CDC VOL 4 of 4 P974 Specifications 29 Sep 21.pdf
PDF 7 MB Posted
- Attached to
- Amendment 0005 - Construction of Electrical Distribution System-P974 Federal contract opportunity
- Solicitation number
- W912ER-22-R-0008
About this file
This amendment to the solicitation for the construction of an electrical distribution system at the Naval Support Activity in Bahrain provides additional details on the requirement. The project, referenced as P-974 Electrical System Upgrade, aims to construct a more resilient medium-voltage distribution system to support critical facilities at the Command, Control, Communications, Computers, Collaboration and Intelligence Complex. The increased resiliency is intended to provide a more secure system with fewer single points of failure and a more flexible system to better manage outages and fluctuations. The amendment likely contains revisions to specifications, terms, or responses dates for the requirement to upgrade the electrical distribution infrastructure at the Navy base in Bahrain.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
W912ER22R0008
Specifications for
P974 Electrical Upgrade Naval Support Activity (NSA), Bahrain
Volume 4 of 4 Divisions 27 - 33
US Army Corps of Engineers
Middle East District
THIS PAGE INTENTIONALLY LEFT BLANK
Request for Proposal
W912ER21R0002
Specification Stamp Page for
P974 Electrical Upgrade
Naval Support Activity (NSA), Bahrain
US Army Corps of Engineers
Middle East District
P-974 - Bahrain Electrical Upgrades 474977
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 15 00.12 10 10/15 SUPPLEMENTARY REQUIREMENTS
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 32 17.12 10 MED 2/2017 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 05/11 SUBMITTAL PROCEDURES
01 35 26 11/15 (13 July 2020 M GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 11/14 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 10 11/16 QUALITY CONTROL
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 50 00 08/09 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.12 10 12/18 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19 PROJECT IDENTIFICATION
01 74 19 01/07 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 78 00 08/11 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 02/19 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
02 84 16 04/06 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DI VI SI ON 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16 ROUGH CARPENTRY
06 73 01 05/18 FIBERGLASS REINFORCED PLASTIC (FRP)
GRATING
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 05/14 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11 BITUMINOUS DAMPPROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12 FLUID-APPLIED WATERPROOFING
07 19 00 05/11 WATER REPELLENTS
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 21 23 05/11 LOOSE FILL THERMAL INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 05/14 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 54 19 02/13 POLYVINYL-CHLORIDE ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 51 23 08/11 STEEL WINDOWS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 05/11 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 01/08 LATH
09 24 23 08/17 CEMENT STUCCO
09 29 00 08/16 GYPSUM BOARD
09 65 30 01/20 RESILIENT WALL BASE AND ACCESSORIES
09 67 23 01/20 RESINOUS FLOORING
09 67 23.15 08/10 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 90 00 05/11 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 97 13.00 40 11/14 STEEL COATINGS
09 97 13.27 10/16 EXTERIOR COATING OF STEEL STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/17 INTERIOR SIGNAGE
10 26 00 08/17 WALL AND DOOR PROTECTION
10 44 16 05/15 FIRE EXTINGUISHERS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS
EQUIPMENT
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 2
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.01 02/19 LONWORKS DIRECT DIGITAL CONTROL FOR
HVAC AND OTHER BUILDING CONTROL SYSTEMS
23 35 19.00 20 02/10 INDUSTRIAL VENTILATION AND EXHAUST
23 64 26 08/09 CHILLED WATER PIPING SYSTEMS
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE, LIFE, SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY MONITORING
CONTROL SYSTEM (UMCS) TO INCLUDE HVAC
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL
SYSTEMS AUTOMATIC TRANSFER SWITCH,
GENERATOR CONTROL PANEL, FUEL CONTROL
SYSTEMS AND UNITERRUPTIBLE POWER
SUPPLY (UPS)
25 08 10 04/06 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 11 16 02/10 SECONDARY UNIT SUBSTATIONS
26 13 00 11/14 SF6/HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 20 00 02/14 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 27 14.00 20 02/11 ELECTRICITY METERING
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 04/06 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS
26 32 15.00 10 10/07 DIESEL-GENERATOR SET STATIONARY
100-2500 KW, WITH AUXILIARIES
26 32 16 01/20 PARALLELING CONTROL SYSTEMS
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
PROJECT TABLE OF CONTENTS Page 3
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 63.00 20 10/07 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM
SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 08/17 AGGREGATE BASE COURSES
32 16 15 04/08 CONCRETE BLOCK PAVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 04/08 HIGH-SECURITY CHAIN LINK FENCES AND
