
33 52 80 02/10 LIQUID FUELS PIPELINE COATING SYSTEMS
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 56 21.17 11/18 SINGLE WALL ABOVEGROUND FIXED ROOF
STEEL POL STORAGE TANK
33 57 55 11/18 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 58 00 04/08 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 98 PAGES
Bulk POL Storage, UD 2.4, Jordan
01 14 00 SD-01 Preconstruction Submittals
1.4.9 G M/RPersonnel and Vehicular Access
Plan
1.4.1.1 G M/RList of Contact Personnel
SD-03 Product Data
1.4.10.2 G MRadio Specifications
01 15 00.12 10 SD-01 Preconstruction Submittals
1.2 G M/RProof of Degrees and Licensing
1.3.1 G M/RSite Security Plan
1.3.2.2 G M/ROperational Safety Plan
1.5.2 G M/RRequests for Digging Permits
1.7 G M/RProposed Means of Providing
Project Security
1.19.2 G M/RRequests for Hot Work Permits
1.20.2 G M/RShipping Documents
1.21 G M/RForeign Objects Damage Control
SD-07 Certificates
1.8Certificates Of Compliance
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.9 G M/RSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 98 PAGES
01 35 26 1.7 G MAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.3 G MAccident Reports
1.12.2 G MEpidemic/Pandemic Reporting
1.12.4LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G MStandard Lift Plan
1.7.2.3 G MCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.5Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G M/RContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 G M/RConstruction Site Plan
01 57 19.12 10 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.8 G M/REnvironmental Protection Plan
1.4.1 G M/REmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 98 PAGES
01 57 19.12 10 SD-06 Test Reports
3.2.1.1Inspection Reports
1.7.1 G M/RSolid Waste Management Report
SD-07 Certificates
1.4.1 G REmployee Training Records
1.4.1 G RECATTS Certificate Of
Completion
1.5.5Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector Qualifications
SD-11 Closeout Submittals
3.2.1.2 G M/RStormwater Pollution Prevention
Plan Compliance Notebook
3.7.1 G M/RWaste Determination
Documentation;
3.7.3.6 G RDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G RAssembled Employee Training
Records
1.7.1 G RSolid Waste Management Report
3.8.1 G RContractor Hazardous Material
Inventory Log
3.7.3.1 G RHazardous Waste/Debris
Management
1.5.2 G RRegulatory Notifications
3.7.2.1 G RSales Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 98 PAGES
01 57 19.12 10 3.7.2.1Contractor Certification
3.2.1.3As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.3.1 G MSign Legend Orders
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.8 G ROperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G M/RAs-Built Schedule
3.2 G M/RAs-Built Drawings
3.3.1 G M/RRecord Drawings
3.4 G M/RRecord Drawings
3.7 G M/RAs-Built Record of Equipment
and Materials
3.5 G M/RFinal Approved Shop Drawings
3.6 G M/RConstruction Contract
Specifications
3.10 G MInterim Dd Form 1354
3.10 G MChecklist For Dd Form 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 98 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.3 G M/RO&M Database
3.1.1 G M/RTraining Plan
3.1.3 G M/RTraining Outline
3.1.2 G M/RTraining Content
SD-11 Closeout Submittals
3.1.4 G M/RTraining Video Recording
3.1.6 G M/RValidation of Training Completion
01 78 23.33 SD-10 Operation and Maintenance
Data
2.1.1 G RSystem Instructions
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 G M/RCommissioning Firm
1.7.1 G M/RLead Commissioning Specialist
1.7.2 G M/RTechnical Commissioning
Specialists
SD-06 Test Reports
3.2 G MDesign Review Report
3.1.2.1 G MInterim Construction Phase
Commissioning Plan
3.1.2.2 G MFinal Construction Phase
Commissioning Plan
3.1.2.1.2 G MTemplate Building Envelope
Inspection Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 98 PAGES
01 91 00.15 10 3.1.4.2 G MBuilding Envelope Inspection
