RFP: W912ER23R0001 P2# 479505
PROJECT: Bulk POL, UD 2.4 PROPOSER:
LOCATION: Jordan DATE:
Mobilization and Demobilization in accordance with the contract documents
0002 Site Survey in accordance with the contract documents
Construct Facility A Cut -and-Cover Bulk Fuel Storage Tanks 1 and 2 in accordance with the contract documents
Construct Facility B Pump Houses 1 and 2 in accordance with the contract documents
Construct Facility C Filter Building in accordance with the contract documents
Construct Facility D 50,000 Gallon Diesel Tanks in accordance with the contract documents
Construct Facility E Fill / Off-Load Stand in accordance with the contract documents
Construct Bulk POL Supporting Facilities in accordance with the contract documents
0008AA Demolition
0008AB Construct Site Electrical Distribution System
0008AC Construct Water Distribution Piping System
0008AD Construct Site Fire Water Piping System
0008AE Construct Site Sanitary Sewer Collection Piping System
0008AF Construct Site Communication Distribution System
0008AG Construct Site Storm Water Collection System
0008AH Construct Access Road
0008AJ Construct Parking
0008AK Construct Security Fence
0008AL Construct Perimeter Lighting
0008AM Construct Site Improvements
0 0 0 0 0 0 0 0 0
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL (ITEMS 0008AA - 0008AM)
OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
EXHIBIT 1 Page 1 of 2
RFP: W912ER23R0001 P2# 479505
PROJECT: Bulk POL, UD 2.4 PROPOSER:
LOCATION: Jordan DATE:
DIRECT
MATERIALS COST
SUB CONTRACTOR
COST
TOTAL
DIRECT
COST
LABOR MAN-HOURS DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
Option #1 R-11 Parking Pavement & five (5) GOV parking spaces in accordance with the contract documents
Option #2 Apron Pumps 4 & 5 in Pump House 1 and Apron Pumps 9 & 10 in Pump House 2 in accordance with the contract documents
Option #3 Backup Pump 3 in Pump House 1 and Backup Pump 8 in Pump House 2 in accordance with the contract documents
Option #4 Fill Stand Pantographs in accordance with the contract documents
Option #5 Stainless Steel Fuel Pipe in accordance with the contract documents
TOTAL BASE + OPTION PRICE (ITEMS 0001 - 0013)
TOTAL BASE BID PRICE (ITEMS 0001 - 0008)
TOTAL OPTION PRICE (ITEM 0009 - 0013)
EXHIBIT 1 Page 2 of 2
File details come from the government source that posted it. Updated .