GATES
DI VI SI ON 33 - UTI LI TI ES
33 08 55 07/07 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 52 40 11/18 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/18 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 27 10 00
BUILDING TELECOMMUNICATIONS CABLING SYSTEM
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)
ECIA EIA/ECA 310-E (2005) Cabinets, Racks, Panels, and Associated Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ICEA S-90-661 (2012) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cables for Use in General Purpose and LAN Communications Wiring Systems Technical Requirements
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA/BICSI 568 (2006) Standard for Installing Building Telecommunications Cabling
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA WC 66 (2013) Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
SECTION 27 10 00 Page 1
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-1152 (2009) Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling
TIA-526-7 (2015a) OFSTP-7 Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant
TIA-568.0 (2009; Add 1 2010; Add 2 2012) Generic Telecommunications Cabling for Customer Premises
TIA-568.1 (2015d; Addendum 1, March 6, 2018) Commercial Building Telecommunications Cabling Standard
TIA-568.2 (2018d; Addendum 1, April 2019) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
TIA-568.3 (2016d; Addendum 1, January 17, 2019) Optical Fiber Cabling Components Standard
TIA-569 (2019e) Commercial Building Standard for Telecommunications Pathways and Spaces
TIA-606 (2017c) Administration Standard for the Telecommunications Infrastructure
TIA-607 (2015d; 2019) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)
UNDERWRITERS LABORATORIES (UL)
UL 1863 (2004; Reprint Sep 2016) UL Standard for Safety Communication Circuit Accessories
UL 444 (2008; Reprint Apr 2015) Communications Cables
UL 467 (2013; Reprint Jun 2017) UL Standard for Safety Grounding and Bonding Equipment
UL 514C (2014; Reprint Nov 2018) UL Standard for Safety Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers
UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems
SECTION 27 10 00 Page 2
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and Section 33 82 00 TELECOMMUNICATIONS, OUTSIDE PLANT (OSP), apply to this section with additions and modifications specified herein.
1.3 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568.1 , TIA-568.2 , TIA-569 , TIA-606 and IEEE 100 and herein.
1.3.1 Telecommunications Room (TR)
An enclosed space for housing telecommunications equipment, cable, terminations, and cross-connects. The room is the recognized cross-connect between the backbone cable and the horizontal cabling.
1.3.2 Entrance Facility (EF) (Telecommunications)
An entrance to the building for both private and public network service cables (including wireless) including the entrance point at the building wall and continuing to the equipment room.
1.3.3 Open Cable
Cabling that is not run in a raceway as defined by NFPA 70 . This refers to cabling that is "open" to the space in which the cable has been installed and is therefore exposed to the environmental conditions associated with that space.
1.3.4 Pathway
A physical infrastructure utilized for the placement and routing of telecommunications cable.
1.4 SYSTEM DESCRIPTION
The building telecommunications cabling, and pathway system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, service entrance facilities, work area pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for splicing, terminating, and interconnecting cabling necessary to transport telephone and data (including LAN) between equipment items in a building. The horizontal system shall be c in a star topology from the telecommunications work area to the floor distributor or campus distributor at the center or hub of the star. The backbone cabling and pathway system includes intrabuilding and interbuilding interconnecting cabling, pathway, and terminal hardware. The intrabuilding backbone provides connectivity from the floor distributors to the building distributors or to the campus distributor and from the building distributors to the campus distributor as required. The backbone system shall be wired in a star topology with the campus distributor at the center or hub of the star. The interbuilding backbone system provides connectivity between the campus distributors and is specified in Section 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP). Provide telecommunications pathway systems referenced herein as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
SECTION 27 10 00 Page 3
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Telecommunications drawings; G M
Telecommunications Space Drawings; G M
In addition to Section 01 33 00 SUBMITTAL PROCEDURES, provide shop drawings in accordance with paragraph SHOP DRAWINGS.
SD-03 Product Data
Telecommunications cabling (backbone and horizontal)
Patch panels
Telecommunications outlet/connector assemblies
Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Include performance and characteristic curves. Submittals shall also include applicable federal, military, industry, and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified in paragraph REGULATORY REQUIREMENTS and as required in Section
01 33 00 SUBMITTAL PROCEDURES.
