Attachment 1-6.pdf
PDF 397 KB Posted
- Attached to
- Amendment 0005 - Construction of Electrical Distribution System-P974 Federal contract opportunity
- Solicitation number
- W912ER-22-R-0008
About this file
This is a solicitation amendment for the construction of an electrical distribution system at a naval support activity in Bahrain. The project, referenced as P-974 Electrical System Upgrade, involves constructing a more resilient medium-voltage distribution system to support the growing mission-critical operations within the C5I Complex. This will provide increased resiliency through reduced single points of failure and a more flexible system to better manage outages and fluctuations, lessening impacts to critical facilities. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Middle East for a design-bid-build project.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
PAST PERFORMANCE OVERVIEW SHEET
List work which best illustrates current qualifications relevant to this award. Each contract listed on this sheet shall have a completed PROJECT SUMMARY FORM (Attachment 2) provided. Failure to furnish complete information on all sheets may result in the Government's rejection of your proposal. Mark Prime, Sub, or JV (ONLY ONE). Explain all projects provided on this sheet with a completed CONSTRUCTION EXPERIENCE FORM (Attachment 2).
Contract Name/Client, Location of
Performance Prime Sub Joint Total
Contract $ Amount
Offeror's Share of Responsibility for Total Construction
Contract SAMPLE: Operations Center, Kuwait
X $5,000,000 $3,000,000
1.
3.
4.
5.
6.
7.
8.
9.
OFFEROR’S NAME DATE
ATTACHMENT 2
PROJECT SUMMARY FORM
PROJECT No. (circle one): 1 2 3 4 5 6 7 8 9 10 Name of Offeror:
E-mail Address:
Telephone Number:
Project Title:
Contract Number:
Contract Amount (U.S. Dollar Amount) $
Contract Completion Date:
Contract Duration (Period of Performance):
Description of the Project’s Scope and Magnitude:
Location of Project:
Details of your company’s role and activities during construction of the project: (describe your role in this project. Include whether your firm participated as a prime or as a subcontractor. Provide details sufficient for evaluation purposes.)
ATTACHMENT 3
USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information CAGE Code:
Firm Name: UEINs Number: Address:
Phone Number: Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy): Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name: Title: Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND
ALL INFORMATION ON THIS FORM.
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
RFP: W912ER21R0002 P2# 474977
PROJECT: P-974 Electrical System Upgrade
LOCATION: Bahrain
ITEM NO. DESCRIPTION QTY UNIT AMOUNT TOTAL
Primary Facilities
Mobilization and Demobilization in accordance with the contract documents
1 JA
Perform Survey, in accordance with the contract documents
1 JA
Construct electrical distribution ductbanks and cabling, in accordance with contract documents
1 JA
Construct a Substation, in accordance with contract documents
1 JA
Construct automatic switchgear for the backup generators, in accordance with contract documents
1 JA
Provide upgrades to the Baseband Equipment Room III (BER III) power distribution equipment, panelboards, power distribution systems (PDU) including a redundant busway system, in accordance with contract documents
1 JA
Provide upgrades to Building #103 HVAC system and power distribution, in accordance with contract documents
1 JA
Perform phased demolition of identified existing facilities Building #102 (P3 Substation), in accordance with contract documents
1 JA
Total Base Bid Items 0001 - 0008
Options
Electronic Security System (ESS), in accordance with contract documents
1 JA
Total Option Bid Items 0009
PROPOSAL SCHEDULE
Base Bid Items
TOTAL (ITEMS 0001 - 0009)
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"
PROJECT: P-974 Electrical System Upgrade PROPOSER:
LOCATION: Bahrain DATE:
Primary Facilities
Mobilization and Demobilization in accordance with the contract documents
Perform Survey, in accordance with the contract documents
Construct electrical distribution ductbanks and cabling, in accordance with contract documents
Construct a Substation, in accordance with contract documents
Construct automatic switchgear for the backup generators, in accordance with contract documents
Provide upgrades to the Baseband Equipment Room III
(BER III) power distribution equipment, panelboards, power distribution systems (PDU) including a redundant busway system, in accordance with contract documents
Provide upgrades to Building #103 HVAC system and power distribution, in accordance with contract documents
OVERHEAD/
INDIRECT COST
PROFIT
TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
Unit of Measure and Qty
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
EXHIBIT 1 Page 1 of 2
PROJECT: P-974 Electrical System Upgrade PROPOSER:
LOCATION: Bahrain DATE:
OVERHEAD/
INDIRECT COST
PROFIT
TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
Unit of Measure and Qty
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
Perform phased demolition of identified existing facilities Building
#102 (P3 Substation), in accordance with contract documents
Total Base Bid Items 0001 - 0008
Options
Electronic Security System (ESS), in accordance with contract documents
Total Option Bid Items 0009
TOTAL (ITEMS 0001 - 0009)
EXHIBIT 1 Page 2 of 2
ATTACHMENT 5
RFI FOR PURPOSES OF CONDUCTING A RESPONSIBILITY DETERMINATION
RESPONSIBILITY DETERMINATION QUESTIONNAIRE
Directorate of
Contracting Dear Offeror:
As required by the Federal Acquisition Regulation (FAR) part 9 Contractor Qualifications, and Defense Federal Acquisition Regulation Supplement (DFARS) part 209, the Contracting Officer is conducting a responsibility determination and requires information from your firm as outlined below.