Checklists
3.1.4.3 G MPre-Functional Checklists
1.8 G MIssues Log
3.2 G MCommissioning Report
3.3.1 G MPost-Construction Trend Log
Report
SD-07 Certificates
1.9Certificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.5 G RTraining Plan
3.1.5 G RTraining Attendance Rosters
3.1.6 G MSystems Manual
3.1.7 G RMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2 G M/RFinal Commissioning Report
3.1.2.2 G M/RFinal Construction Phase
Commissioning Plan
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1 G M/RConcrete Curing Plan
1.6.5 G M/RQuality Control Plan
1.6.6 G M/RQuality Control Personnel
Certifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 98 PAGES
03 30 00 1.6.6 G M/RQuality Control Organizational
Chart
1.6.8 G M/RLaboratory Accreditation
1.6.2.1 G M/RForm Removal Schedule
3.3.9 G M/RMaturity Method Data
SD-02 Shop Drawings
1.6.2.1 G MFormwork
1.6.2.2 G MReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 98 PAGES
03 30 00 SD-05 Design Data
1.6.1.2 G MConcrete Mix Design
1.6.1.1 G MFormwork Calculations
SD-06 Test Reports
1.6.1.2 G MConcrete Mix Design
1.6.4.1 G MAggregates
3.13.2.3 G MCompressive Strength Tests
3.13.2.4 G MAir Content
3.13.2.1 G MSlump Tests
2.3.2 G MWater
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compounds
03 45 00 SD-01 Preconstruction Submittals
1.11.5 G M/RPre-Installation Meeting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 98 PAGES
03 45 00 SD-02 Shop Drawings
1.11.1 G MPrecast Drawings
SD-03 Product Data
2.3Cast-In Embedded Items And
Connectors
2.3.2Connection Devices
2.2.4Admixtures
2.5Gasket
2.7Bearing Pads
SD-04 Samples
1.11.2 G RConcrete Wall Panel Surface
Finish
1.11.4 G RMock-up
2.4.1 G RForm Liner
1.11.2 G RFull Size Sample Wall Panel
SD-05 Design Data
1.5.4 G MDesign Calculations
2.1.1 G MContractor-Furnished Mix Design
2.4.9 G MRepair of Surface Defects
1.5.5 G MThermal Calculations
SD-06 Test Reports
1.10.2 G MStrength Tests
1.10.2 G MSlump
1.10.2 G MAir Content
1.10.1 G MTest for Concrete Materials
2.2.5 G MWater
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 98 PAGES
03 45 00 3.6.4 G MTesting Precast Units for Strength
SD-07 Certificates
1.4Manufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3Installation
3.8Cleaning
SD-11 Closeout Submittals
1.11.3 G M/RBatch Ticket Information
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G M/RErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G MFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.1.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
2.2.1Recycled Content for Structural
Steel
2.2.2Recycled Content for Structural
Steel Tubing
2.2.3Recycled Content for Steel Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 98 PAGES
05 12 00 SD-05 Design Data
1.4.3 G MDesign Calculations for Steel
Connections
1.4.2 G MShoring and Temporary Bracing
SD-06 Test Reports
2.3 G MBolts, Nuts, and Washers
3.7.1.2 G MWeld Inspection Reports
3.7.2.1 G MDirect Tension Indicator Washer
Inspection Reports
3.7.3.1 G MBolt Testing Reports
3.7.4 G MEmbrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 98 PAGES
05 30 00 SD-02 Shop Drawings
1.3.3 G MFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
3.2.4.1Galvanizing Repair Paint
2.2.12Mechanical Fasteners
SD-04 Samples
2.1.1 G RMetal Roof Deck Units
2.2.3 G RFlexible Closure Strips
SD-05 Design Data
2.1 G MDeck Units
SD-07 Certificates
1.3.2.1Fire Safety
1.3.2.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 G MFraming Components
SD-03 Product Data
2.1Studs
2.1Recycled Content of Steel
Products
SD-05 Design Data
1.6.2 G MMetal Framing Calculations
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 98 PAGES
05 40 00 1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.7 G MFloor Gratings
2.8 G MBollards/Pipe Guards
2.10 G MRoof Hatches
SD-03 Product Data
2.4Corner Guards
2.7Floor Gratings