SD-06 Test Reports
Telecommunications cabling testing; G M
SD-07 Certificates
Telecommunications Contractor Qualifications
Key Personnel Qualifications
Manufacturer Qualifications
Test plan
SD-09 Manufacturer's Field Reports
Factory reel tests
SD-10 Operation and Maintenance Data
Telecommunications cabling and pathway system Data Package 5; G R
SD-11 Closeout Submittals
SECTION 27 10 00 Page 4
Record Documentation; G M/R
1.6 QUALITY ASSURANCE
1.6.1 Shop Drawings
In exception to Section 01 33 00 SUBMITTAL PROCEDURES, submitted plan drawings shall be a minimum of 279 by 432 mm in size using a minimum scale of one mm per 100 mm. Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment.
Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices. Submittals shall include the nameplate data, size, and capacity. Submittals shall also include applicable federal, military, industry, and technical society publication references.
1.6.1.1 Telecommunications Drawings
Provide Registered Communications Distribution Designer (RCDD) approved drawings in accordance with TIA-606 . The identifier for each termination and cable shall appear on the drawings. Drawings shall depict final telecommunications installed wiring system infrastructure in accordance with TIA-606 . The drawings should provide details required to prove that the distribution system shall properly support connectivity from the EF/TR to the telecommunications work area outlets. Provide a plastic laminated schematic of the as-installed telecommunications cable system showing cabling, TR's for telecommunications keyed to floor plans by room number.
The following drawings shall be provided as a minimum:
a. T1 - Layout of complete building per floor - Building Area/Serving Zone Boundaries, Backbone Systems, and Horizontal Pathways. Layout of complete building per floor. The drawing indicates location of building areas, serving zones, vertical backbone diagrams, telecommunications rooms, access points, pathways, grounding system, and other systems that need to be viewed from the complete building perspective.
b. T2 - Serving Zones/Building Area Drawings - Drop Locations and Cable Identification (ID’S). Shows a building area or serving zone. These drawings show drop locations, telecommunications rooms, access points and detail call outs for common equipment rooms and other congested areas.
c. T4 - Typical Detail Drawings - Faceplate Labeling, Firestopping, Americans with Disabilities Act (ADA), Safety, Department of Transportation (DOT). Detailed drawings of symbols and typicals such as faceplate labeling, faceplate types, faceplate population installation procedures, detail racking, and raceways.
1.6.1.2 Telecommunications Space Drawings
Provide T3 drawings in accordance with TIA-606 that include telecommunications rooms plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, as well as elevations for cabinet/rack and/or wall. Drawings shall show layout of applicable
SECTION 27 10 00 Page 5 equipment including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, patch panels and equipment spaces and cabinet/racks. Drawings shall include a complete list of equipment and material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation. Drawings may also be an enlargement of a congested area of T1 or T2 drawings.
1.6.2 Telecommunications Qualifications
Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications contractor and key personnel.
Qualifications shall be provided for: the telecommunications system contractor, the telecommunications system installer, and the supervisor (if different from the installer). A minimum of 30 days prior to installation, submit documentation of the experience of the telecommunications contractor and of the key personnel.
1.6.2.1 Telecommunications Contractor
The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business of the applications, installation, and testing of the specified telecommunications systems and equipment.
The telecommunications contractor shall demonstrate experience in providing successful telecommunications systems within the past 3 years of similar scope and size. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for the telecommunications contractor.
1.6.2.2 Key Personnel
Provide key personnel who are regularly and professionally engaged in the business of the application, installation and testing of the specified telecommunications systems and equipment. There may be one key person or more key persons proposed for this solicitation depending upon how many of the key roles each has successfully provided. Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within the past 3 years.
Supervisors and installers assigned to the installation of this system or any of its components shall be Building Industry Consulting Services International (BICSI) Registered Cabling Installers, Technician Level.
Submit documentation of current BICSI certification for each of the key personnel.
In lieu of BICSI certification, supervisors and installers assigned to the installation of this system or any of its components shall have a minimum of 3 years' experience in the installation of the specified copper and fiber optic cable and components. They shall have factory or factory approved certification from each equipment manufacturer indicating that they are qualified to install and test the provided products. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for each of the key personnel.
Documentation for each key person shall include at least two successful system installations provided that are equivalent in system size and in construction complexity to the telecommunications system proposed for this solicitation. Include specific experience in installing and testing telecommunications systems and provide the names and locations of at least
SECTION 27 10 00 Page 6 two project installations successfully completed using optical fiber and copper telecommunications cabling systems. All the existing telecommunications system installations offered by the key persons as successful experience shall have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation.
