Endorsement B Calculation of Work to be Performed.pdf
PDF 124 KB Posted
- Solicitation number
- W912ER-22-R-0008
About this file
This document contains an attachment for calculating self-performed work on a federal construction contract, along with details of a related solicitation. The attachment provides a template for contractors to identify and calculate the cost of work to be self-performed, including definitions of terms like self-performance, work on site, and total contract work. The related solicitation is from the U.S. Army Corps of Engineers and seeks bids to construct an electrical distribution system upgrade at a naval support facility in Bahrain to improve resiliency. Key details include the solicitation number, project name, requirement for constructing a more resilient medium-voltage system, opportunity type as a solicitation, and involved agency.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B - CALCULATION OF SELF-PERFORMED WORK
Use the following format to identify and calculate cost of the work to be self-performed. Various definitions which may be helpful in completing this form can be found on page 2, below.
A. Clearly describe the work to be self-performed:
B. Show Calculation of Self-Performed Work:
B.1 Total bid price: $ B.2 Subtract contractually-required design costs, if any: $ B.3 Subtract G&A, home office overhead, prime contractor's markups for profit, bond, DBA insurance, etc.:
B.4 Total amount of work to be performed under the contract: $ B.5 Work to be self-performed (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor's own employees; only those materials which will be both purchased and installed by the prime's own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor's own employees; and the contractor's own job overhead costs.):
B.6 % Self-performed work = Line B.5/ Line B.4 X 100% = % %
I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.
DATE NAME
POSITION, COMPANY
ATTACHMENT B - CALCULATION OF SELF-PERFORMED WORK
The following are definitions concerning self-performance of work by the Prime Contractor, in accordance with Section 00 72 00, FAR Clause 52.236-1, -
PERFORMANCE OF WORK BY THE CONTRACTOR.
"Self-performance of work", "On the site" and "Total amount of work to be performed under the contract" are defined below.
“Self-performance of work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor's own (not subcontract) employees;
only those materials which will be both purchased and installed by the prime's own (not subcontract) forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor's own employees; and the contractor's own job overhead costs.
The following is NOT self-performed work for purposes of the clause: Prime contractor markups for profit, general and administrative overhead, bonds, or other indirect costs on self-performed or subcontracted work; "Owner-operated equipment", rental of plant or equipment for operation by subcontractors; purchase of materials for installation by subcontractors.
"On the site" includes the construction site(s) as well as off-site fabrication plant or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the construction project.
“Total amount of work to be performed under the contract" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the contractor, including jobsite overhead costs, to construct the project. It generally includes all self-performed work, as defined above, and cost of all supplies, materials and subcontracts. It does not include design costs, home or branch office overhead costs or prime contractor markups for bond, profit, etc.”
File details come from the government source that posted it. Updated .