Information Regarding Responsibility
Determinations of responsibility involve subjective business judgments that are within the broad discretion of the contracting agency. The Contracting Officer is vested with broad discretion in exercising the business judgment involved in a responsibility determination.
This Questionnaire is not an additional non-pricing factor; the information requested below pertains to the offeror’s ability to perform the contract (if awarded) rather than the acceptability of the offer presented. Your responses to this Questionnaire will assist the Contracting Officer in making their responsibility determination. It is the duty of the offeror to supply all necessary documentation to establish its responsibility.
While this Questionnaire uses the term “offeror,” know that when determining an offeror’s responsibility, the Contracting Officer is required by the FAR to look at entities with relationships to the offeror, including (but not limited to) affiliates, subsidiaries, principals, and key personnel. As a result, in some cases, this Questionnaire seeks information regarding individuals that are connected to the offeror (generally key personnel, principals, etc.) as well as information regarding the offeror’s corporate relationships (generally affiliated concerns, subsidiaries, etc.). See FAR 19.001 and
SOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)
CUI//SP-SSEL/FEDONLY
19.101 for definitions regarding affiliated concerns; and see FAR 52.209-5 -- Certification Regarding Responsibility Matters for definitions regarding offeror principals.
If the offeror is proposing as a Joint Venture (JV), each member of the
JV shall respond to this questionnaire independently.
When responding to questions that have a fixed time period (e.g. a question that requests information related to any event “in the past five years”) calculate the time period duration from the date that you submit your response to this Questionnaire.
Be advised that this Questionnaire, or any follow up communication by the Agency regarding your response to this Questionnaire, does not constitute discussions, negotiations, or clarifications, as contemplated in FAR part 15.
The documentation requirements in this Questionnaire regarding page limitation, etc… apply to your response to this request, unless otherwise noted. Please be advised that all, or portions of your response, to this request for information may be incorporated into the awarded contract, should award be made to your firm.
The Contracting Officer is not limited to your responses in making a responsibility determination. The Contracting Officer must determine a prospective contractor non- responsible in the absence of adequate and timely information clearly indicating the contractor is responsible.
Your inability or unwillingness to provide this information will be considered in making this responsibility determination, and may result in a finding of non-responsibility.
Information Upon Which The Responsibility Determination Will Be
Based
To facilitate the Contracting Officer’s responsibility determination, please:
a) Complete and return:
1) Endorsement A (Financial Standing Questionnaire) and
b) Provide a narrative (not exceeding two pages) that states:
1) the offeror’s current credit rating;
2) evidence of the offeror’s financial resources (or to obtain such resources) to successfully perform the contract, considering all other outstanding obligations of the offeror;
and
3) whether the offeror has ever petitioned a government body to have its debts restructured, forgiven, liquidated, or otherwise dispatched in an insolvency proceeding (e.g.
filed for bankruptcy, or non-U.S. equivalent, including “liquidation” or “administration”), in any jurisdiction, at any time in the past five years, regardless of the ultimate resolution.
If the answer is in the affirmative relative to the filing of an insolvency proceeding, identify:
1) the country where the matter was filed;
2) the court or forum in which it was filed;
3) the assigned case number;
4) the date of filing;
5) when matter was resolved; and
6) how it was resolved.
7) Provide a narrative (which does not exceed five pages) regarding the offeror’s record of integrity and business ethics. At a minimum, your narrative must address:
• whether at any time in the past five years, the offeror has any subcontractors or suppliers that have been unpaid for a duration longer than the time required by the contract for payment. If the answer is in the affirmative, explain why payments to subcontractors or suppliers exceed the contractually allowed for payment timeline;
• whether the offeror has ever been contacted by a Contracting Officer, Administrative Contracting Officer, Contracting Officer’s Representative, or any other
U.S. Government employee, regarding any Combating Trafficking in Persons (CTIP) concern. In your response, identify the issue, the resolution, and the contract number;
• whether there have been any criminal convictions, in the last five years, of any of the offeror’s principals, owners, officers, any individuals identified as a Key Personnel in response to a non-pricing factor, or any person with any contractual authority on the resultant contract, if awarded; and
• any findings or citations by a judicial body or regulatory entity that the offeror has committed a violation of law or regulation, in any jurisdiction, regardless of resolution, in the last 5 years.
8) Provide the names and DUNS numbers (if any) of all of the offeror’s current owners, predecessors (within last 3 years), subsidiaries, and affiliated concerns that will be used in the performance of the resultant contract, if awarded. This is in accordance with FAR 52.209-5 -- Certification Regarding Responsibility Matters.