Provide the name and role of the key person, the title, location, and completed installation date of the referenced project, the referenced project owner point of contact information including name, organization, title, and telephone number, and generally, the referenced project description including system size and construction complexity.
Indicate that all key persons are currently employed by the telecommunications contractor or have a commitment to the telecommunications contractor to work on this project. All key persons shall be employed by the telecommunications contractor at the date of issuance of this solicitation, or if not, have a commitment to the telecommunications contractor to work on this project by the date that the bid was due to the Contracting Officer.
Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work on this solicitation's telecommunications system. Key personnel shall function in the same roles in this contract, as they functioned in the offered successful experience. Any substitutions for the telecommunications contractor's key personnel requires approval from The Contracting Officer.
1.6.2.3 Minimum Manufacturer Qualifications
Cabling, equipment and hardware manufacturers shall have a minimum of 3 years' experience in the manufacturing, assembly, and factory testing of components which comply with TIA-568.1 , and TIA-568.2 .
1.6.3 Test Plan
Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the components and accessories for each cable type specified, 60 days prior to the proposed test date. Include procedures for certification, validation, and testing.
1.6.4 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.6.5 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product
SECTION 27 10 00 Page 7 shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.6.5.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.6.5.2 Material and Equipment Manufacturing Date
Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise.
1.7 DELIVERY AND STORAGE
Provide protection from weather, moisture, extreme heat and cold, dirt, dust, and other contaminants for telecommunications cabling and equipment placed in storage.
1.8 ENVIRONMENTAL REQUIREMENTS
Connecting hardware shall be rated for operation under ambient conditions of 0 to 60 degrees C and in the range of 0 to 95 percent relative humidity, noncondensing.
1.9 WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.10 MAINTENANCE
1.10.1 Operation and Maintenance Manuals
Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system, Data Package
5. Submit operations and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein not later than 2 months prior to the date of beneficial occupancy. In addition to requirements of Data Package 5, include the requirements of paragraphs TELECOMMUNICATIONS DRAWINGS, TELECOMMUNICATIONS SPACE DRAWINGS, and RECORD DOCUMENTATION. Ensure that these drawings and documents depict the as-built configuration.
1.10.2 Record Documentation
Provide T5 drawings including documentation on cables and termination hardware in accordance with TIA-606 . T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel layouts and cover plate assignments, cross-connect information and
SECTION 27 10 00 Page 8 connecting terminal layout as a minimum. T5 drawings shall be provided in both hard copy format and on electronic media using Windows based computer cable management software. A licensed copy of the cable management software including documentation, shall be provided. Provide the following T5 drawing documentation as a minimum:
a. Cables - A record of installed cable shall be provided in accordance with TIA-606 . The cable records shall include the required data fields for each cable and complete end-to-end circuit report for each complete circuit from the assigned outlet to the entry facility in accordance with TIA-606 . Include manufacture date of cable with submittal.
b. Termination Hardware - A record of installed patch panels, cross-connect points, distribution frames, terminating block arrangements and type, and outlets shall be provided in accordance with TIA-606 . Documentation shall include the required data fields in accordance with TIA-606 .
PART 2 PRODUCTS
2.1 COMPONENTS
Components shall be UL, or third-party certified. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations, submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard. Provide a complete system of telecommunications cabling and pathway components using star topology. Provide support structures and pathways, complete with outlets, cables, connecting hardware and telecommunications cabinets/racks.
Cabling and interconnecting hardware and components for telecommunications systems shall be UL listed or third-party independent testing laboratory certified and shall comply with NFPA 70 and conform to the requirements specified herein.
2.2 TELECOMMUNICATIONS PATHWAY
Provide telecommunications pathways in accordance with TIA-569 and as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
2.3 TELECOMMUNICATIONS CABLING
Cabling shall be UL listed for the application and shall comply with TIA-568.0 , TIA-568.1 , TIA-568.2 and NFPA 70 . Provide a labeling system for cabling as required by TIA-606 and UL 969 . Ship cable on reels or in boxes bearing manufacture date for Foil/unshielded twisted pair (F/UTP) in accordance with ICEA S-90-661 for all cable used on this project. Cabling manufactured more than 12 months prior to date of installation shall not be used.
2.3.1 Horizontal Cabling
Provide horizontal cable in compliance with NFPA 70 and performance
SECTION 27 10 00 Page 9 characteristics in accordance with TIA-568.1 .