2.10Roof Hatches
2.1Recycled Content
SD-07 Certificates
2.1Certificates of Compliance
2.2Certified Mill
05 51 00 SD-02 Shop Drawings
2.1 G MIron and Steel Hardware
2.1 G MSteel Shapes, Plates, Bars, and
Strips
2.2.1 G MMetal Stair System
SD-03 Product Data
2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.3Hot-Rolled Carbon Steel Sheets and Strips
2.4.2Hot-Rolled Carbon Steel Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 98 PAGES
05 51 00 2.3.2Concrete Inserts
2.2.3Protective Coating
2.3.1Steel Stairs
SD-07 Certificates
1.3.1Welding Procedures
1.3.1Welder Qualification
SD-08 Manufacturer’s Instructions
2.2.3Protective Coating
05 51 33 SD-02 Shop Drawings
2.3 G MLadders
SD-03 Product Data
2.3Ladders
2.3.1Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G MFabrication Drawings
3.2 G MIron and Steel Hardware
3.2 G MSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1Structural-Steel Plates, Shapes, and Bars
2.2.2Hot-Rolled Carbon Steel Bars
2.2.4Concrete Inserts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 98 PAGES
05 52 00 2.2.6Steel Railings and Handrails
1.2.1Anchorage and Fastening
Systems
SD-07 Certificates
1.4.1Welding Procedures
1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
05 59 10 SD-01 Preconstruction Submittals
2.6.2 G M/RAssembly Tests
3.3 G M/RAcceptance Testing
SD-02 Shop Drawings
1.4.3 G MDetail Drawings
SD-03 Product Data
2.1.7Wheel Assemblies
1.4.3Materials List
2.4Welding
2.4.2Welding of Aluminum
2.4.4Steel Welding Repairs
SD-07 Certificates
1.4.1Welder Qualifications
2.4.2Welding of Aluminum
06 10 00 SD-02 Shop Drawings
1.7 G MBlocking
SD-06 Test Reports
1.4.2 G MPreservative-treated
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 98 PAGES
06 10 00 SD-07 Certificates
1.8.1Certificates of Grade
2.1.1Certified Sustainably Harvested
Virgin Lumber
1.7Preservative Treatment
2.2.2Indoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
3.3 G RTake-back Program
06 41 16.00 10 SD-02 Shop Drawings
2.6 G MShop Drawings
3.1 G MInstallation
SD-03 Product Data
2.1Wood Materials
1.5.2Certification
SD-04 Samples
2.2 G RPlastic Laminates
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
07 05 23 SD-01 Preconstruction Submittals
1.4 G M/RWork Plan
SD-03 Product Data
2.2Thermal Imaging Camera
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 98 PAGES
07 05 23 3.2 G MEnvelope Surface Area
Calculations
SD-06 Test Reports
3.5 G MPressure Test Procedures
1.6.4 G MAir Leakage Test Report
3.5.6 G MAir Leakage Test Report
1.6.4 G MDiagnostic Test Report
3.6.5 G MDiagnostic Test Report
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
07 11 13 SD-07 Certificates
1.3Materials
07 13 53 SD-03 Product Data
1.3Manufacturer's Standard Details
2.2Elastomeric Waterproofing Sheet
Material
2.4Protection Board
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-06 Test Reports
2.2 G MElastomeric Waterproofing Sheet
Material
3.6 G MField Quality Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 98 PAGES
07 13 53 3.7 G MProtective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
1.4Protective Coverings
1.8Special Warranties
1.8Special Warranties
2.1.1Certificates Of Compliance
2.1.2Certificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4Primers, Adhesives, and Mastics
2.2Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1 G M/RCertificates Of Compliance
2.1.2 G M/RCertificates Of Compliance
07 21 13 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Block or Board Insulation
2.2Pressure Sensitive Tape
2.3Accessories
2.1.4Recycled Content for Block or
Board Insulation
SD-07 Certificates
2.1Block or Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 98 PAGES
07 21 13 1.8Special Warranties
1.8Special Warranties
2.1.5Indoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.3.1Adhesive
07 22 00 SD-02 Shop Drawings
1.3 G MInsulation Board Layout