9) Provide the first and last name (and middle initial, if applicable) and job title of:
• all of the offeror’s principals;
• any person identified as a key personnel in response to any non-pricing evaluation criteria, if such is required; and
• any person with any contractual authority on the resultant contract, if awarded.
10)The Offeror shall provide a copy of a valid Jordan Commercial Registration Certificate (business license) in the offeror’s name for which it is submitting a proposal (as required by DFARS 252.225-7042 Authorization to Perform). If the name on the certificate does not match the name in which the proposal is submitted, the offeror shall submit documentation explaining the reason for the discrepancy and proof of the offeror’s legal ability to operate under the certificate.
If the offeror has a business license that will expire on or before May 18, 2021, the estimated date of award, the questionnaire shall include the offeror’s supported plan to extend and/or renew the certificate. A descriptive narrative, if required, shall be limited to no more than two (2) pages.
11)The offeror shall designate an individual to be responsible for CTIP compliance and a CTIP compliance plan implementation that complies with FAR Clause 52.222-50.
The designated position shall have the necessary authority to ensure compliance at all levels of the company and throughout the supply chain, and be able to ensure the accuracy of its certification to the Government. Additionally, the offeror shall submit a certification regarding trafficking in persons compliance in accordance with FAR Clause 52.222-56 paragraph (c).
Submission Requirements:
Please complete the above requested information as Volume III. In your response, please identify which documents are responsive to which subpart; however the Contracting Officer is not limited to your identification and may use any submitted document in response to any subpart as (s)he deems appropriate.
The Contracting Officer may require that some or all of these responses be updated in advance of award, should your firm be chosen for award.
The Responsibility Determination Questionnaire, Volume III, must be submitted electronically with your proposal submission.
Endorsement:
A - Financial Standing Questionnaire
ENDORSEMENT A
FINANCIAL STANDING QUESTIONNAIRE
A primary consideration in the source selection process is to determine an offeror’s qualification, responsibility, and financial standing. Prior to awarding a contract, per Federal Acquisition Regulation (FAR) Part 9, the Government must determine, through acceptable evidence, that an offeror has adequate financial resources, or the ability to obtain the financial resources, to perform the contract.
The substantive answers in Attachment A are to be completed by the offeror’s financial institution. Offerors should obtain a bank stamp or seal AND signature of the referenced individual on the questionnaire.
Failure to provide the requested information may render an offeror’s proposal non-responsible, and cause it to be removed from competition.
GENERAL INFORMATION (to be completed by the contractor):
Contractor’s Name and address:
Point of Contact:
Telephone:
Email:
Solicitation number:
RESPONDENT INFORMATION (to be completed by an authorized Financial Institution representative):
Full Name and Title:
Name of Financial
Institution: Address:
Telephone/Fax:
Email address:
1. Does the contractor have an active account(s) with your financial institution? If yes, how many?
2. How long have the account(s) been active?
3. What are the account(s) average balance (digits only)?
4. How many returns (insufficient funds) has the contractor had in the last 12 months?
5. Does the contractor currently have outstanding loans? If yes, a) how many; b) what are the balances due on those loans (digits only); and c) is the contractor making payments in accordance with the terms of the loans?
6. In the last 12 months, has the contractor been able to meet its financial obligations on time?
7. Does the contractor have a line of credit? If so, a) what is the credit limit (digits only); and
b) how much credit is presently available for use (digits only)?
If you need additional space to respond, please indicate that additional documentation was provided in response your above answers.
Certificate of Authority
I, certify that as of (Insert name)
(Insert job title)
I am duly authorized to execute this form.
(Insert corporation name)
Signature Date _______
(Financial Institution Seal/Stamp)
ATTACHMENT 6
CORPORATE CERTIFICATE
If a corporation submits the proposal, the Corporate Certificate at paragraph A below must be submitted. If the proposal is submitted by joint venture, a completed Corporate Certificate for each member of the joint venture and a copy of the joint venture agreement must be included with the proposal. Offerors may reproduce and submit these certificates on a separate sheet of paper.
A. CORPORATE CERTIFICATE
I, certify that I am the (Title) of the Corporation named as offer/contractor herein, that , who signed this proposal/contract on behalf of the offeror/Contractor was then of said corporation; that said proposal/contract was duly signed for and on behalf of said corporation by authority of its governing body and within the scope of its governing body and within the scope of its corporate powers.
(CORPORATE SEAL)
SIGNATURE
| ATTACHMENT 1.-3 |
| ATTACHMENT 1 |
| Attachment 4- Price Proposal and Cost Breakdown-P974 |
| CDC 474977 BA P-974 PROPOSAL SCHEDULE |
| CDC 474977 BA P-974 COST BREAKDOWNi |
| ATTACHMENT 5-6 |
| Information Regarding Responsibility |
| Information Upon Which The Responsibility Determination Will Be Based |
| Submission Requirements: |
| ENDORSEMENT A |
| Certificate of Authority |
| ATTACHMENT 6 |
| CORPORATE CERTIFICATE |
| A. CORPORATE CERTIFICATE |
File details come from the government source that posted it. Updated .