2.3.1.1 Horizontal Copper
Provide horizontal copper cable, F/UTP, 100 ohms in accordance with TIA-568.2 , UL 444 , ANSI/NEMA WC 66 , ICEA S-90-661 . Provide four each individually foil/twisted pair conductors, Category 6, with a blue thermoplastic jacket. Cable shall be imprinted with manufacturers name or identifier, flammability rating, gauge of conductor, transmission performance rating (category designation) and length marking at regular intervals in accordance with ICEA S-90-661 . Provide plenum (CMP), riser (CMR), or general purpose (CM or CMG) communications rated cabling in accordance with NFPA 70 . Substitution of a higher rated cable shall be permitted in accordance with NFPA 70 . Cables installed in conduit within and under slabs shall be UL listed and labeled for wet locations in accordance with
NFPA 70 .
2.4 TELECOMMUNICATIONS SPACES
Provide connecting hardware and termination equipment in the telecommunications entrance facility as shown on design drawings for terminating and cross-connecting permanent cabling. Provide telecommunications interconnecting hardware color coding in accordance with TIA-606 .
2.4.1 Backboards
Provide void-free, interior grade A-C plywood 19 mm thick as indicated on drawings. Backboards shall be fire-rated by manufacturing process. Fire stamp shall be clearly visible. Backboards shall be provided on a minimum of two adjacent walls in the telecommunication spaces.
2.4.2 Connector Blocks
Provide insulation displacement connector (IDC) Type 110 for Category 6 systems. Provide blocks for the number of horizontal and backbone cables terminated on the block plus 25 percent spare.
2.4.3 Cable Guides
Provide cable guides specifically manufactured for the purpose of routing cables, wires and patch cords horizontally and vertically on 482.6 mm equipment racks telecommunications backboards. Cable guides of ring or bracket type devices mounted on backboard for horizontal cable management and individually mounted for vertical cable management. Mount cable guides with screws, and/or nuts and lock washers.
2.4.4 Patch Panels
Provide ports for the number of horizontal and backbone cables terminated on the panel plus 25 percent spare. Provide pre-connectorized copper patch cords for patch panels. Provide patch cords, as complete assemblies, with matching connectors as specified. Patch cords shall meet minimum performance requirements specified in TIA-568.1 and TIA-568.2 for cables, cable length and hardware specified.
2.4.4.1 Modular to 110 Block Patch Panel
Provide in accordance with TIA-568.1 and TIA-568.2 . Panels shall be third-
SECTION 27 10 00 Page 10 party verified and shall comply with EIA/TIA Category 6 requirements.
Panel shall be constructed of 2.2 mm minimum aluminum and shall be rack and/or wall mounted, as specified on drawings, and compatible with an ECIA EIA/ECA 310-E 482.6 mm (19 inch) equipment rack. Panel shall provide 48 non-keyed, 8-pin modular ports, wired to T568A. Patch panels shall terminate the building cabling on Type 110 IDCs and shall utilize a printed circuit board interface. The rear of each panel shall have incoming cable strain-relief and routing guides. Panels shall have each port factory numbered and be equipped with laminated plastic nameplates above each port.
2.5 TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES
2.5.1 Outlet/Connector Copper
Outlet/connectors shall comply with FCC Part 68 , TIA-568.1 , and TIA-568.2 .
UTP outlet/connectors shall be UL 1863 listed, non-keyed, 8-pin modular, constructed of high impact rated thermoplastic housing and shall be third-party verified. Outlet/connectors provided for F/UTP cabling shall meet or exceed the requirements for the cable provided. Outlet/connectors shall be terminated using a Type 110 IDC PC board connector, color-coded for T568A wiring. Each outlet/connector shall be wired T568A. F/UTP outlet/connectors shall comply with TIA-568.2 for 200 mating cycles. F/ UTP outlet/connectors installed in outdoor or marine environments shall be jell-filled type containing an anti-corrosive, memory retaining compound.
2.5.2 Cover Plates
Telecommunications cover plates shall comply with UL 514C , and TIA-568.1 , TIA-568.2 , TIA-568.3 ; flush design constructed of high impact thermoplastic material, ivory, or match existing building in color and consistent with receptacle/switch cover plates specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide labeling in accordance with the paragraph LABELING in this section.