1.3 G MVerification of Existing Conditions
SD-03 Product Data
2.1Insulation
1.4Cover Board
2.4Fasteners
2.3Moisture Control
2.3.1.1Asphalt
2.1.2Recycled Content For Insulation
SD-06 Test Reports
1.7.1 G MFlame Spread Rating
SD-07 Certificates
1.6Installer Qualifications
1.6Certificates Of Compliance For
Felt Materials
2.1.3Indoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.4Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 98 PAGES
07 22 00 2.1Insulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 G MAir Barrier System Shop
Drawings
SD-03 Product Data
2.1Air Barrier System Product Data
SD-04 Samples
3.1.2 G RMock-Up
2.1 G RMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 G MDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 G MDesign Review Report
3.1.3 G MTesting and Inspection
SD-07 Certificates
1.7Air Barrier Inspector
07 42 13 SD-01 Preconstruction Submittals
1.5.3 G M/RQualification of Manufacturer
1.5.4 G M/RQualification of Installation
Contractor
1.8 G M/RWarranty
SD-02 Shop Drawings
1.5.1.1 G MInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 98 PAGES
07 42 13 2.2.1Wall Panels
2.2.2Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
2.7Aluminized Steel Repair Paint
1.5.5Accessories
2.5Accessories
SD-04 Samples
2.2.1 G RWall Panels
1.5.3.1 G RFasteners
2.5.3 G RMetal Closure Strips
2.2.2.5 G RColor chart
SD-05 Design Data
1.5.1.2 G MWind load design analysis
SD-06 Test Reports
3.7.2 G MLeakage Tests
1.3.2 G MWind Load Tests
2.2.2.6 G MCoating
2.2.2.6 G MChalking
1.3.2 G MSeismic Tests
SD-07 Certificates
1.5.3.1Coil Stock
1.5.3.1Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 98 PAGES
07 42 13 1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3Installation
SD-09 Manufacturer’s Field
Reports
3.8.1Manufacturer's Field Reports
SD-11 Closeout Submittals
1.8 G M/RWarranty
1.5.6 G M/RMaintenance Instructions
1.8.1 G M/R20 year 'No Dollar Limit' warranty
for labor and material
07 51 13 SD-03 Product Data
1.4.3Wind Uplift Calculations
2.4Asphalt
3.3.3Felts
3.3.3Felts
2.5.1Granule Surface Modified
Bitumen Cap Sheet
2.3Flashing Membrane
2.10Fasteners
2.6Primer
2.7Asphalt Roof Cement
2.12Walkpad Materials
2.8Cant Strips
2.11Pre-Manufactured Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 98 PAGES
07 51 13 2.11Pre-Manufactured Accessories
1.8Warranties
SD-06 Test Reports
3.5.3 G MSamples of Built-Up Roofing
SD-07 Certificates
1.5.1Bill of Lading
1.4.1Qualifications of Applicator
SD-08 Manufacturer’s Instructions
3.3.3Felts
3.3.3Felts
3.5.2Flashings
3.3.6Modified Bitumen Cap Sheet
2.4Asphalt
2.6Primer
3.2.1.2Roof Cement
2.10Fasteners
SD-11 Closeout Submittals
1.8 G M/RWarranty
3.6 G M/RInformation Card
07 60 00 SD-02 Shop Drawings
2.2.1 G MExposed Sheet Metal
3.1.16 G MGutters
3.1.17 G MDownspouts
3.1.22Expansion Joints
2.2.1 G MGravel Stops and fascia
3.1.18 G MSplash Pans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 98 PAGES
07 60 00 3.1.10 G MBase Flashing
3.1.11 G MCounter-flashing
3.1.23 G MFlashing at Roof Penetrations
and Equipment Supports
2.2.6 G MReglets
3.1.15 G MDrip Edges
3.1.19 G MOpen Valley Flashing
3.1.20 G MEave Flashing
2.1 G MRecycled Content
SD-04 Samples
1.4.2 G RFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G RCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.2 G MRoofing
SD-03 Product Data
2.1Roofing Panels
2.1Energy Star Label for Steel
Roofing Product
2.1.1Recycled Content for Steel
Roofing Product
2.3Attachment Clips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 98 PAGES
07 61 14.00 20 2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
1.7Warranty
SD-04 Samples
2.1 G RPanel
2.4 G RAccessories
2.4.3 G RSealants
2.2 G RIntermediate Support
SD-05 Design Data
1.5 G MDesign Calculations
SD-06 Test Reports
3.6 G MField Inspection
1.3.3 G MStructural Performance
1.6.6 G MFinish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
