W912EP23B0008 Pre Solicitation Site Visit Memo and Attendance Roster.pdf

PDF 2 MB Posted

Attached to
San Juan Harbor Construction and Maintenance Dredging, 44-Foot and 36-Foot Project, San Juan, Puerto Rico
Solicitation number
W912EP23B0008
Issued by

About this file

This memorandum documents a pre-solicitation site visit for solicitation number W912EP23B0008. Work associated with the solicitation consists of construction and maintenance dredging in designated areas of the San Juan Harbor federal navigation channel and Puerto Rico Ports Authority berthing areas. Dredging will deepen and widen various channels and basins to required depths ranging from 36 to 47 feet, including the entrance channel, Anegado Channel, Army Terminal Channel, cruise ship terminal channels, Puerto Nuevo Channel, Graving Dock Channel and anchorage area. The project also includes maintenance dredging, widening the Army Terminal Channel by 100 feet, and dredging PRPA berthing areas. All dredged material will be disposed of in the San Juan Ocean Dredge Material Disposal Site. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Jacksonville for work to be performed in San Juan, Puerto Rico.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

JACKSONVILLE DISTRICT CORPS OF ENGINEERS, ANTILLES OFFICE

ANNEX BUILDING, FUNDACIÓN ÁNGEL RAMOS

2ND FLOOR, SUITE 202 FRANKLIN DELANO ROOSEVELT AVENUE #383

SAN JUAN, PUERTO RICO 00918

CESAJ-DS-CD 22 March 202

MEMORANDUM FOR RECORD

SUBJECT: Solicitation W912EP23B0008, San Juan Harbor Construction and Maintenance Dredging, 44-Foot and 36-Foot Project, San Juan, PR, Pre-Solicitation Site Visit

1. A pre-solicitation site visit for subject project was conducted on 21 March 2023, from 0900 to 1010 hours. The contractor participants are included on the attendance sheet enclosed to this memorandum. USACE Participants included Adeline Fuata, Ian Heausler, Alessandro Soares, Jorge Ayala-Burgos, and Anibal Mercado-Soto.

2. The participants met at the Pan-American Pier parking lot. The site visit initiated at the Pan-American Pier and then the participants walked thru the pier and observed the San Antonio Channel, and the Cruise Terminals from the distance. Then the participants drove in a group to the Army Terminal where they were escorted to the pier to observe the Army Terminal Channel, Bahia de Puerto Nuevo and the Port of San Juan.

3. Participants were reminded to submit any questions to the Contracting Officer through ProjNet.

4. If you have any questions or require additional information regarding this matter, please contact the undersigned at 561-801-8447.

Encl Anibal Mercado-Soto, P.E.

Contracting Officer’s Representative

MERCADO-

SOTO.ANIBAL.150602

Digitally signed by MERCADO-

SOTO.ANIBAL.1506023510

Date: 2023.03.22 12:24:37 -04'00'

File details come from the government source that posted it. Updated .