2.6 TERMINAL CABINETS
Construct of zinc-coated sheet steel, as indicated. Trim shall be fitted with hinged door and locking latch. Doors shall be maximum size openings to box interiors. Boxes shall be provided with 16 mm backboard with two-coat varnish finish. Match trim, hardware, doors, and finishes with panelboards. Provide label and identification systems for telecommunications wiring and components consistent with TIA-606 .
2.7 GROUNDING AND BONDING PRODUCTS
Provide in accordance with UL 467 , TIA-607 , and NFPA 70 . Components shall be identified as required by TIA-606 . Provide ground rods, bonding conductors, and grounding busbars as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Test per TIA-607 specifications.
2.8 FIRESTOPPING MATERIAL
Provide as specified in Section 07 84 00 FIRESTOPPING.
2.9 MANUFACTURER'S NAMEPLATE
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a
SECTION 27 10 00 Page 11 conspicuous place; the nameplate of the distributing agent will not be acceptable.
2.10 FIELD FABRICATED NAMEPLATES
ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position. Nameplates shall be melamine plastic, 3 mm thick, white with black center core. Surface shall be matte finish.
Corners shall be square. Accurately align lettering and engrave into the core. Minimum size of nameplates shall be 25 by 65 mm. Lettering shall be a minimum of 6.35 mm high normal block style.
2.11 TESTS, INSPECTIONS, AND VERIFICATIONS
2.11.1 Factory Reel Tests
Provide documentation of the testing and verification actions taken by manufacturer to confirm compliance with TIA-568.1 , TIA-568.2 , TIA-526-7 for single mode optical fiber.
PART 3 EXECUTION
3.1 INSTALLATION
Install telecommunications cabling and pathway systems, including the horizontal and backbone cable, pathway systems, telecommunications outlet/connector assemblies, and associated hardware in accordance with NECA/BICSI 568 , TIA-568.0 , TIA-568.1 , TIA-568.2 , TIA-569 , NFPA 70 , and UL standards as applicable. Provide cabling in a star topology network.
Pathways and outlet boxes shall be installed as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Install telecommunications cabling with copper media in accordance with the following criteria to avoid potential electromagnetic interference between power and telecommunications equipment. The interference ceiling shall not exceed
3.0 volts per meter measured over the usable bandwidth of the telecommunications cabling.
3.1.1 Cabling
Install F/UTP, and optical fiber telecommunications cabling system as detailed in TIA-568.1 and TIA-568.2 . Screw terminals shall not be used except where specifically indicated on plans. Use an approved insulation displacement connection (IDC) tool kit for copper cable terminations. Do not exceed manufacturers' cable pull tensions for copper. Provide a device to monitor cable pull tensions. Do not exceed 110 N pull tension for four pair copper cables. Do not chafe or damage outer jacket materials. Use only lubricants approved by cable manufacturer. Do not over cinch cables, or crush cables with staples. For F/UTP cable, bend radii shall not be less than four times the cable diameter. Cables shall be terminated; no cable shall contain unterminated elements. Cables shall not be spliced. Label cabling in accordance with paragraph LABELING in this section.
3.1.1.1 Horizontal Cabling
Install horizontal cabling as indicated on drawings. Do not untwist Category 6 F/UTP cables more than 12 mm from the point of termination to
SECTION 27 10 00 Page 12 maintain cable geometry. Provide slack cable in the form of a figure eight (not a service loop) on each end of the cable, 3 m in the telecommunications room, and 304 mm in the work area outlet.
3.1.2 Pathway Installations
Provide in accordance with TIA-569 and NFPA 70 . Provide building pathway as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
3.1.3 Service Entrance Conduit, Overhead
Provide service entrance overhead as specified in Section 26 20 00
INTERIOR DISTRIBUTION SYSTEMS.
3.1.4 Service Entrance Conduit, Underground
Provide service entrance underground as specified in Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM.
3.1.5 Cable Tray Installation
Install cable tray as specified in Section 26 20 00 INTERIOR DISTRIBUTION
SYSTEM.
3.1.6 Work Area Outlets
3.1.6.1 Terminations
Terminate F/UTP cable in accordance with TIA-568.1 , TIA-568.2 and wiring configuration, as specified on drawings.
3.1.6.2 Cover Plates
As a minimum, each outlet/connector shall be labeled as to its function and a unique number to identify cable link in accordance with the paragraph LABELING in this section.
3.1.6.3 Cables
Unshielded twisted pair and fiber optic cables shall have a minimum of 304 mm of slack cable loosely coiled into the telecommunications outlet boxes. Minimum manufacturer's bend radius for each type of cable shall not be exceeded.