2.1Coil Stock
SD-08 Manufacturer’s Instructions
3.3Installation
SD-11 Closeout Submittals
3.8 G M/RInformation Card
1.7 G M/RWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 98 PAGES
07 84 00 SD-02 Shop Drawings
2.1 G MFirestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3 G MInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
SD-06 Test Reports
3.1 G MField Adhesion
SD-07 Certificates
2.1.1Indoor Air Quality For Interior
Sealants
2.1.3Indoor Air Quality For Interior
Floor Joint Sealants
2.5Indoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.2 G MDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 98 PAGES
08 11 13 2.2 G MRecycled Content for Steel Door
Product
2.7 G MFrames
2.7 G MRecycled Content for Steel Frame
Product
2.5 G MAccessories
2.8 G MWeatherstripping
SD-03 Product Data
2.2Doors
2.7Frames
2.5Accessories
08 51 23 SD-02 Shop Drawings
2.2 G MWindows
SD-03 Product Data
2.1.1Steel Framing Materials
2.1.1Recycled Content for Steel
Framing Materials
2.6.2Fasteners
2.2Accessories
2.6Accessories
SD-04 Samples
2.7.2 G RColor Coating
SD-06 Test Reports
1.3.1 G MAir Infiltration
1.3.1 G MWater Infiltration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 98 PAGES
08 51 23 1.3.2 G MMullion and Transom Bar Wind
Load
SD-10 Operation and Maintenance
Data
2.2 G RWindows
08 71 00 SD-02 Shop Drawings
1.3 G MManufacturer's Detail Drawings
1.3 G MVerification of Existing Conditions
1.5 G MHardware Schedule
2.3.6 G MKeying System
SD-03 Product Data
2.3Hardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 G RHardware Schedule
SD-11 Closeout Submittals
1.6.1 G M/RKey Bitting
08 81 00 SD-03 Product Data
1.4Insulating Glass
1.3Glazing Accessories
2.2.2.1Sealants
2.2.3Joint Backer
SD-04 Samples
1.4 G RInsulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 98 PAGES
08 81 00 2.2.1 G RGlazing Compound
2.2.4.1 G RTape
2.2.2.1 G RSealing Tapes
SD-07 Certificates
1.4Insulating Glass
SD-08 Manufacturer’s Instructions
2.2Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1 G M/RInsulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4 G MWall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 G RWall louvers
09 22 00 SD-02 Shop Drawings
2.1 G MMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1Recycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.7Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 98 PAGES
09 29 00 2.1.1Gypsum Board
2.1.1Recycled Content for Gypsum
Board
2.1.1Recycled Content for Paper
Facing and Gypsum Cores
2.1.4VOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1Indoor Air Quality for Gypsum
Board
09 51 00 SD-02 Shop Drawings
2.1 G MApproved Detail Drawings
SD-03 Product Data
1.9Acoustical Ceiling Systems
2.2.1.1Recycled Content for Type III
Ceiling Tiles
2.2.1.1Recycled Content for Type IV
Ceiling Tiles
2.3Recycled Content for Suspension
Systems
SD-04 Samples
2.2 G RAcoustical Units
2.2.1.1 G RAcoustical Ceiling Tiles
SD-06 Test Reports
2.1.1 G MCeiling Attenuation Class and
Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 98 PAGES
09 51 00 SD-07 Certificates
2.2.1.1Indoor Air Quality for Type III
Ceiling Tiles
2.2.1.1Indoor Air Quality for Type IV
Ceiling Tiles
2.2.1.1Indoor Air Quality for Type X
Ceiling Tiles
1.3.1.2Adhesives
2.8Indoor Air Quality for Sealants
09 65 00 SD-02 Shop Drawings
2.7 G MResilient Flooring and
Accessories
SD-03 Product Data
2.7Resilient Flooring and
Accessories
2.3Adhesives
SD-04 Samples
2.7 G RResilient Flooring and
Accessories
SD-06 Test Reports
3.3 G MMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1Indoor Air Quality for Wall Base
2.3Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 98 PAGES
09 65 00 3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.7 G RResilient Flooring and
Accessories
09 67 23.16 SD-04 Samples
1.3.1.1 G RJoint Sealant
1.3.2.3 G RJoint Sealant