3.1.6.4 Pull Cords
Pull cords shall be installed in conduit serving telecommunications outlets that do not have cable installed.
3.1.7 Telecommunications Space Termination
3.1.7.1 Connector Blocks
Connector blocks shall be as indicated on drawings and mounted in orderly rows and columns. Adequate vertical and horizontal wire routing areas shall be provided between groups of blocks. Install in accordance with industry standard wire routing guides in accordance with TIA-569 .
SECTION 27 10 00 Page 13
3.1.7.2 Patch Panels
Patch panels shall be mounted as indicated on drawings and with sufficient ports to accommodate the installed cable plant plus 25 percent spares.
a. Copper Patch Panel. Copper cable entering a patch panel shall be secured to the panel with cable ties or as recommended by the manufacturer to prevent movement of the cable.
3.1.7.3 Equipment Support Frames
Install in accordance with TIA-569 :
a. Racks, floor mounted modular type. Permanently anchor rack to the floor in accordance with manufacturer's recommendations.
3.1.8 Grounding and Bonding
Provide in accordance with TIA-607 , NFPA 70 and as specified in Section
26 20 00 INTERIOR DISTRIBUTION SYSTEM.
3.2 LABELING
3.2.1 Labels
Provide labeling in accordance with TIA-606 . Handwritten labeling is unacceptable. Stenciled lettering for voice and data circuits shall be provided using thermal ink transfer process or laser printer.
3.2.2 Cable
Cables shall be labeled using color labels on both ends with identifiers in accordance with TIA-606 .
3.2.3 Termination Hardware
Workstation outlets and patch panel connections shall be labeled using color coded labels with identifiers in accordance with TIA-606 .
3.3 FIELD APPLIED PAINTING
Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Painting shall be as specified in Section 09 90 00 PAINTS AND COATINGS.
3.4 FIELD FABRICATED NAMEPLATE MOUNTING
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
3.5 TESTING
3.5.1 Telecommunications Cabling Testing
Perform telecommunications cabling inspection, verification, and performance tests in accordance with TIA-568.1 and TIA-568.2 Test equipment shall conform to TIA-1152 . Perform optical fiber field inspection tests via attenuation measurements on factory reels and provide
SECTION 27 10 00 Page 14 results along with manufacturer certification for factory reel tests.
Remove failed cable reels from project site upon attenuation test failure.
3.5.1.1 Inspection
Visually inspect F/UTP and optical fiber jacket materials for UL or third-party certification markings. Inspect cabling terminations in telecommunications rooms and at workstations to confirm color code for T568A pin assignments and inspect cabling connections to confirm compliance with TIA-568.1 and TIA-568.2 . Visually confirm Category 6, marking of outlets, cover plates, outlet/connectors, and patch panels.
3.5.1.2 Verification Tests
UTP backbone copper cabling shall be tested for DC loop resistance, shorts, opens, intermittent faults, and polarity between conductors, and between conductors and shield, if cable has overall shield. Test operation of shorting bars in connection blocks. Test cables after termination but prior to being cross-connected.
3.5.1.3 Performance Tests
Perform testing for each outlet as follows:
a. Perform Category 6 link tests in accordance with TIA-568.1 and TIA-568.2 .
Tests shall include wire map, length, insertion loss, NEXT, PSNEXT, ELFEXT, PSELFEXT, return loss, propagation delay, and delay skew.
3.5.1.4 Final Verification Tests
Perform verification tests for F/UTP and systems after the complete telecommunications cabling and workstation outlet/connectors are installed.
a. Voice Tests. These tests assume that dial tone service has been installed. Connect to the network interface device at the demarcation point. Go off-hook and listen and receive a dial tone. If a test number is available, make and receive a local, long distance, and DSN telephone call.
b. Data Tests. These tests assume the Information Technology Staff has a network installed and are available to assist with testing. Connect to the network interface device at the demarcation point. Log onto the network to ensure proper connection to the network.
c. Grounding and Bonding - Provide tests per TIA-607 .
-- End of Section --
SECTION 27 10 00 Page 15
SECTION 27 10 00 Page 16
SECTION 28 08 10
ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
05/16
PART 1 GENERAL
1.1 SUMMARY
This specification defines the process and procedures for initial acceptance testing of Electronic Security Systems (ESS) to include intrusion detection, access control and video as well as associated power and communications. Requirements to plan, conduct, and document all testing activities are covered along with the Government responsibility to witness testing and review and approve submittals. During the acceptance test, demonstrate that, without exception, the completed and integrated ESS complies with the contract requirements.