1.3.1.2 G REpoxy Mortar Flooring System
1.3.2.4 G REpoxy Mortar Flooring System
1.3.3.2 G REpoxy Mortar Flooring System
2.3 G RWhite Aluminum Oxide Non-Skid
Grit
SD-06 Test Reports
1.3.1.1 G MJoint Sealant
1.3.2.3 G MJoint Sealant
1.3.1.2 G MEpoxy Mortar Flooring System
1.3.2.4 G MEpoxy Mortar Flooring System
1.3.3.2 G MEpoxy Mortar Flooring System
1.3.1.3 G MPrimer
1.3.1.4 G MGrout Coat
1.3.1.5 G MUrethane Topcoat
2.3 G MWhite Aluminum Oxide Non-Skid
Grit
1.7 G MPatch Test Demonstration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 98 PAGES
09 67 23.16 1.3.1.6 G MDaily Inspection Report
3.10.3 G MAdhesion Testing
SD-07 Certificates
1.3.2.1Work Plan
1.3.2.2Flooring System Applicator
Qualifications
1.3.1.1Joint Sealant
1.3.2.3Joint Sealant
1.3.1.2Epoxy Mortar Flooring System
1.3.2.4Epoxy Mortar Flooring System
1.3.3.2Epoxy Mortar Flooring System
1.3.2.5Warranty
SD-08 Manufacturer’s Instructions
1.3.1.1Joint Sealant
1.3.2.3Joint Sealant
1.3.1.2Epoxy Mortar Flooring System
1.3.2.4Epoxy Mortar Flooring System
1.3.3.2Epoxy Mortar Flooring System
1.3.3.3Water-Based Alkaline Degreaser
SD-11 Closeout Submittals
3.10.2.2 G M/RInspection Logbook
09 90 00 SD-02 Shop Drawings
3.11 G MPiping Identification
SD-03 Product Data
2.1Coating
3.2.5Sealant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 98 PAGES
09 90 00 SD-04 Samples
1.10 G RColor
1.5.2 G RTextured Wall Coating System
1.5.3 G RSample Textured Wall Coating
System Mock-Up
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2Qualification Testing
2.1Indoor Air Quality for Paints and
Primers
2.1Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.7.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 G RCoatings
09 97 13.00 40 SD-01 Preconstruction Submittals
Part 2 G M/RMaterial, Equipment, and Fixture
Lists
1.3 G M/RSafety Plan
SD-03 Product Data
2.1.1Abrasive Blasting Material
2.1.2Sealant Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 98 PAGES
09 97 13.00 40 2.1.3.1Inorganic Zinc
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
SD-04 Samples
1.3 G RManufacturer's Standard Color
Charts
3.3.2 G RInspection Forms
SD-05 Design Data
2.1.3 G MMix Designs
2.1.3.1 G MInorganic Zinc
2.1.3.1 G MInhibitive Polyamide Epoxy
2.1.3.1 G MAliphatic Polyurethane
SD-06 Test Reports
3.3.1 G MInspection Reports
2.1.3 G MTest Reports
SD-07 Certificates
2.1.1Abrasive Blasting Material
2.1.2Sealant Compound
3.2.1Inorganic Zinc Coating
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
SD-08 Manufacturer’s Instructions
2.1.3Protective Coatings
SD-11 Closeout Submittals
1.5 G M/RWarranty
09 97 13.15 SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 98 PAGES
09 97 13.15 1.4.4.1 G MEnvironmental Control System
1.4.4.2 G MUse of Door Sheet Access Way
SD-06 Test Reports
1.4.5.1 G MCoatings Qualification Inspection
Reports
1.4.5.4 G MNon-metallic Abrasive
Qualification Test Reports
1.4.5.2 G MMetallic Abrasive Qualification
Test Reports
3.1.3 G MCoating Sample Test Reports
3.1.4 G MAbrasive Sample Test Reports
3.9.2.2 G MInspection Report Forms
3.9.2.3 G MDaily Inspection Reports
1.4.5.3 G MRecycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.2.2Implement Corrective Action
1.4.3Coating Work Plan
1.4.6.13Coating Materials
1.4.6.14Non-metallic Abrasive
1.4.6.15Metallic Abrasive
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 98 PAGES
09 97 13.15 1.4.6.5Qualifications of Individuals
Performing Abrasive Blasting
1.4.6.6Qualifications of Individuals
Applying Coatings
1.4.6.7Qualifications of Individuals
Operating Plural Component
Equipment
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.8Qualifications of Testing
Laboratory for Coatings
1.4.6.9Qualifications of Testing
Laboratory for Abrasive
1.4.6.10Qualifications of Coating
Contractors
1.4.6.11Roof Joint Sealant Materials
1.4.6.12Roof Joint Sealant Compatibility
1.4.7Protective…