1.2 DEFINITIONS
The Government Representative is a qualified individual given specific authority to witness system acceptance testing and evaluate the results.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-05 Design Data
Test Plan; G M
SD-06 Test Reports
Draft Test Report; G M
Final Test Report; G M
SD-07 Certificates
Qualifications
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 General
The Test Director, Operator, and Technician must have prior experience with the specific equipment, hardware and software installed under the contract.
1.4.1.2 Test Director
The Test Director must have at least five years of hands-on ESS experience
SECTION 28 08 10 Page 1 to include any combination of design, installation, testing and maintenance.
1.4.1.3 Operator
The Operator must have at least two years of hands-on experience installing and maintaining ESS workstations to include both hardware and software. The Operator must be capable of demonstrating all workstation features and capabilities.
1.4.1.4 Technician
The technician must have at least two years of hands-on experience installing and maintaining ESS field equipment to include sensors, card readers, cameras, local processors, and communications equipment. The Technician must be capable of demonstrating all features and capabilities of ESS field equipment. Qualifications may be met by the individual experience of one technician or by the combined experience of a team of technicians.
1.4.1.5 Test Intruder
The purpose of the test intruder is to activate intrusion sensors in a realistic and repeatable manner. The test intruder must be between 1780 to 1830 mm tall and weigh between 80 to 85 kg. The test intruder must possess enough physical strength, agility, and endurance to perform movements required for intrusion testing. These movements may include, but are not limited to, walking, running, crawling, jumping, and climbing.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 TEST PLAN
Clearly establish the scope for ESS testing prior to beginning testing.
Submit a Test Plan that addresses the following topics:
3.1.1 Personnel
Identify the Test Director, Operator, Technician, Test Intruder, and any other personnel that will be performing test activities.
3.1.2 Equipment
List all equipment that is required to support testing. State the purpose of each piece of equipment. Describe equipment that will be used to enable voice communications between the monitoring location and the field.
3.1.3 Procedures
Provide a step-by-step procedure for conducting each functional test.
Describe actions and expected results. Ensure that functional test procedures address performance standards described in contract specifications.
Download example procedures from
SECTION 28 08 10 Page 2 http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example procedures to meet specific project requirements and develop additional ones as needed.
3.1.4 Special Provisions
Discuss any special test provisions such as facility access, safety, integration with existing systems, and coordination with other work.
3.1.5 Test Logs
Provide logs for recording all data from functional testing and burn-in testing.
Download example logs from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example logs to meet specific project requirements and develop additional ones as needed.
3.1.6 Schedule
Provide an overall schedule that includes all testing milestones.
3.2 PRE-ACCEPTANCE TESTING
Conduct a complete test of all field equipment, workstations, and central system hardware and software in accordance with the approved Test Plan.
The Test Director must be on site to conduct a pre-test inspection and oversee all testing activities. Prior to testing, visually inspect all ESS components and correct workmanship and neatness deficiencies as needed. During the pre-test inspection, verify the accuracy of redline drawings and update drawings as needed. Conduct testing in two phases -functional testing followed by burn-in testing.
3.2.1 Phased Testing
3.2.1.1 Functional Testing Phase
During the functional testing phase, verify system performance in accordance with approved Test Plan. Record results in approved Test Logs and provide a written explanation of each failure to include cause, corrective action, and retest result. Continue functional testing until all tests have been successfully completed with no unresolved failures.
3.2.1.2 Burn-In Testing Phase
Begin burn-in testing after successful completion of all functional testing. During the burn-in testing phase, place the ESS in normal operating mode and evaluate system performance for a continuous 24-hour period. During this time, the ESS must be fully functional and programmed such that all features can be exercised and evaluated through normal use.
Record all system anomalies in approved Test Logs. Include a description of each anomaly along with any actions taken in response. Immediately correct minor deficiencies observed during testing and continue with burn-in testing. Determine the root cause of any failures and make necessary repairs or modifications to restore full functionality. After a failure is corrected repeat functional tests for components and features associated with the failure and repeat the entire burn-in testing phase.
SECTION 28 08 10 Page 3
3.2.2 Draft Test Report
Prepare and submit a Draft Test Report detailing the results of the testing. Refer to paragraph FINAL TEST REPORT for required content.
Includ…